Silver Spruce Resources Inc. · TSXV:SSE

Silver Spruce Resources — Investor Presentation (September 2012)

26 slides from Silver Spruce Resources's investor presentation, September 2012

  1. Slide 1: Investor Presentation

    EXPERIENCE • VISION • VALUE Investor Presentation September 2012 TSXV: SSE

  2. Slide 2: Safe Harbour Statement

    Safe Harbour Statement TSXV: SSE Investors are cautioned that, except for statements of historical fact, certain information contained in this document includes "forward-looking information” with respect to a performance expectation for SSE. Such forward-looking statements are based on current expec

  3. Slide 3: Presentation Overview

    Presentation Overview  Corporate Summary  Big Easy -Property Overview  Epithermal Model  Results To Date  2012-2013 Program  Uranium Update  REE Update 3

  4. Slide 4: Our Company

    Our Company TSXV: SSE Newfoundland and Labrador focus Prospect Portfolio  Gold / Silver  Uranium  Rare Earth Elements Early Stage Value Generator 4

  5. Slide 5: Leadership Team

    Leadership Team Peter Dimmell - President and CEO  40 plus years experience as a geologist  Past President PDAC  Director/Board Member of several Junior Mining Co’s Lloyd Hillier - Chairman  Successful Labrador entrepreneur & business owner Gordon Barnhill - CFO & VP Corporate  25 Years in inve

  6. Slide 6: Corporate Summary

    Corporate Summary Sept 11, 2012 Listing TSXV: SSE Head office Bridgewater, Nova Scotia Shares Issued 111,607,805 Warrants 7,809,596 Options 11,185,000 Fully diluted 128,912,401 52 week High/Low $0.10 - $0.03 Share Price Range $.05-$.07 Market Capitalization 7,124,507 Cash $200,000 Debt Nil 6

  7. Slide 7: Big Easy – Gold Silver Prospect

    Big Easy – Gold Silver Prospect  Big System - pervasive alteration / mineralization  294 Claims - subject to 3% NSR (buyback of 1.5%)  Classic epithermal style gold / silver prospect  Core area -1.7 km strike x 300-500m wide  Potential strike length of 5 km plus ET zone BE Sinter 7

  8. Slide 8: Big Easy – Location

    Big Easy – Location TSXV: SSE  Island of Newfoundland - East Coast  2 hrs. from St. John’s / 20 minutes from Clarenville  5 km off Trans Canada Highway – Road accessible  Power line passes through property QUEBEC Deer Deer Lake Lake  Corner Corner TTC CHH   Brook Brook Gander Gander  Gra

  9. Slide 9: Big Easy – Looking North

    Big Easy – Looking North TSXV: SSE Trans Canada Hwy Grassy Pond Power Line 2012 Drilling Trench #6 9

  10. Slide 10: Big Easy Prospect – Exploration History

    Big Easy Prospect – Exploration History 2010 Program  Geology / Prospecting  Trenching – 6 trenches  Geophysics - IP 2011 - Phase I Drilling Program  7 holes / 1577m  1.2 km strike length Phase II Drilling – 2012  5 holes / 1080m Right click to open hyperlink  200 m strike length 10

  11. Slide 11: Big Easy Prospect – Regional Model

    Big Easy Prospect – Regional Model  Northern extension of the 250 km Burin Peninsula high sulphidation belt  Mineralization hosted in silicified sedimentary units near faults Growing Recognition as a Significant District  Silver Spruce’s exploration and drilling  Recent work by NL Geological Sur

  12. Slide 12: Big Easy Prospect – Model

    Big Easy Prospect – Model Big Easy Drilling 7

  13. Slide 13: Big Easy Prospect – 2011 Drilling Program

    Big Easy Prospect – 2011 Drilling Program  7 DDH - 1577m  Over a 1.2 km strike length  Deepest hole - 365m / 276m TVD Objectives  Test alteration, IP targets and surface geology / rock samples Assay Highlights  Best intersections deep – brecciated veins / silicified pyritic breccia  6 g/t Au /

  14. Slide 14: Big Easy Prospect – 2011 Drilling Program

    Big Easy Prospect – 2011 Drilling Program What We Learned  Large / Extensive System  alteration is pervasive and continues to depth  Gold/Silver in epithermal veins and breccias  Classic epithermal textures  chalcedonic quartz, calcite blading (boiling)  Structural information on vein orientat

  15. Slide 15: Big Easy Prospect – 2012 Drilling Program

    Big Easy Prospect – 2012 Drilling Program  5 DDH - 1080m, 200m strike length  Deepest hole - 230m / 199m TVD Objectives  Test zone in area of best 2011DD intersection BE-11-3  Test structural input on vein orientation by drilling to the west  Structural and mineralogical information Highlights

  16. Slide 16: Big Easy Prospect – 2012 Drilling Program

    Big Easy Prospect – 2012 Drilling Program What We Learned  Confirmed vein orientations - intersected more veins  Two mineralization types  Silver enriched – up to 276 g/t w/ significant gold values  Gold enriched with minor silver values  Better understanding of location in the epithermal syste

  17. Slide 17: Big Easy Prospect Model

    Big Easy Prospect Model Trench 6 Big Easy Drilling Level 7 Adapted from Standard Epithermal Model

  18. Slide 18: Big Easy – Drilling Highlights

    Big Easy – Drilling Highlights TSXV: SSE Hole # (TV Depth) Length m Au g/t Ag g/t BE 11-3 (231 m) 30.5 0.87 33 including 7.0 2.5 74 including 1.5 6.1 174 including 1.0 6.0 114 BE 11-5 (176 m) 6.5 0.16 32.2 including 1.5 0.46 49 BE 11-7 (247 m) 6.0 1.4 2 including 1.0 7.6 10 BE 12-9 (199 m) 2.3 0.42

  19. Slide 19: Big Easy – Drilling Highlights

    Big Easy – Drilling Highlights TSXV: SSE Hole # (TV Depth) Length m Au g/t Ag g/t BE-12-10 (209) 4.6 0.62 18.4 including 0.2 2.11 191 including 0.3 4.1 90 and 11.25 0.8 3.8 including 1.5 1.97 4 including 0.75 2.3 8 BE-12-11 ( 177) 2.5 1.7 33.5 including 0.4 4.39 69 BE-12-12 (202) 8.7 1.3 36.7 includ

  20. Slide 20: Big Easy – 2012 - 2013 Program

    Big Easy – 2012 - 2013 Program Ongoing 2012 Program:  Airborne Survey - High Resolution Magnetic / VLF-EM  3D Compilation - Caracle Creek Int. Consulting  Mineralogical Studies - Research partnership Proposed 2013 Program:  Deep Penetration Ground Geophysics - $300,000  IP / MT Survey – Titan 2

  21. Slide 21: Labrador Uranium

    Labrador Uranium Central Mineral Belt (CMB) – Labrador  Key properties remain in good standing  consolidation of properties  SSE committed to the district  CMB Joint Venture - 2% NSR on 115 km2  Fish Hawk Lake Acquisition  Bullish on mid to long term outlook for uranium 22

  22. Slide 22: Labrador Uranium Activity

    Labrador Uranium Activity TSXV: SSE 3 Year Moratorium lifted April 2012 Aurora / Paladin-Michelin Deposit  135 M lbs U3O8 resources  Significant 2012 and onward exploration / development program Crosshair Energy Armstrong – Moran Corridor - approx. 10 M lbs U3O8 indicated / inferred Two Time Zone

  23. Slide 23: SSE - Labrador CMB Uranium Holdings

    SSE - Labrador CMB Uranium Holdings Crosshair - Two Time Zone  2.33 M pounds U3O8 indicated (1.82M tonnes - 0.058%) N  3.73 M pounds U3O8 inferred (3.16M tonnes - 0.053%)  Actively drilling for more tonnes SSE - Snegamook Zone  206 ppm U308 (0.41 lbs/ton) over 73 m  Along strike from Two Time z

  24. Slide 24: SSE - Labrador CMB Uranium Holdings

    SSE - Labrador CMB Uranium Holdings N Crosshair - Two Time Deposit SSE - 2% NSR Property Boundary SSE - Snegamook Zone 100% 25

  25. Slide 25: SSE – REE Labrador

    SSE – REE Labrador TSXV: SSE Pope’s Hill REE Trend  district scale opportunity  excellent location, with road access, power and a port  Great Western Minerals Group JV on part of the regional play 26

  26. Slide 26: Key Messages

    Key Messages:  Experienced leadership  Big Easy Gold /Silver – accessible district scale property  Uranium in Labrador - Committed to being a long-term player  Systematic approach to exploration and development Thank you for your interest! TSXV:SSE 28

Silver Spruce Resources — Investor Presentation (September 2012) on 6ix