Collective Mining Ltd · TSX:CNL

Collective Mining — Investor Presentation (September 2025)

29 slides from Collective Mining's investor presentation, September 2025

  1. Slide 1: A Team with a Proven Track Record Has Made Another Major Discovery in Colombia

    A TEA M WITH A PROVE N TRAC K RE COR D O F SU C CE SS HA S MA DE ANOTHER MA JOR D ISC OVERY I N C OLOMBI A

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute an offering of securities and the information contained herein is subject to the information contained in the Company's continuous disclosure documents. All amounts expressed in Canadian $ unless otherwise stipulated. Forward-looking Statements This p

  3. Slide 3: The Collective Edge: Track Record of Creating Value

    Track Record of Creating Value The Collective Edge Well trusted, knowledgeable and successful management team in Colombia. Built the largest gold mine in Colombia Highly specialized talent in generating Sold for C$2 billion (in EV) March 2020 grassroot exploration targets has (550% return) resulted

  4. Slide 4: Capital Structure and Analyst Research

    Capital Structure and Analyst Research Analyst Research Coverage Firm: BMO Capital Markets Common Shares Outstanding 84.9M Analyst: Andrew Mikitchook Stock Options 5.0M Target price: C$23.00 Fully Diluted Shares Outstanding 89.9M Firm: Scotiabank Analyst: Ovais Habib Cash * US$70.6M Target price: C$

  5. Slide 5: Board of Directors and Key Management

    Board of Directors Key Management Ned Jalil Ari Sussman, Executive Chairman CEO Former CEO and director of Continental Gold, which was sold to Zijin Former Chief Technical Officer at Kinross Gold with 25+ years Mining for $2 billion. Raised over $1 billion for various mining related leading global g

  6. Slide 6: Colombia: A Well Established Mining Jurisdiction

    Colombia: A Well Established Mining Jurisdiction Cerro Matoso Cerrejón Project Company Commodity Stage Type Cerro Matoso South 32 Ni Production Open-pit El Descanso Cordero Cerrejón Glencore Coal Production Open-pit Buriticá San Antonio El Descanso Drummond Coal Production Open-pit Segovia El Santua

  7. Slide 7: Caldas the most desirable mining jurisdiction in Colombia

    500+ year mining history – Pro-mining area of Colombia Caldas the most desirable mining Industrial based economy with excellent infrastructure jurisdiction in High level of education Colombia Excellent security 7

  8. Slide 8: Operating in an Established Mining Camp Contiguous to a Multi-Million Ounce Producing Mine

    Operating in an Established Mining Camp Located Contiguous to a Multi-Million Ounce Producing Mine Option to earn 100% interest in the Guayabales and San Antonio projects. Located next to Aris Mining’s multi-million-ounce Marmato project which is currently in construction. District never consolidate

  9. Slide 9: Guayabales: Seven Targets to be Drilled in 2025

    Guayabales: Seven Targets to be Drilled in 2025 10 permitted & operating mines in a 3km area within an established mining camp. Multiple discoveries made through reconnaissance drilling since 2022. 120,000+ meters of drilling completed. 9

  10. Slide 10: Apollo System Section: High-Grade Continuity from Surface

    Apollo System Section: High-Grade Continuity from Surface 10

  11. Slide 11: Apollo System Section: High-Grade Continuity from Surface

    Apollo System Section: High-Grade Continuity from Surface 11

  12. Slide 12: Apollo vs Marmato: Two Giants Side by Side

    Apollo vs Marmato: Two Giants Side by Side **Please refer to disclaimer slide #2 for cautionary statement. 12

  13. Slide 13: Deep Drilling Aligns with Potential Future Development

    Deep Drilling Aligns with Potential Future Development Approximate location of the Panamerican Highway 13

  14. Slide 14: Apollo: Large-Scale and Continuing to Expand

    Apollo: Large-Scale and Continuing to Expand Two Deposits at Different Elevations: • Shallow: Bulk tonnage Au-Ag-Cu-W Deposit • Deep: Potentially Reduced Intrusion Related (Au-Ag-Bi-Te) • 72,500 meters (159 holes) completed Expansion drilling underway (4 rigs) • Test high-grade subzones to improve o

  15. Slide 15: X Target: New Greenfield Silver Discovery

    X Target: New Greenfield Silver Discovery New silver rich discovery announced September 2025 Multi-vein system with two holes covering 500m x 500m x 300m and open everywhere Drill being mobilized with drilling to resume in October, 2025 15

  16. Slide 16: San Antonio: Ideally Located with Three Rigs Turning

    San Antonio: Ideally Located with Three Rigs Turning 16

  17. Slide 17: San Antonio's Pound Target: Significant Discovery

    San Antonio’s Pound Target: Significant Discovery New Au-Ag-Cu-Mo porphyry & overprinting CBM vein system discovery made in 2025 Approx. 500m of strike and open in all directions Two rigs currently testing Pound 17

  18. Slide 18: Upcoming Catalysts: 70,000 Metre Program for 2025

    Upcoming Catalysts: 70,000 Metre Program for 2025 Guayabales Project Targets (7 Drill Rigs) 1 Apollo: Six rigs turning expanding the high-grade Ramp Zone at depth and infilling upper Apollo 2 Trap: Surface work vectoring to the porphyry source ahead of resumption of drilling in Q1, 2026 3 X: New sil

  19. Slide 19: Sustainability: The Collective Model – Dialogue Platform

    Sustainability: The Collective Model – Dialogue Platform Multi-stakeholder platform focused on energy efficiency, conservation, social, economic and infrastructure development. Key achievements to date: Energy transition as one of the articulating axes of the process. 27/33 signatories to the volunt

  20. Slide 20: Sustainability Best Practices

    Sustainability Best Practices Partnerships to Strengthen 2023 a Year of Success University of Caldas Alliance Our Communities Strategic alliance with the A total of $600,000 was invested, Jointly implementing academic Coffee Growers Committee of through our alliances, benefitting and research projec

  21. Slide 21: Project Portfolio: 100% Owned with Remaining Payments

    Project Portfolio: 100% Owned with Remaining Payments No Third Party Royalties on Either Project Guayabales Project: San Antonio Project 100% Ownership Earned in June 2025 Title 100% Owned with Residual with Residual Payments Outstanding Payments Outstanding Year Amount (US$) Year Amount (US$) 2025

  22. Slide 22: Appendix

    Appendix D ISCO V ERIN G C O LOM BIA’S N E XT WO RLD - C LA SS M INE RA L DE PO SIT

  23. Slide 23: Guayabales: A Major Complex with Significant Dimensions

    Guayabales: A Major Complex with Significant Dimensions 23

  24. Slide 24: Apollo System: Select Drill Results

    Apollo System: Select Drill Results 24

  25. Slide 25: Apollo: Outcropping in High-Grade Oxide Mineralization

    Apollo: Outcropping in High-Grade Oxide Mineralization High-Grade Au-Ag-Cu-Wo3 System 25

  26. Slide 26: Apollo Model: Remarkable Mineral Endowment (Cross Section)

    Apollo Model: Remarkable Mineral Endowment (Cross Section) 26

  27. Slide 27: Trap System: Second Major Discovery Made in 2024

    Trap System: Second Major Discovery Made in 2024 Trap Target Two rigs stepping out along strike to the SE. Porphyry unit overprinted by high-grade sheeted CBM veins. 1.4 kilometers of strike and open for further expansion. 27

  28. Slide 28: Plutus Target: Deep Drilling Planned

    Plutus Target: Deep Drilling Planned Plutus Porphyry Center South: Large coincidental copper & molybdenum in-soil anomaly lying above a magnetic high. Located approximately 1.5 km north of the Marmato mine. North: Breccia discovery (2023) • 136.45m @ 1.31 g/t AuEq Reconnaissance drill program on sou

  29. Slide 29: Guayabales Project: Targeting a Multi-Million Ounce Gold Camp

    Guayabales Project: Targeting a Multi-Million Ounce Gold Camp Our Exploration Strategy Target name Apollo, Trap Plutus North, ME X, Tower, Plutus South, Box, Victory Baco, Crono, The Knife Amagá 29

Collective Mining — Investor Presentation (September 2025) on 6ix