Slide 1: Tennant Creek Goldfields – Structure & Mineralisation
For personal use only ABN 31 116 420 378 Tennant Creek Goldfields – Structure & Mineralisation Technical Presentation Presentation 2016
Slide 2: Disclaimer - Forward Looking Information
Disclaimer - Forward Looking Information For personal use only Truscott Mining Corporation Limited has prepared this announcement based on information available to it. No representation or warranty, express or implied, is made as to the fairness, accuracy, completeness or correctness of the informat
Slide 3: Tennant Creek Goldfields Location – Northern Territory
Tennant Creek Goldfields Location – Northern Territory For personal use only Excellent Access and Low A Regional Centre with a Mining Infrastructure Costs Focus 500 km north of Alice Springs - main Stuart Highway to Darwin Rail - Alice Springs to Darwin line Mining support industries (drilling
Slide 4: Gold Projects Tenement Locations (100% Truscott)
Tennant Creek Gold Projects Tenement Locations(100% Truscott) For personal use only
Slide 5: Historical Underground Mining – Major Gold Deposits
Tennant Creek Goldfield Historical Underground Mining – Major Gold Deposits For personal use only Transitions in Mining Methods and Selectivity - Underground Mining - Gold Zones - Major Deposits Recording the change from shaft supported hand held methods (Nobles Nob) to decline supported mechanisati
Slide 6: Mineral Field Structural Elements & Location of Gold Occurrences
Tennant Creek Mineral Field Structural Elements & Location of Gold Occurrences For personal use only N R’ 153 White Devil R 103 10km Ơ1 128
Slide 7: Structural Controls & Mineralisation
Tennant Creek Goldfields Structural Controls & Mineralisation For personal use only Observations of recorded mineral occurrences across the goldfield demonstrate linear traces along which the mineralisation is distributed. The patterns that these lines support a structural evolution that has been dr
Slide 8: Structural Elements Minor Scale (1 Metre)
Westminster Structural Elements Minor Scale (1 Metre) For personal use only 3 3
Slide 9: Major Mines & Targets At Structural Element Intersections - TMI Image
Major Mines & Targets At Structural Element Intersections - TMI Image For personal use only Westminster Project Hera Project
Slide 10: Prospectivity Assessment
Tennant Creek Goldfields Prospectivity Assessment For personal use only Truscott’s exploration projects are located in the prospective part of the goldfield south of the principle strain axis sigma 1. Structural elements are evident in the gravity image (slide 9), and lineaments of late stage faulti
Slide 11: Westminster & Hera Project Settings
Tennant Creek Goldfield Westminster & Hera Project Settings For personal use only ______________5Km
Slide 12: Project Structural Controls and Gold Assays
Westminster Project Structural Controls For personal use only Gold Assays
Slide 13: Project Extension & Compression Zones
Westminster Project Extension & Compression Zones For personal use only At Westminster a zone of primary transcurrent shearing at 083 (D) degrees is crosscut by a set of late stage anti-synthetic shears on 153 (R’) degrees. A lineation along the direction of anti-synthetic shear provides an axis whi
Slide 14: Structural Controls - 1stVD Ground Gravity Image
Westminster Project Structural Controls - 1stVD Ground Gravity Image For personal use only Gold Assays Gold Assays
Slide 15: Structural Controls – Ore Body One, Zone One
Westminster Project Structural Controls – Ore Body One, Zone One For personal use only Zone 1 Gold Assays
Slide 16: Resource Extension Potential
Westminster Project Resource Extension Potential For personal use only The Extension and Compression zones formed as a consequence of the transcurrent shear action provides dilation traps for Iron rich fluids to precipitate. The geometry of the interaction between the 083 (D) shear direction and 103
Slide 17: Ore Body One – Zone One, Depth Extension Drilling
Westminster Project, Long Section Ore Body One – Zone One, Depth Extension Drilling For personal use only Gold Assays Gold Assays Ore Body 1, Zone 1, Planned depth extension drilling Ore body No 1 Depth Extension
Slide 18: Ore Body One Oblique Section - Across Ore Plunge – Zone One
Westminster Project – Ore Body One Oblique Section - Across Ore Plunge – Zone One For personal use only
Slide 19: Warrego Foot Print Model
Westminster Project - Warrego Foot Print Model Structural Controls – 1stVD Ground Gravity Image For personal use only Magnetic High
Slide 20: Comparative Ore Body Models
Tennant Creek Goldfield Comparative Ore Body Models For personal use only The ground based gravity images at Westminster provide indications of the local transcurrent shear corridor and modelled dilation domains. Surface mapping, sampling and drilling subsequently further references the location for
Slide 21: Hera Project – Gravity Image
Hera Project – Gravity Image Warrego and Westminster modelled footprints For personal use only Warrego Footprint Model Westminster Footprint, Model Magnetic High Surface Copper & Iron Ore Body 1 Laterite Hill 500m Projected central Axis
Slide 22: Paragenesis Model
Tennant Creek Goldfields Paragenesis Model For personal use only Structural Events Sedimentary Setting Mineralisation Sequence Sediments Folded East-West Warramunga Sediments deposited 1859ma Minor mineralisation along bedding planes Tennant deformation event begins Sediments sheared along 083 Iron
Slide 23: Directors and Executive Management - Truscott Mining Corporation Limited
Directors and Executive Management - Truscott Mining Corporation Limited For personal use only Peter N Smith (Executive Chairman & Managing Director) BSc (Min), PG Dip (M Tech), M Min Tech, FAusIMM, CP, International and Australian experience in mine management and mine development. Twenty years exp