Jupiter Energy Limited · ASX:JPR

Jupiter Energy — Westcoast Mining — Shareholder Meeting (May 2005)

10 slides from Jupiter Energy's shareholder meeting presentation, Jun 2, 2005

  1. Slide 1: Onshore Otway Basin (PEP 163 & PEP 164)

    shore Otway Basin IEP 163 & PEP 164) resentation for Westcoast Mining Limited eneral Meeting of Shareholders _ May.27, 2005

  2. Slide 2: Background

    Background m Announced to the ASX on 26 April 2005 = WML (thru Jupiter Energy (Vic) P/L) to enter into agreement with Lakes Oil NL to acquire 50% interest in Petroleum Exploration Permit (PEP) 163 = Also option to acquire 33.3% of PEP 164 m Expected to start drilling at PEP 163 in mid July 2005 and

  3. Slide 3: Funding

    Funding Placement of 20m WML shares @ 6.5 cents to fund project ($1.3m before costs) Placement to occur within 3 months of this meeting mpact on structure: cl Present capital base of 50.3 m shares with $2m in cash (after recovery of Tuckabianna bond of $864k) cl] New structure expands to 70.3 m, cas

  4. Slide 4: Potential

    Potential PEP 163 located within the Otway Basin Situated close to a large proportion of Victoria’s oil refinery and chemical industry Well located in terms of gas pipeline infrastructure

  5. Slide 5: Why are we investing

    Why are we investing m™ Considered prospective for gas exploration m Large demand for natural gas in the region: <] Geelong <i Alumina smelter at Port Henry =i Cement works at Fyansford and Waurn Ponds m Limited history of other drilling (1962 and 1970) m Benefit from proven knowledge of exploiting

  6. Slide 6: The Fracturing Process

    The Fracturing Process = Prior to fracturing, each individual zone is computer calculated on possible NPV return to ensure expenditure is not wastefully spent.

  7. Slide 7: The Fracturing Process

    The Fracturing Process Fracture opened up Bu High Pressure Fraccing Pluk

  8. Slide 8: The Bellarine JV Agreement

    The Bellarine JV Agreement m Presently Lakes Oil owns 100% of PEP 163 & PEP 164 = Farm in agreement with Lakes Oil NL = Jupiter Energy (JPR) to earn 50% interest in PEP 163 based on expected expenditure approx capped $1.2m m To earn its 50% in PEP 163, JRP will drill Bellarine No. 1 well m Bellarine

  9. Slide 9: Summary

    Summary = Bellarine No. 1 well potential for Oil & Gas discovery. m= Hindhaugh Creek 1 encountered a number of gas zones/shows within the Eumeralla. = In the testing of Hindhaugh Creek it was considered the reservoir was damaged during drilling however it was concluded potential recovery from the zo

  10. Slide 10: Location

    Location of Bellarine No. 1 well Well site is located in non-environmental damaging location PEP 163 LAOH AGH GREEK STSCI Potential 45bcf gas yrs

Westcoast Mining — Shareholder Meeting (May 2005) on 6ix