  1. Slide 1: The Kemaman Pellet Plant Project

    The Kemaman Pellet Plant Project An advanced project targeting a niche sector of the iron ore market For personal use only Grange Resources Limited (GRR) Level 11, 200 St Georges Terrace Asia Mining Congress Perth, WA 6000, Australia Singapore Phone + 618 9321 1118 Fax + 618 9321 1523 8 – 10 April 2

  2. Slide 2: Disclaimer

    Disclaimer For personal use only • The material in this presentation (“material”) is not and does not constitute an offer, invitation or recommendation to subscribe for, or purchase, any security in Grange Resources Limited (“GRR”) nor does it form the basis of any contract or commitment. GRR makes

  3. Slide 3: Grange Corporate Profile

    Grange Corporate Profile For personal use only Board of Directors Shares Anthony Bohnenn Non Executive Chairman ASX Code: GRR Russell Clark Managing Director Current shares on Issue: 115,201,099 Alex Nutter Technical Director Unlisted Options on Issue to Rio Tinto: 17,500,000 Richard Krasnoff Non Ex

  4. Slide 4: Growth in Global Seaborne Iron Ore Trade

    Growth in Global Seaborne Iron Ore Trade For personal use only 4

  5. Slide 5: Australian Iron Ore Exports 2007

    Australian Iron Ore Exports 2007 For personal use only Others France Taiwan S.Korea China Japan Dry tonnes basis Sources: Tex Report 5

  6. Slide 6: No Australian Iron Ore is currently sold into Indonesia, Malaysia or the Gulf region

    For personal use only No Australian Iron Ore is currently sold into Indonesia, Malaysia or the Gulf region Why not? 6

  7. Slide 7: Malaysia

    For personal use only 7 MALAYSIA

  8. Slide 8: Demand for DR Pellets

    Demand for DR Pellets For personal use only DR pellet demand is projected to increase significantly in SE Asia and the Gulf Region. 70 60 +40% 50 40 +70% SE Asia Mt 30 Gulf +220% 20 10 0 2006 2008 2012 2017 Source – Sojitz Corporation 8

  9. Slide 9: DR Grade Pellet Prices 2003 - 2015

    DR Grade Pellet Prices 2003 - 2015 For personal use only DR Pellet Prices – FOB Brazil Tubarao DR Pellets 350 300 250 U S c ents /m tu 200 +87% 150 100 50 0 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Metalytics Forecasts 9

  10. Slide 10: Kemaman Pellet Plant – Strategic Position

    Kemaman Pellet Plant – Strategic Position Proximity to Customers For personal use only DR PELLET CONSUMERS COUNTRY 1 Perwaja Steel Malaysia 2 Amsteel Malaysia 3 Krakatau Steel Indonesia 4 Megasteel Malaysia 5 Qasco Qatar 6 Hadeed Saudi Arabia 7 Various UAE 8 Various India BF PELLET CONSUMERS COUNTRY

  11. Slide 11: Project Overview

    Project Overview For personal use only PELLET PLANT PRODUCING 4. DIRECT REDUCTION AND BLAST FURNACE PELLETS 3. CONCENTRATE SHIPPED IN CAPESIZE VESSELS 2. 100KM SLURRY PIPELINE TO ALBANY PORT 1. MINING AND CONCENTRATION OPERATIONS FOR 35 YEARS 11

  12. Slide 12: West Wharf

    For personal use only 12 WEST WHARF

  13. Slide 13: Project Infrastructure – Kemaman Site

    Project Infrastructure – Kemaman Site For personal use only 13

  14. Slide 14: Project Infrastructure - Kemaman

    Project Infrastructure - Kemaman All key infrastructure in place For personal use only ; Deep Water Port West Wharf suitable for Capesize vessels ; Transport Conveyor corridor between Port and pellet plant ; Power, Gas & Power – TNB (substation immediately next to site) Water Gas – Petronas, Water –

  15. Slide 15: Partners

    Partners For personal use only • Sojitz are earning a 30% interest in the project. • Sojitz will pay a royalty to Grange of up to 3.5% on their 30% share of production 15

  16. Slide 16: Project Status

    Project Status For personal use only Item Status Expected Timing Feasibility Study ; Addition testwork with Metso Minerals underway to secure Process Guarantees Malaysian Environmental Approval ; Malaysian Investment Incentives Australian Environmental Approval ; In progress ƒ H2 2008 Project Struct

  17. Slide 17: Project Highlights

    Project Highlights ; For personal use only Advanced Project Feasibility Completed ; Infrastructure in Place ; Ability to produce High Quality (DR Grade) Pellets ; Growing DR Pellet Market in SE Asia & Middle East ; Pellet Plant Close to Key Markets ; Joint Venture with Sojitz – a leader in the pelle