ABx Group Limited · ASX:ABX

ABx — Investor Presentation (January 2024)

33 slides from ABx's investor presentation, Jan 31, 2024

  1. Slide 1: Delivering Materials for a Cleaner Future

    (ASX:ABX) Delivering Materials for a Cleaner Future 31 January 2024 Page 1

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by ABx Group Limited ACN 139 494 885 (“ABx” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those secu

  3. Slide 3: Delivering materials for a cleaner future

    Delivering materials for a cleaner future • Creation of an ionic adsorption clay rare earth Exploration Development Technology project in northern Tasmania • Establishment of a plant to produce hydrogen fluoride and aluminium fluoride from recycled industrial waste, to replace imports (ALCORE) Legac

  4. Slide 4: Board of Directors

    Board of Directors Hon Paul Lennon AO (Chair) Dr Mark Cooksey (Managing Director and CEO) • Premier of Tasmania 2004-2008 • More than 20 years with Rio Tinto and CSIRO • Deputy Premier and Minister for • Worked closely with aluminium and other metal Infrastructure, Energy & Resources 1998-2004 indus

  5. Slide 5: Corporate Overview

    Corporate Overview ASX code: ABX Average daily Market cap Cash @ 26 Jan Listed Issued shares Options 52-week range volume (3 Shareholders (@$0.07) 2024 months) 24 Dec 2009 $0.07- 250.0m 11.0m 140,000 $17m $6.0m 2,488 @ $0.20 $0.16 Major Shareholders Shares % $0.24 12 Peter Palan and Clare Palan 9.2

  6. Slide 6: ESG

    ESG • ABx Group has commenced disclosing environmental, social, and governance (ESG) metrics, using the internationally accepted Stakeholder Capitalism Metrics developed by the World Economic Forum • ABx Group has subscribed to Socialsuite’s reporting platform to assist with monitoring and disclosin

  7. Slide 7: Segments

    Segments Rare earth discoveries in northern Tasmania ALCORE Aluminium fluoride production technology Bauxite operations in Queensland and Tasmania ASX: ABX Page 7 7

  8. Slide 8: Rare earth elements (REE) market

    Rare earth elements (REE) market • 15+ rare earth elements (REEs) used in wide variety of applications, with demand growing rapidly • China dominates rare earths markets • Prices of different rare earths vary significantly because: • Proportions of supply do not match proportions of demand • Rare ea

  9. Slide 9: Permanent magnet rare earths (PREE)

    Permanent magnet rare earths (PREE) • Essential for electric vehicles and wind turbines Super • Represent over 90% of value of rare earths consumption Magnets • Forecast to grow at 7% per year to 2040 %market %market volume value 9% Nd Pr e.g. catalysts, glass Neodymium Praseodymium polishing, metal

  10. Slide 10: Character of a clay-hosted rare earth deposit

    Character of a clay-hosted rare earth deposit • Exist on a spectrum from 'REE mineral'-clay mixtures to REE-ions adsorbed on/in clays • Higher contained value than most hard rock deposits due to high (relative) heavy rare earth content Terbium + Y�rium Other Dysprosium HREO Other HREO (0.3%) Other L

  11. Slide 11: Requirements for an ionic clay rare earth project

    Requirements for an ionic clay rare earth project Feature Aspects Mineral Resource Size, grade, strip ratio, radionuclides Process Reagent consumption, yield, product quality Infrastructure Transport, energy, water Regulatory approval, community support, government Jurisdiction support, supply chain

  12. Slide 12: ABx rare earth discoveries in Tasmania

    ABx rare earth discoveries in Tasmania ABx tenements p EL7/2010 Launceston EL9/2010 EL18/2014 ABx is the first company to discover rare Hobart EL10/2021 earths in Tasmania EL25/2022 EL27/2022 EL28/2022 Applica�on Wind Break Launceston Infrastructure Airport Deep Leads Railway Rubble • Four discoveri

  13. Slide 13: Rare Earths Resource Estimate

    Rare Earths Resource Estimate • Most recent upgrade to 52 Mt announced late 20231 • Over 10-fold increase in 12 months Explora�on pending Leech Scrub Licences ABx Tennaments Resource Block Model Size Cut-off (ppm Mean TREO Mean TREO- DyTb3 Boundary < 1,820 TREO (ppm x m) 1,820 - 3,610 TREO-CeO2) (pp

  14. Slide 14: Extraction: not all clays are created equal

    Extraction: not all clays are created equal pH is king • Deposits A and B are hypothetical (same grade) • Processing cost increases significantly as pH decreases Permanent magnet REO = Pr6O11 + Nd2O3 + Tb4O7 + Dy2O3 Source: ABX ASX Announcement, 2 February 2023 ASX: ABX 14

  15. Slide 15: Not all clays are created equal: pH is king

    Not all clays are created equal pH is king $60 More acid $50 Reagent Cost and Product Price (US$/kg REO) • Charts shows indicative reagent cost and product prices, based $40 on published data $30 • As pH decreases, reagent cost alone can be higher than product $20 price $10 Reagent cost • Position o

  16. Slide 16: Not all clays are created equal: desorbable grade

    Not all clays are created equal ‘Desorbable grade’ varies enormously Deep Leads has the highest ‘desorbable grade’ (REE extractable at pH 4) Permanent magnet REO = Pr6O11 + Nd2O3 + Tb4O7 + Dy2O3 ASX: ABX 16

  17. Slide 17: Infrastructure

    Infrastructure Transport Launceston • <20 km to major highway Hobart • <100 km to deepwater Bell Bay New port Wind Break Deep Leads Launceston Labour Rubble Mound Portrush 100 km2 target • <50 km to Launceston (pop 65,000) Westbury New Water • High availability in Tasmania Energy New • Close to majo

  18. Slide 18: Jurisdiction

    Jurisdiction Deloraine Australia • NATO partner • Major mining jurisdiction Tasmania • Extensive mining history: tin, copper, zinc, lead, gold • Supportive regulatory environment Deloraine region • Mostly commercial forest plantations ASX: ABX 18

  19. Slide 19: Resources

    Ian Levy (geology) Resources • 30 years of senior management and geological experience People • with multiple commodities, including at WMC Previously CEO of Allegiance Mining and Director of Gloucester Coal • Member of JORC for 11 years (4 years as Vice Chairman) • High calibre geologists and engin

  20. Slide 20: Requirements for an ionic clay rare earth project: ABx strengths

    Requirements for an ionic clay rare earth project ABx strengths Feature ABx • 52 Mt with good prospects for growth Mineral Resource • 800 ppm TREO with high proportion of DyTb • Low strip ratio Process • pH4: low cost • Close to all major infrastructure, with good access to Infrastructure water Juri

  21. Slide 21: ABx rare earths strategy

    ABx rare earths strategy Strategy Launceston • Rapidly develop low-cost production of mixed rare earth carbonate Hobart New • We operate only where welcomed Wind Break Deep Leads Launceston Plan Rubble Mound Portrush • Further investigations of metallurgical 100 km2 target processing steps and condi

  22. Slide 22: Segments

    Segments Rare earth discoveries in northern Tasmania ALCORE Aluminium fluoride production technology Bauxite operations in Queensland and Tasmania ASX: ABX Page 22 22

  23. Slide 23: Fluorine value chain

    Fluorine value chain Hydrogen Aluminium Fluorite Fluorspar fluoride fluoride Steelmaking Electronic manufacture Aluminium production Graphite purification Fluorochemicals Material Australian production (t) Fluorite 0 Fluorspar 0 • Fluorine recently added to Australia’s Hydrogen fluoride 0 Critical M

  24. Slide 24: Aluminium fluoride from aluminium smelter waste

    Aluminium fluoride from aluminium smelter waste Aluminium fluoride (AlF3): essential for aluminium smelting • 1.2 million tonnes produced globally per year worth US$1.5 • Traditionally produced billion (US$1,000-1,800 per tonne) from high-cost fluorspar • 50% produced in China, mainly for Chinese sm

  25. Slide 25: Process to produce aluminium fluoride

    Process to produce aluminium fluoride • Exemplary illustration of circular economy • ABx’s 83%-owned refining technology subsidiary • Developing processes to produce aluminium fluoride using1: • Fluorine from tapped bath (an aluminium smelter waste) • Aluminium from dross (an aluminium smelter waste

  26. Slide 26: Process economics

    Process economics • Based on long term aluminium fluoride prices and exchange rates, and estimated costs • For 20,000 t/y aluminium fluoride (80% of Australian demand) • Attractive margins under all scenarios Estimated Estimated Estimated AlF3 price FX rate AlF3 price operating operating Aluminium s

  27. Slide 27: Technical progress

    Technical progress • Critical processing steps have been demonstrated in laboratory1 • Bath pilot batch reactor commissioned2, with positive early results3 • For continuous pilot plant, technical requirements for oleum production module and bath reactor module finalised with two international suppli

  28. Slide 28: Process scale-up

    Process scale-up • Rigorous scale-up to reduce technical risk • First aluminium fluoride plant planned for Bell Bay, Tasmania, near existing hydro-powered aluminium smelter. Planned production 20,000 t/y • High potential for plants in other major aluminium smelting regions • Potential expansion into

  29. Slide 29: Technical plan

    Technical plan Reactor Purpose Status • Confirm preferred reactor design • Demonstrate that can achieve high Commissioned Bath pilot fluorine yield from bath Oct 2023 batch reactor • Produce metal sulfate residue suitable for further process Positive results development • Demonstrate quality of hydr

  30. Slide 30: Segments

    Segments Rare earth discoveries in northern Tasmania ALCORE Aluminium fluoride production technology Bauxite operations in Queensland and Tasmania ASX: ABX Page 30 30

  31. Slide 31: ABx bauxite operations

    ABx bauxite operations Sunrise Bauxite project Queensland • 50:50 joint venture with Alumin Pty Ltd, an Australian special purpose vehicle company associated with our strategic marketing partner, Rawmin India1. ABx is operator • Mining lease application on the Binjour deposit (37 million tonnes reso

  32. Slide 32: ABx bauxite operations

    ABx bauxite operations Northern Tasmania • Five-year cement-grade bauxite  Environmental Effects Report for supply agreement signed with DL130 reviewed Adelaide Brighton Cement Limited1 by EPA1 Burnie Port Devonport Bell Bay Port • Mining planned to commence in Q3 20242 Portside Northern Tasmanian

  33. Slide 33: ABx Group Limited

    ABx Group Limited Level 4, 100 Albert Rd South Melbourne VIC 3205 Australia Phone: +61 3 9692 7222 E: corporate@abxgroup.com.au Mark Cooksey Managing Director and CEO E: mcooksey@abxgroup.com.au

ABx Group — Investor Presentation (January 2024) on 6ix