    Forward Looking Information & Cautionary Statements Certain statements and information contained in this presentation constitute “forward-looking statements” within the meaning of applicable U.S. securities laws and “forward-looking information” within the meaning of applicable Canadian securities l

  3. Slide 3: Non-IFRS Measures

    Non-IFRS Measures Non-IFRS Performance Measures  The Company has included certain non-IFRS performance measures in this presentation. These non-IFRS performance measures do not have any standardized meaning and therefore may not be comparable to similar measures presented by other issuers. Accordin

  4. Slide 4: Corporate Snapshot

    Corporate Snapshot Analyst Price Targets1 C$3.00 C$5.90 C$2.00 C$4.50 C$5.00 US$2.80 Scotia Hannam Partners BMO Beacon Securities Cormark HC Wainwright Basic Shares Outstanding2 Ticker: GAU Ownership3 Ownership Breakdown Gold Fields Ltd 19.58% 257M NYSE American & TSX Equinox Partners LLP 11.25% 11%

  5. Slide 5: Maintaining Strong Cash Balance – No Debt

    Maintaining Strong Cash Balance – No Debt 140 120 100 US Millions ($M) 80 60 123 121 106 106 40 20 0 Q2 2024* Q3 2024* Q4 2024** Q1 2025* *unaudited 5 ** audited

  6. Slide 6: Building a Leading Gold Producer in Ghana

    Building a Leading Gold Producer in Ghana No 1 gold producer Stable democracy in Africa Mature mining Secure jurisdiction regulations Large presence of major Access to skilled mining companies employee base 6

  7. Slide 7: Asanko Gold Mine ("AGM") at a Glance

    Asanko Gold Mine (“AGM”) at a Glance 2025 Expected Production Expected 2025 AISC1 Re-sequenced mine plan 130-150koz Au $1,750 – $1,950/oz delivered early Q1 25 Increasing Gold Production3 Decreasing AISC1 +82% over LOM avg <$1,300/oz over LOM avg Mineral Reserves2 M&I Mineral Resources2 2.03 Moz Au

  8. Slide 8: Q1 Highlights

    Q1 Highlights Health & Safety  Two lost-time injuries (“LTIs”) and three total recordable injuries (“TRIs”)  12-month LTI and TRI frequency rates of 0.43 and 1.00 per million hours worked. Production  Sold 26,994oz Au at an avg realized price of $2,833/oz Cost and capital expenditures  Total cas

  9. Slide 9: Gold Production and AISC Guidance

    Guidance & 5 Year Outlook • AISC • Gold Production Gold Production and AISC1 300 $2,500 230-260 oz 250 210-240 oz $2,000 190-220 oz 1,750-1,950/oz 180-210 oz LOM Avg Au Production (koz) 200 210 koz/year AISC ($/oz Au) 1,400-1,700/oz $1,500 130-150 oz 1,300-1,600/oz 1,200-1,500/oz 1,100-1,400/oz 150

  10. Slide 10: Upcoming Value Drivers

    Upcoming Value Drivers 2024 Actual Production 1,2 (koz Gold) 400 350 82% increase in 300 production 250 200 150 100 50 0 Allied Gold Resolute Aris West African Galiano LOM Asante Orla K92 Mining Orezone Galiano Actual Thor Caledonia Avg. Organic Growth – 82% increase Au Secondary Crusher Advancing N

  11. Slide 11: Q2 2025 Exploration Update

    ~$10M Q2 2025 Exploration Update 2025 Exploration Budget Abore Infill  Phase 2 infill drilling program expanded to 8,900m and is currently underway  Program designed to test for further extensions of mineralization beginning immediately below the MRMR following excellent Phase 1 results  Phase 1

  12. Slide 12: Abore Phase 2 Infill Targets

    Abore Phase 2 infill Targets New High Grade Discovery South High Grade Zone Potential Ore shoot Trends Priority Drill Targets 2025 Drill Hole Traces Abore Long Section Multiple Ore Shoot Targets 12

  13. Slide 13: Abore Update

    Abore Update Plan map showing 2025 Abore Phase 1 Infill holes and significant intercepts 13

  14. Slide 14: Abore Drilling

    Abore Drilling Cross section looking north showing high grade intercepts in conversion holes ABPC25- Cross section of new zone discovery hole ABPC25-346 shown against current block 316 and ABPC25-328, which have expanded northern extent of Abore South pit high model looking north grade zone 14

  15. Slide 15: Abore – Q2 deep drilling results

    Abore – Q2 deep drilling results  Cross Section A-A1 showing hole ABPC25-356  Completed Abore step-out drilling program:  Consisted of 4 holes totaling 1,907m  Designed to test for continuity of mineralization below current MRMR  Confirmed granite and mineralizing system continues 200m below cu

  16. Slide 16: Abore Update

    Abore Update Plan map of Abore Deeps drilling showing Q2 2025 holes and significant intercepts 16

  17. Slide 17: Abore: Significant Grades and Widths at Depth

    Abore: Significant Grades and Widths at Depth  Wide intercepts of host granite such as that shown here in ABDD25-350 demonstrate the upside growth potential at depth at Abore  This hole is located under Abore main pit and carries high grades that could support a potential underground bulk mining o

  18. Slide 18: Building on Strong Fundamentals

    Building on Strong Fundamentals Unique High-Growth Gold Producer Largest single asset gold producer in Ghana Robust 5-Year Strong Cash Outlook Balance +$106M1 As production ramps up No Debt & AISC decreases Highly Prospective Land Strongly Positioned for Package Re-Rate On underexplored gold belt an

  19. Slide 19: Contact

    Contact N. American Toll-Free: 1-855-246-7341 Email: info@galianogold.com © Copyright 2025 Galiano Gold. All rights reserved.

  20. Slide 20: Appendix

    Appendix © Copyright 2025 Galiano Gold. All rights reserved. 20

  21. Slide 21: Updated Mineral Reserve Estimate, as of December 31, 2024

    Updated Mineral Reserve Estimate, as of December 31, 2024 Proven Probable Total Proven and Probable Deposit Tonnes Au Grade Au Content Tonnes Au Grade Au Content Tonnes Au Grade Au Content (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) Nkran 10.6 1.67 571 10.6 1.67 571 Esaase 13.6 1.22 533 13.6

  22. Slide 22: Updated Mineral Resource Estimate, as of December 31, 2024

    Updated Mineral Resource Estimate, as of December 31, 2024 Measured Indicated Measured + Indicated Inferred Deposit Tonnes Grade Au Contained Tonnes Grade Au Contained Tonnes Grade Au Contained Tonnes Grade Au Contained (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) (Mt) (g/t) (koz) Nkran 16.3 1

  23. Slide 23: Tax

    Tax Ghana corporate tax regime Corporate income tax Withholding taxes  Rate 35% for mining (general rate 25%)  Charged on purchases from foreign suppliers; rates  Capital expenditure amortized over 5 years depend on country of domicile, and type of service, but typically range from 10% to 20%  O

  24. Slide 24: Building a Responsible Business

    Building a Responsible Business ENVIRONMENT GOVERNANCE Limiting environmental impact to Maintaining sound corporate our concessions governance and ethical business practices BEST PRACTICES SOCIAL Implement best practices in Engaging with local communities sustainability to create self-sustaining leg