  1. Slide 1: Gearing Up to Build Canada's Next Major Gold Mine

    MARCH 2026 GEARING UP TO BUILD CANADA’S NEXT MAJOR GOLD MINE INVESTOR PRESENTATION ODV NYSE TSXV | osiskodev.com

  2. Slide 2: Cautionary Statements

    CAUTIONARY STATEMENTS CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION Project; the ability of the Company to discover additional deposits within the Cariboo Gold Project area; the ability of the Company to complete its exploration and development objectives for its projects in the timing

  3. Slide 3: Cautionary Statements

    CAUTIONARY STATEMENTS CAUTIONARY NOTE TO U.S. INVESTORS relevant and reliable as an indication of the potential of the Burgin Mine. Further exploration work including drilling will be required to upgrade the historic resource to current. Osisko Development cautions sufficient work has not been done

  4. Slide 4: Investment Highlights

    INVESTMENT HIGHLIGHTS Building Toward Becoming a Premier Canadian Mid-tier Gold Mining Company ADVANCING SHOVEL READY CARIBOO GOLD PROJECT IN CANADA Limited universe of permitted development stage gold assets of scale in Tier 1 jurisdictions1 FOCUS ON SCALABLE ASSETS WITH DISTRICT POTENTIAL Multi-mi

  5. Slide 5: Mining Friendly Jurisdictions

    MINING FRIENDLY JURISDICTIONS Brownfield properties with existing accessible infrastructure and prospective exploration upside BC, Canada Utah, USA CARIBOO GOLD PROJECT 100% ownership TINTIC PROJECT 100% ownership EA Certificate (granted Q4 23) Trixie MRE (completed Mar 24) Permits (granted Q4 24) S

  6. Slide 6: Executing on Vision & Strategy: Scale Matters

    EXECUTING ON VISION & STRATEGY SCALE MATTERS… Junior and Intermediate Market Cap per 100kozpa (C$Bn) Gold Producers Target $25B CAD$ $26B Zone 2 Billion 3.0x $5.9 log scale 2.3x $4.6 $11B Target Zone 1 $8.9B $2.0 $10B $5.2B Market Capitalization1 $5B WDO AGI GMIN $3.7B Scarcity of Permitted Assets $

  7. Slide 7: Financing Cariboo: Key De-risking Milestones

    KEY FINANCING DE-RISKING MILESTONES August 2025 Equity Financing1 US$450 million Project Financing2 Gross Proceeds Initial Draw Subsequent Draw US$203 million US$100 million US$350 million FINANCING CARIBOO  Closing: August 15, 2025  Conditions: Unconditional, fully drawn  Covenants: Credit agree

  8. Slide 8: Capital Structure Snapshot

    CAPITAL STRUCTURE SNAPSHOT Osisko Development Corp.1,2 Shareholder Ownership Current Share Price (closing price on March 13, 2026) C$5.10 /share OR Royalties Institutional Investors Basic Shares Outstanding 304.6 million 51% 11% Insiders & Management Options, DSUs, and RSUs 8.0 million (~2% fully-di

  9. Slide 9: Cariboo Gold Project

    Video camera outline Watch Video CARIBOO GOLD PROJECT British Columbia, Canada 100% Ownership Double Tap Gesture with solid fill ODV NYSE TSXV 9 Virtual Tour osiskodev.com

  10. Slide 10: Cariboo Gold Project: Asset Snapshot

    CARIBOO GOLD PROJECT: ASSET SNAPSHOT Developing a mining camp in the under-explored Cariboo gold belt LOCATION / OWNERSHIP MINE TYPE METALS STAGE LAND PACKAGE Mosquito Wells 100% ODV BC, Canada Underground Gold Permits (Nov-24) >185,000 ha FS (Apr-25) Shaft Island Valley Barkerville Mountain NE Cow

  11. Slide 11: 2025 Optimized Feasibility Study Highlights

    2025 OPTIMIZED FEASIBILITY STUDY HIGHLIGHTS All $ figures in CAD, unless otherwise noted (USDCAD 1.35 base case) 190 KOZ / YEAR LOM AVG 10 YEAR MINE LIFE 24 MONTH MINE BUILD 202 koz/yr in the first 5 years Based on current reserves only 2028 anticipated gold production US $1,157/OZ AISC 1 $881M INIT

  12. Slide 12: Infill Drilling and Underground Development

    INFILL DRILLING AND UNDERGROUND DEVELOPMENT 13,000-metre infill drill program underway in the Lowhee Zone expected to be completed by Q2 2026 Plan View Infill Drilling Cariboo Reserves1 Fans 2.071 Moz Ramp Progress (~2.1 km completed) Reserve (17.8 Mt at 3.62 g/t Au) Stopes Mosquito Valley Resource

  13. Slide 13: Lowhee Underground

    LOWHEE UNDERGROUND ODV NYSE TSXV 13 osiskodev.com

  14. Slide 14: Site Pre-Construction Activities

    SITE PRE-CONSTRUCTION ACTIVITIES >250 personnel at Cariboo Gold site advancing pre-construction activities Waste rock storage facility excavation Water treatment plant building Commissioning underway Sediment control pond spillway concrete work & dam raise Ballarat camp expansion to 266 rooms comple

  15. Slide 15: Project Location & Regional Infrastructure

    PROJECT LOCATION & REGIONAL INFRASTRUCTURE Insights  Large land package: total mineral tenure >185,000 hectares  Brownfield site with year-round access, infrastructure and work force  Grid power: allocated 22 MW from BC Hydro power at 6.7¢ per kWh — 69kV 70km transmission line to be constructed 

  16. Slide 16: Cariboo Gold Permitting Successfully Completed

    CARIBOO GOLD PERMITTING SUCCESSFULLY COMPLETED BC Mines Act permits granted on Nov 20, 2024 — main permits for project construction & operation 2020 2021 2022 2023 2024 H1 H2 H1 H2 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 ENVIRONMENTAL ASSESSMENT Early Engagement Detailed Project Description Submission o

  17. Slide 17: 2025 Feasibility Production Profile

    2025 FEASIBILITY PRODUCTION PROFILE Production profile based on current 2.07 Moz of Probable Reserves1 only Gold Production & Head Grade 190 KOZ/YR 202 KOZ/YR Gold Payable Production (koz) Head Grade (g/t Au) LOM average2 First 5 years average2 Significant upside potential from resource conversion a

  18. Slide 18: Target to Be Among the Top Canadian Mines

    TARGET TO BE AMONG THE TOP CANADIAN MINES Annual Expected Gold Production TARGET 672 (koz Au) PRODUCTION 656 Cariboo is a scalable asset RANGE Underground Based on 2025 FS projections, Cariboo is expected Open pit to be among the top underground gold assets in Canada, with significant upside potenti

  19. Slide 19: Global Gold Cost Curve Positioning

    GLOBAL GOLD COST CURVE POSITIONING 2024 Global Total Cash Cost Curve (US$/oz) $3,500 $3,000 $2,500 Cariboo is $2,000 Cariboo Cariboo $947/oz ($947) Timmins ($1,700) positioned in the $1,500 LaRonde ($945) Porcupine ($1,097) Musselwhite ($1,045) Eleonore ($1,339) lower half of the Macassa ($748) $1,0

  20. Slide 20: Capital Cost Breakdown

    CAPITAL COST BREAKDOWN Capital costs ($ million) Initial Sustaining Total LOM Insights Underground mine 313 397 710  ~US$652 million upfront capex1 Water & waste management 98 24 123  Process plant and related infrastructure designed to accommodate potential future Power & electrical 19 — 19 throu

  21. Slide 21: Robust Project Economics

    ROBUST PROJECT ECONOMICS Illustrative Scenario Base Case Spot Gold Prices after-tax, C$ US$2,400 Gold | 1.35 FX US$4,500 Gold | 1.35 FX2 Net Present Value (NPV5%) $943 mm $3,249 mm Internal Rate of Return (IRR) 22.1% 51.9% Payback, from commercial prod. 2.8 yrs 1.1 yrs Avg. Annual FCF1 (LOM) $158 mm

  22. Slide 22: Mine Design Summary

    MINE DESIGN SUMMARY Insights  Access via two ramps from Cow and Valley Portals  >1.2 km of access into Lowhee zone already completed as part of ongoing bulk sample program  Maximum vertical depth ~650 meters  Mining split into 3 distinct areas: Cariboo North, South, and Deep  Bulk tonnage long-

  23. Slide 23: Proposed Conceptual Mine Site Layout

    PROPOSED CONCEPTUAL MINE SITE LAYOUT Insights  Single processing facility at the Mine Site Complex  Primary & secondary crushing underground and conveyed to the surface ore sorter  Gravity and flotation processing circuits produce two gold concentrates  Comminution circuit already purchased  Pr

  24. Slide 24: Mineralization Favorable to Ore Sorting

    MINERALIZATION FAVORABLE TO ORE SORTING Ore sorting removes marginal material and generates an NPAG waste product at a low opex of C$1-2 per tonne Insights Pyrite hosted in quartz veins High Density  481 vein corridors with 2-meter minimum width Material (~5 g/cm3)  Gold uniquely pyrite hosted wit

  25. Slide 25: Processing Flowsheet

    PROCESSING FLOWSHEET Gravity circuit to Totals may not add up due to rounding recover 46% of gold Crush/screen  Sort  Grind  2025 FS Addition Gravity / Flotation  Dore (gravity) & Flotation Concentrate LOM recovery 92.6% Source: Refer to the Cariboo Technical Report for the assumptions, qualific

  26. Slide 26: Key Processing Elements

    KEY PROCESSING ELEMENTS Process Overview Insights  Crushed material is screened, with fines 1) Crushing & – Underground primary & secondary jaw crushers bypassing the tertiary crusher and reporting Screening – Screen at surface to separate size fractions for sorting directly to the mill feed bin 

  27. Slide 27: Cariboo Resource Conversion Potential

    CARIBOO RESOURCE CONVERSION POTENTIAL Plan & Isometric View – North Shaft Zone Reserve Stopes Plan View Resource Stopes Planned Development Pink zones represent Reserve stopes Reserves include a total of 2.07 Moz1 3D View An additional 1.61 Moz contained within M&I resources and 1.86 Moz within Infe

  28. Slide 28: Cariboo Exploration Potential at Depth: Long Section

    CARIBOO EXPLORATION POTENTIAL AT DEPTH: LONG SECTION 1 2  Average deposit depth is ~350 m PROBABLE RESERVES1 2.07 Moz @ 3.62 g/t Au  >500 m additional depth potential of known vein corridors adjacent to mine plan untested M&I RESOURCES1 1.61 Moz @ 2.88 g/t Au 2  Mineralized veins intersected at d

  29. Slide 29: A Potential Generational District

    A POTENTIAL GENERATIONAL DISTRICT Illustrative Comparison of Cariboo Gold vs. Selected Canadian Operating Underground Mines* OSISKO DEVELOPMENT ALAMOS GOLD AGNICO EAGLE AGNICO EAGLE Cariboo Deposit1 Young-Davidson2 Goldex3,4 LaRonde Zone 53,5 Head Grade (Au) 3.62 g/t 2.08 g/t 1.55 g/t 3.62 g/t Gold

  30. Slide 30: Potential for Immediate Exploration Upside at Cariboo

    POTENTIAL FOR IMMEDIATE EXPLORATION UPSIDE AT CARIBOO 14 km trend from Mosquito Creek to Proserpine has exploration potential down to 1500m depth  The sandstone unit hosting the Cariboo Gold Project ("CGP") mineral resources was mapped and modelled and is believed to be continuous along the entire

  31. Slide 31: Developing a Mining Camp

    DEVELOPING A MINING CAMP Cariboo hosts two main trends over 83 km in combined strike length  District-scale exploration upside in under-explored Cariboo Gold Belt  High degree of confidence in geological model with anomalous gold values >2.0 g/t Au in ~80% of drill holes  >185,000 ha property wit

  32. Slide 32: Tintic Project

    TINTIC PROJECT Utah, USA 100% Ownership Double Tap Gesture with solid fill ODV NYSE TSXV 32 Virtual Tour osiskodev.com

  33. Slide 33: Tintic Project: Asset Snapshot

    TINTIC PROJECT: ASSET SNAPSHOT Highly Productive Historical Mining District LOCATION / OWNERSHIP MINE TYPE METALS STAGE LAND PACKAGE 100% ODV Utah, USA Underground Gold, Silver Trixie MRE >20,500 acres of (Q1 2024) Cu, Pb, Zn largely patented claims1 North Lily  Located 95 km south of Salt Lake Cit

  34. Slide 34: Trixie Initial Mineral Resource Estimate

    TRIXIE INITIAL MINERAL RESOURCE ESTIMATE ("MRE")1 RESOURCE TONNES METAL GRADE CONTAINED METAL CUT-OFF GRADE Resources (koz) Grade (g/t Au) CATEGORY (000’s) VARIATION (g/t Au) (g/t Ag) (000’s oz Au) (000’s oz Ag) 27.6 MEASURED 120 27.36 61.73 105 238 24.0 19.1 M&I RESOURCES INDICATED 125 11.17 59.89

  35. Slide 35: Trixie UG Ramp Development: 100% Complete

    TRIXIE UG RAMP DEVELOPMENT: 100% COMPLETE RAMP DEVELOPMENT: ~1,390 M (4,550 ft.) 3 Historic Mineralized Zones Open at Depth and Strike  Complete as of September 2023 756 ORE SHOOT 610 ORE SHOOT SOUTH SURVEY VEIN  Enables bulk extraction at higher tonnage by providing  Developed over 900 ft. (275

  36. Slide 36: Trixie Exploration Potential

    TRIXIE EXPLORATION POTENTIAL 2024 Trixie MRE represents a small footprint of the overall underground potential SOUTH NORTH Trixie MRE 2024 TRIXIE MRE1  440 meter strike length  60 meter width Empire State  195 meter depth building for scale (~4 football fields) Looking East 1. Refer to the full t

  37. Slide 37: East Tintic Regional Exploration Potential

    EAST TINTIC REGIONAL EXPLORATION POTENTIAL Highly prospective 5 km long corridor with 23 historic mines, extensive legacy datasets High-Sulphidation Epithermal Au-Ag Epithermal vein / breccia systems hosted primarily within the basal Tintic Quartzite host rock, found at the Trixie, Eureka Standard a

  38. Slide 38: Appendix

    APPENDIX ODV NYSE TSXV 38 osiskodev.com

  39. Slide 39: Experienced Leadership Team

    EXPERIENCED LEADERSHIP TEAM SEAN ROOSEN, CHAIR & CEO DAVID ROULEAU, VICE PRESIDENT, PROJECT DEVELOPMENT • Founding member of Osisko Mining Corporation (2003-2014) • Seasoned executive with +35 years of operational and management BOARD OF DIRECTORS • Responsible for developing the strategic plan for

  40. Slide 40: Responsible Mine Development

    RESPONSIBLE MINE DEVELOPMENT Committed to responsible mining practices, strong relationships, and mutual support with all partners ENVIRONMENT INDIGENOUS NATIONS ▪ Osisko Development constructed two water treatment ▪ Positive relationship with Lhtako Dené Nation since 2015. plants to treat contact w

  41. Slide 41: Cariboo 2025 Feasibility Study Metrics

    CARIBOO 2025 FEASIBILITY STUDY METRICS Cariboo Gold 2025 FS – Project Operating and Financial Metrics Cariboo Gold 2025 FS – Operating Costs Assumptions units 2025 FS Metric Total LOM Unit Cost Unit Cost Split Gold price US$/oz 2,400 ($ mm) ($/t mined) (US$/oz) (%) Exchange rate USDCAD 1.35 Mining 1

  42. Slide 42: Cariboo Mineral Reserves & Resources

    CARIBOO MINERAL RESERVES & RESOURCES (Measured and Indicated Resources are exclusive of Mineral Reserves) Mineral R&R Probable Reserves Measured Resources Indicated Resources Inferred Resources Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Deposit (000’s) (g/t Au) (

  43. Slide 43: 2024 Trixie Mineral Resources Estimate

    2024 TRIXIE MINERAL RESOURCES ESTIMATE GRADE CONTAINED GRADE CONTAINED DOMAIN CATEGORY TONNES (AU G/T) GOLD (OZ) (AG G/T) SILVER (OZ) Measured 22,678 106.27 77,484 115.99 84,572 Indicated 11,939 23.19 8,902 51.07 19,602 T2 M+I 34,617 77.62 86,387 93.60 104,173 Inferred 1,996 9.82 630 61.38 3,938 Mea

  44. Slide 44: Investor Relations Contact

    PHILIP RABENOK, VICE PRESIDENT, INVESTOR RELATIONS prabenok@osiskodev.com | +1 (437) 423 3644 ODV NYSE TSXV | osiskodev.com