Kefi Gold And Copper Plc · LSE:KEFI

Kefi Gold And Copper — Gold and Minerals — Future Minerals Forum 2022

18 slides from Kefi Gold And Copper's conference presentation, January 2022

  1. Slide 1: Gold and Minerals LLC – Company Introduction and Projects Overview

    Gold and Minerals LLC Company Introduction and Projects Overview January 2022

  2. Slide 2: Disclaimer

    Disclaimer • The information contained in this document (“Presentation”) has been prepared by Gold and Minerals LLC (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advi

  3. Slide 3: Gold and Minerals – Our Mission

    Gold and Minerals Our Mission To discover gold and base metals projects in the Kingdom of Saudi Arabia and to develop and operate these projects in a safe and environmentally responsible manner for the benefit of our shareholders and local communities. Explore and Discover Develop and Build Operate

  4. Slide 4: Corporate structure of G&M

    Corporate structure of G&M 31.2% 68.8% Other Regional Jibal Qutman Gold Hawiah VMS Exploration Projects Project Project

  5. Slide 5: Jeddah 320Km / Taif 100Km

    Jeddah- 320Km Nw . Taif — 100Km

  6. Slide 6: Hawiah Project

    • A major greenfield Hawiah Project discovery made in September 2019. • A three (3) year 42,000m drilling program has so far delineated a total mineral resource of 24.9 Mt (0.9% copper, 0.85% zinc, 0.62 g/t gold and 9.81 g/t silver) • Hawiah, is on track to be brought into production in 2025 and ran

  7. Slide 7: Hawiah Licence Area – Exploration History

    Hawiah Licence Area – Exploration History 2014 2015 2016 2017 2018 2019 2020 2021 2022 PFS planned for Phase 3 Completion Drilling Phase 2 (Sept 2022) Completed Drilling Exploration (March Completed restarted 2021). Licence (May 2020) (Jan 2019) Phase 4 Renewed Maiden (October IP Survey Drilling Res

  8. Slide 8: Hawiah ore body, structure and mineralisation

    Hawiah ore body, structure and mineralisation Oxide – gold enrichment – copper depletion Transition – copper enrichment Fresh sulphide – copper, zinc, gold and silver

  9. Slide 9: Hawiah Project – Resource statement and classification

    Hawiah Project – Resource statement and classification Mineral Resource Grade Metal Content Mining Type Tonnes (Mt) Classification Category Cu (%) Zn (%) Au (g/t) Ag (g/t) Cu (kt) Zn (kt) Au (koz) Ag (koz) Sub-Total Indicated Open-Pit 7.0 1.03 0.78 0.66 10.03 72 55 149 2,271 Underground 3.9 0.83 1.0

  10. Slide 10: Hawiah Project – Robust Resource at an NSR$54/t cut-off

    Hawiah Project – Robust Resource at an NSR$54/t cut-off - Planning scenario based on a 2 Mtpa open pit and underground mining operation. - Processing will use conventional floatation and SART processing for copper & zinc and Deposit Avg Merrill Crowe for precious metals . NSR: $107 - PFS scheduled f

  11. Slide 11: Near mine - Al Godeyer Prospects

    Near mine - Al Godeyer Prospects • Al Godeyer and Al Godeyer East licences granted in November 2021 on an initial 5-year term • Situated adjacent to the Company’s significant Hawiah discovery within easy trucking distance • Exploration works already commenced

  12. Slide 12: Near mine - Al Godeyer Prospects

    Near mine - Al Godeyer Prospects • Exploration mapping suggests a strike length of more than 2km for the identified gossan horizon. • Grab samples show attractive gold and copper grades (up to 7.2 g/t gold and 3.3% copper). • SP geophysics and trenching to start in January 2022 • Accelerated explora

  13. Slide 13: The Jibal Qutman Project in the Nabitah Belt – ASIR Province

    The Jibal Qutman Project in the Nabitah Belt – ASIR Province

  14. Slide 14: Jibal Qutman (JQ) Project

    Jibal Qutman (JQ) Project • The Jibal Qutman Project is located in the central southern region of the Arabian Shield and covers an area of 99km2. • The EL and MLA covers an important part of the prospective Nabitah-Tathlith Fault Zone, a 300km-long structure with over 40 gold occurrences and ancient

  15. Slide 15: JQ - Resource modelling

    JQ - Resource modelling • Current resource of 28 Mt containing 733k gold oz (grade 0.8g/t). Based on this G&M submitted a mining licence application in 2016. • Jibal Qutman comprises of 102 individually modeled lodes • Resource is extractable West one Main one across seven open pits targeting the ox

  16. Slide 16: JQ - Scoping and Mine Planning

    JQ - Scoping and Mine Planning - G&M is working with the DMMR on efforts to secure the ML - Heap leach operation targeting the oxide resources with the potential for the use of a gravity circuit - 2016 resource estimate and financial assessment conducted with a $1,165oz gold price yielding a NPV of

  17. Slide 17: Jibal Qutman Project

    Sold ~minerals Jibal Qutman Project

  18. Slide 18: Questions?

    Questions?

Gold and Minerals — Future Minerals Forum 2022 on 6ix