Dreadnought Resources Limited · ASX:DRE

Dreadnought Resources — Shareholder Meeting (August 2019)

23 slides from Dreadnought Resources's shareholder meeting presentation, Aug 16, 2019

  1. Slide 1: World Class Ni-Cu-Au Opportunity

    World Class Ni-Cu-Au Opportunity DI S CO V E RI NG CA MP S CA L E NI CK E L , CO P P E R A ND G O L D S YS T E MS W I THI N W ES T ERN A US T RA L I A Ex traordinary General Meeting Presentation - Dean Tuck, Managing Director 1 6 AUG US T 2 0 1 9

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements ‘This release may include forward looking statements. These forward looking statements are based on management’s expectations and beliefs concerning future events as of the time of the release of this document. Forward looking statements are necessarily subject

  3. Slide 3: Corporate Summary

    Corporate Summary Capital Structure ASX Code DRE Shares on Issue 1,466M Directors and Officers 32% Share Price $0.004 Retail and Market Cap $5.9M HNW 65.5% Forecast Cash (30 June Qrtly.) $1.4M* Corporate and Total unlisted options 120.5M Institutions * Includes $915k received from capital raising (b

  4. Slide 4: Successful and Experienced Board

    Successful and Experienced Board Mr Paul Chapman, Non-Executive Chairman B.Comm, ACA, Grad. Dip. Tax, MAICD, MAusIMM Paul is a Chartered Accountant with over thirty years’ experience in the resources sector gained in Australia and the United States. Paul was a founding shareholder/director of the fo

  5. Slide 5: Overview

    Overview Dreadnought Resources (ASX:DRE) is focused on discovering camp scale nickel, copper and gold systems within Western Australia by exploring significant landholdings in prospective and underexplored provinces. Tarraji-Yampi Projects  Unexplored since 1978 with known outcropping mineralisatio

  6. Slide 6: Strategy

    Strategy DELIVER SIGNIFICANT EFFECTIVE AND EFFICIENT STRONG COMMUNITY AND SHAREHOLDER RETURNS EXPLORATION STAKEHOLDER ENGAGEMENT • Discover economic Nickel, Copper • Low over-head, textbook exploration • Licence to operate underpins our and Gold deposits in WA focused on discoveries success • Releas

  7. Slide 7: West Kimberley: Large Scale Ni-Cu-Au Opportunity

    West Kimberley: Large Scale Ni-Cu-Au Opportunity ASX:DRE WWW.DREADNOUGHTRESOURCES.COM 7

  8. Slide 8: Rare Exploration Opportunity

    Rare Exploration Opportunity • Outcropping mineralisation • Off limits since 1978 • Multiple untested drill targets • Tier 1 jurisdiction – Western Australia 1956-1959: Last 1978-2013: YSTA significant mineral Defense Reserve exploration at Tarraji “off limits” to undertaken by WMC mineral explorati

  9. Slide 9: Tarraji-Yampi Project

    Tarraji-Yampi Project Volcanic Massive Sulphides (VMS): • e.g. Golden Grove, DeGrussa, • Hosted within the Marboo formation • Tend to occur as clusters of high grade polymetallic Cu-Zn-Pb-Ag deposits • Chianti – Priority VMS Target Magmatic Nickel Sulphide (Ni$): • e.g. Nova, Nebo Babel, Savannah

  10. Slide 10: Chianti – Priority VMS Drill Target

    Chianti – Priority VMS Drill Target Untested FLEM conductors sitting beneath outcropping mineralized gossans and ACM’s 1972 shallow drilling. ASX:DRE WWW.DREADNOUGHTRESOURCES.COM 10

  11. Slide 11: Texas – Priority Ni-Cu-PGE Drill Target

    Texas – Priority Ni-Cu-PGE Drill Target Coincident shallow FLEM conductor and intense magnetic anomaly sitting within outcropping Ruins Dolerite. ASX:DRE WWW.DREADNOUGHTRESOURCES.COM 11

  12. Slide 12: Grants – Priority Cu-Au Drill Target

    Grants – Priority Cu-Au Drill Target Multiple outcropping Cu lodes, confirmed at depth by 1950s WMC drilling but was never assayed for gold. ASX:DRE WWW.DREADNOUGHTRESOURCES.COM 12

  13. Slide 13: Tarraji-Yampi: Large Scale Ni-Cu-Au Opportunity

    Tarraji-Yampi: Large Scale Ni-Cu-Au Opportunity Wombarella Project  Outcropping Wombarella mafic-ultramafic intrusion • Prospective for magmatic Ni-Cu-PGE mineralisation  Extensive Whitewater Volcanics • Outcropping remobilised Ba-Pb-Zn-Ag mineralisation • Prospective for Cu-Zn-Pb-Ag VMS mineralis

  14. Slide 14: Illaara Project – Classic Yilgarn Gold

    Illaara Project – Classic Yilgarn Gold Illaara will compliment the highly perspective Tarraji- Yampi Project in the West Kimberley and provide for year round news flow.  Consolidated ~725sq km tenement package covering over 75km strike of greenstone belt, underexplored for gold  Held by iron-ore e

  15. Slide 15: Year Round Access and News Flow

    Year Round Access and News Flow Established and well maintained infrastructure provides year round access to this highly prospective project in the Yilgarn Craton gold province  Project located ~160km NW of Kalgoorlie.  Easy project access from Kalgoorlie and Menzies  Extensive existing station a

  16. Slide 16: Illaara Project Targets

    Illaara Project Targets Illaara Central • Extensive “orogenic gold” anomaly defined by Newmont proprietary surface geochemistry • Newmont concept – Felsic Intrusive hosted Au (e.g. Wallaby / Jupiter) • Shallow cover has resulted in no previous exploration Northern Extension of Metzke’s Find • Associ

  17. Slide 17: Illaara Central – Priority Gold Target

    Illaara Central – Priority Gold Target  Illaara Greenstone Belt extends north-south trending strike length: • Neoarchean to Mesoarchean aged greenstone belt comprised of significant quartzite and quartz-rich metasedimentary sequences • Metamorphic grade of the greenstone belt is of greenschist faci

  18. Slide 18: Priority Target: Illaara Central

    Priority Target: Illaara Central Major 10km long orogenic gold anomaly: • Strong pathfinder anomalism • Over interpreted intrusion (e.g. Wallaby / Jupiter) • At major structural intersection Heritage survey completed 33kms of drill lines already cleared Remainder of 2019 Strategy to deliver: • D

  19. Slide 19: Rocky Dam Au and VMS Project

    Rocky Dam Au and VMS Project Located 30kms east of Kalgoorlie-Boulder Existing gold anomalies and mineralised structures along strike from Queen Lapage (RGL) and Slate Dam (AAJ) Known VMS occurrences within the highly prospective Gindalbie Domain • Teutonic Bore Neighbors actively exploring alon

  20. Slide 20: Rocky Dam Au and VMS Project

    Rocky Dam Au and VMS Project Currently contains two prospective targets, review of historical work ongoing. Mineralised Gap Fault CRA Prospect defined in the 1990s, sitting on same structures as AAJs Slate Dam CRA Prospect QLAC0050 (RGL) 12-16m: 4m @ 1.5 g/t Au Over 700m in strike of anomalous sh

  21. Slide 21: Recent and Planned Activities 2019

    Recent and Planned Activities 2019 Milestone Status Reconnaissance trip and surface sampling Complete Ground FLEM survey to refine drill targets Complete Surface sampling assay results Complete Acquisition of Illaara Greenstone Belt Complete Capital Restructure – Placement, SPP, Con Notes and UMP Co

  22. Slide 22: Summary

    Summary Illaara: Tarraji-Yampi: Rocky Dam:  Consolidated ~725 sq km tenement  First mover over multiple outcropping  Located 30kms from Kalgoorlie in the package covering over 75km strike of mineralisation systems which have world class Eastern Goldfields greenstone belt and underexplored for bee

  23. Slide 23: World Class Ni-Cu-Au Opportunity

    World Class Ni-Cu-Au Opportunity DISCOVERING CAMP SCALE NICKEL, COPPER AND GOLD SYSTEMS W ITHIN W ESTERN AUSTRALIA ASX:DRE

Dreadnought Resources — Shareholder Meeting (August 2019) on 6ix