Golden Predator Mining — Investor Presentation (September 2015)
21 slides from Golden Predator Mining's investor presentation, September 2015
Slide 1: Corporate Presentation September 2015
CORPORATE PRESENTATION SEPTEMBER 2015
Slide 2: Disclaimer
Disclaimer ©2015 Golden Predator Mining Corp. All rights reserved. Unless otherwise noted, “Golden Predator” and all other marks used in this presentation are trademarks of Golden Predator (the “Company”). Any reproduction or dissemination of any feature of this presentation, in whole or in part, or
Slide 3: Corporate Highlights
Corporate Highlights Advancing the Brewery Creek project and 3 Aces project while limiting expenditures Brewery Creek Project Attractive valuation with reasonable timelines and capital costs to develop to production Brewery Creek Preliminary Economic Assessment released in Q4, 2014 Anticipated Minin
Slide 4: Corporate Projects Overview
Corporate Projects Overview Brewery Creek Project Past producing heap leach gold mine with expanded current oxide resources and several new discoveries. A preliminary economic assessment was completed in Q4 2014 3 Aces Project High grade gold project in Southeast Yukon with recent drill program and
Slide 5: Corporate Structure
Corporate Structure Share Structure Market Capitalization (@ $0.145) 4.6 mm Shares Issued and Outstanding 31.7 mm Stock Options 1.1 mm Fully Diluted 32.8 mm Institutional Management (As of September 18, 2015) Retail Brewery Creek Circa Late 1990s Prominent Shareholders • Till Capital Ltd. (~38%) • W
Slide 6: Leadership
Leadership William M. Sheriff, MSc| Co-Chairman • Chairman and founder of enCore Energy Corp., Golden Predator, also serves as Chairman of Timberline Resources and Silver Predator Corp. • Co-founder and Chairman of Energy Metals Corporation, NYSE listed company sold to Uranium One for $1.8 billion d
Slide 7: Brewery Creek Project - Overview
Brewery Creek Project - Overview • Past open pit heap leach producer from 1996- 2002 before closing due to low gold prices • Preliminary Economic Assessment completed in Q4, 2014 • Since 2009, +$30 MM spent on drilling approximately 100,000 meters increasing indicated and inferred resources by 400%
Slide 8: Brewery Creek Preliminary Economic Assessment
Brewery Creek Preliminary Economic Assessment(1) PEA Summary Mine Plan and Operating Assumptions Total Oxide mined from Open Pits (tonnes) 10,264,000 Total Waste mined from Open Pits (tonnes) 43,520,000 Strip Ratio open pits 4.2:1 Total Gold Ounces Contained 445,000 Average Diluted Grade g/t Gold Op
Slide 9: Brewery Creek Preliminary Economic Assessment
Brewery Creek Preliminary Economic Assessment(1) Base Case $1250/oz. Gold Truck and shovel operation mining from eight PEA Capital and Operating Costs open pits with reprocessing of portion of former Capital Costs (including contingency) Total Direct Capital $59,480,000 leach material Capitalized
Slide 10: 3 Aces Project - Overview
3 Aces Project - Overview • High grade gold discovery in SE Yukon • RAB Drill blast-hole program confirmed continuity of high grade gold from surface including: 2.5 ft of 9.73 oz/t (333.50 g/t) gold in hole 3ARAB15-11; 7.5ft of 3.04 oz/t (104.39 g/t) gold in 3ARAB15-12; and 7.5 ft of 4.64 oz/t (158.
Slide 11: 3 Aces Project
3 Aces Project Shear Hosted Orogenic Vein System with Bonanza Grade Gold Au Rec., Gravity Gr-tail CN Combined Gr & Gr-tail • Large sample (500-800kg) Metallurgical tests Sample % GR-1 CN-1 CN returned gold recoveries of 93.5 to 98.3%(10) BS-3A13-03 Conc. 78.9 90.2 97.9 Tail 21.1 9.80 2.1 GR-2 CN-2 •
Slide 12: 3 Aces Project: Sleeping Giant Vein
3 Aces Project: Sleeping Giant Vein Winter 2015-2016 Bulk Sample Program • RAB blast hole drilling, in advance of bulk sampling, tested a portion of the Sleeping Giant vein where previous channel sampling by Golden Predator (formerly Northern Tiger Resources Ltd.) returned grades up to 3.88 oz/t (13
Slide 13: 3 Aces Project: Sleeping Giant Vein
3 Aces Project: Sleeping Giant Vein Winter 2015-2016 Bulk Sample Program Sleeping Giant Zone - RAB Significant Results Table(12) • Gold mineralization was intersected in all Hole From (ft) To (ft) Thickness (ft)1 Au oz/t2 Au g/t3 holes sampled at or near the surface 3ARAB15-01 0.00 2.50 2.50 1.39 47
Slide 14: 3 Aces Project: Sleeping Giant Vein
3 Aces Project: Sleeping Giant Vein Winter 2015-2016 Bulk Sample Program • The Company expects to initially extract and ship approximately 550 short tons (500 tonnes) of high grade vein material targeting the top 2.5 feet to 7.5 feet of the vein as dictated by 3-D analysis of the RAB drill results(1
Slide 15: Castle West, Nevada
Castle West, Nevada Epithermal Volcanic Hosted Gold Project • Heap leachable oxide gold target in Nevada’s Walker Lane Gold Trend • Paved and gravel road accessible 30 miles west of Tonopah, Nevada • Previous exploration by Kinross has identified three primary areas of gold mineralization: • Castle
Slide 16: Castle West, Nevada
Castle West, Nevada • Volcanic hosted, low sulfidation epithermal gold system • Project was most recently explored by Kinross (2008- Picture? Or have Joe make 2010), including: another map… • 769 surface rock chip samples collected with a mean value of 579 ppb. • 35 reverse circulation drill holes c
Slide 17: Sonora Gulch Project
Sonora Gulch Project • Large, multi-centre porphyry system located between Casino Deposit (WRN.T) and Freegold Mountain Deposit (NFR.V); new proposed Casino road to provide improved access for Sonora Gulch Project • Potential for high grade and bulk tonnage mineralization over 9 km2 gold anomaly, in
Slide 18: Grew Creek Project
Grew Creek Project • Bonanza epithermal gold system located within the Tintina Trench • Analogous to Midas, Sleeper, Comstock deposits in Great Basin Nevada • AMB drilled ~20,000 meters from 2010-2011 at the Carlos Zone, intercepts include: • GCRC11‐326 - 76 m of 2.22 g/t gold including 2 m of 15.55
Slide 19: Marg Deposit
Marg Deposit • Currently under option to Minquest Limited • Polymetallic VMS deposit with a current mineral resource estimate(3) • Existing resource open to expansion with numerous untested targets • 40 km winter road from Keno City; airstrip on site • Camp and heavy equipment on site • Class 3 Quar
Slide 20: Endnotes
Endnotes 1) NI 43-101 Technical Report on Preliminary Economic Assessment for the Brewery Creek Property, Yukon Territory, Canada, Tetra-Tech EBA dated November 19, 2014 and filed on SEDAR. 2) Northern Tiger News Release dated November 4, 2010. 3) NI 43-101 Technical Report, Marg Volcanoegenic Massi
Slide 21: www.goldenpredator.com
510-580 Hornby Street Vancouver, BC Canada V6C 3B6 Investor Relations T: 214-304-9552 E: info@goldenpredator.com www.goldenpredator.com