    Disclaimer IMPORTANT NOTICE The purpose of this presentation is to provide general information about Magnetite Mines Limited ("MGT"). It is not recommended that any person makes any investment decision in relation to MGT based on this presentation. This presentation contains certain statements which

  3. Slide 3: Question reliability of iron ore forecasts

    Question reliability of iron ore forecasts Peak steel in 2015? Iron ore oversupply? “BHP Billiton is expecting at least another ten “China’s steel production has already hit a peak, years of iron ore oversupply before the market or to put it another way, it has hit a turning balances out.” point.” Z

  4. Slide 4: Strong fundamentals, especially for high-grade

    Strong fundamentals, especially for high-grade Source: World Steel Association Source: Fastmarkets MB Slide 4. 4.

  5. Slide 5: Premium Grade is a Major Advantage

    Fastmarkets iron ore index grade spreads (US$/tonne) Premium Grade in Demand 60 Premium Grade is 40 a Major Advantage 20 0 US$/t -20 “To succeed in decarbonizing the global steelmaking industry there needs to be a -40 greater recognition of how much the iron ore supply base needs to change. Vast -60

  6. Slide 6: The Braemar and Razorback: Large Resource, Long Life

    Large Resource, Long Life The Braemar and Razorback LARGE, ACCESSIBLE MINERAL RESOURCES  Company Mineral Resources of 5.7Bt including Muster Dam1,2,3,4  Soft ore amenable to crushing & grinding (8-10 kwh/tonne)  240km to Adelaide from Razorback. ESTABLISHED INFRASTRUCTURE NEARBY  Heavy freight o

  7. Slide 7: Corporate Overview: Capital Structure

    Corporate Overview CAPITAL STRUCTURE Shares 3,159 M 180 0.10 160 0.09 Unlisted 153.1M 0.08 Options (various – avg. 140 0.07 $0.03) 120 Share Price* A$0.034 Share price (A$) 0.06 Volume (m) 100 0.05 80 0.04 Market Cap* A$107M 60 0.03 40 0.02 *As at 25 Mar 2022 20 0.01 - - Mar 21 Apr 21 May 21 Jun 21

  8. Slide 8: Delivering Premium Iron Ore to High Demand Markets

    Delivering Premium Iron Ore to High Demand Markets Long Life Low Initial High Grade Delivering with Optionality Project Capital Product 5.7bn tonne resource Staged development First ore on ship with expansion approach with ESG 68% Fe product 5 planned for late potential 1,2,3 advantages Higher grade

  9. Slide 9: Existing Infrastructure, Minimal Capital

    Minimal Capital Existing Infrastructure  50km purpose built private all weather haul road and rail siding  Existing open access heavy freight network – 25t axle loads  Whyalla Port expected to have capacity for increased throughput  Benefit of existing rail access infrastructure and trans-shipme

  10. Slide 10: Simple Mining with Head Grade Upside

    Simple Mining with Head Grade Upside  Ore mined from surface – minimal pre-strip5  Ore haul for initial box cut all downhill, flat waste dumps  Low PFS strip ratio of 0.10:1  Grade uplift potential from selective mining and/or ore sorting  Lateral stratigraphic continuity  New geophysics regre

  11. Slide 11: Processing to 68% product grade

    Processing to 68% product grade [New logo]  15.5Mtpa processing module layout designed by Hatch with 3Mtpa production capacity  Capital cost estimated to AACE Class 5 level  Economies of scale and scope in capital and operating costs  A final product of P80 40 microns is estimated - DFS metallur

  12. Slide 12: Environment, Social and Governance (ESG)

    Environment, Social and Governance (ESG)  During March we hosted a Ngadjuri heritage team as they began the process to record the regional cultural heritage values. Over 1,100ha of Country walked and surveyed, with follow up surveys planned.  Higher-grade ores produce lower-emission steel  Invest

  13. Slide 13: Attractive, Staged Development Pathway

    Expansion Potential Attractive, Staged Development Pathway STAGE 1 STAGE 2 STAGE 3 15.5Mtpa plant capacity 31.0Mtpa plant capacity 46.5Mtpa plant capacity = 3Mtpa capacity = 5Mtpa capacity = 7Mtpa capacity A STAGED DEVELOPMENT APPROACH offering outstanding returns with future expansion options  DFS

  14. Slide 14: Highlights: Compelling Economics

    Compelling Economics Key operational and financial metrics Highlights PFS Plant Staged Single- Unit Step Optimised1 Expansion Expansion  STAGED DEVELOPMENT PATHWAY Stage 1 Stage 1,2, 3 Stage 1, 3  DFS based on 3Mtpa of capacity and minimum upfront capital Model duration Years 30 33 32  Expansion

  15. Slide 15: Unlocking the Braemar

    Magnetite Resource and Reserves (JORC Code 2012)* Large Resource, Long Life Unlocking the Braemar Stage 1 Relies On Only 8% 4% 0.3% of resource. of Braemar of tenure strike. area. *In addition to Magnetite Resource and Reserves (JORC Code 2012), the Muster Dam Iron Project holds a historical (JORC 2

  16. Slide 16: Indicative Development Schedule

    Indicative Development Schedule* 2021 2022 2023 2024 2025 Pre-Feasibility Study DFS – Funding DFS – Study Decision to Mine Project Financing Permitting, Enviro & Native Title Detailed Design Procurement Construction & Commissioning Production *Schedule subject to review as part of DFS currently unde

  17. Slide 17: First Quartile competitor on a value/margin basis

    Competiting The on cost curve Iron Ore Market First Quartile competitor on a value/margin basis VIU-adjusted total cash cost curve - CFR North China Total cash cost curve - CFR North China Source: Wood Mackenzie, Magnetite Mines Source: Wood Mackenzie, Magnetite Mines Wood MacKenzie’s Value-In-Use (

  18. Slide 18: Delivering Premium Iron Ore: Next Steps

    Next Steps Delivering Premium Iron Ore to High Demand Markets DELIVERING ADVANCE THE DFS – RAZORBACK EXPANSION FINANCE OPTIONALITY work programs DRILLING underway programs DEMONSTRATED Planning and Future infrastructure Meeting key lender engagement of requirements for Hydrology – requirements key e

  19. Slide 19: References

    References 1. ASX Announcement – 24/05/21 – Razorback Iron Project Mineral Resource Upgrade 2. ASX Announcement – 20/11/18 – Ironback Hill Deposit – JORC 2012 Resource Update 3. ASX Announcement – 01/03/21 – Muster Dam Iron Project Tenements awarded to Magnetite Mines 4. ASX Announcement – 30/06/21

  20. Slide 20: Appendix