  1. Slide 1: Hexagon's WAH2 Project: Low Emissions Ammonia From Australia to APAC

    Hexagon Energy Materials Ltd Hexagon’s WAH2 Project Low Emissions Ammonia From Australia to APAC 21 November 2023 © 2023 Hexagon Energy Materials Limited (ASX:HXG) 1 © 2023 Hexagon Energy Materials Limited (ASX: HXG)

  2. Slide 2: Important Notices

    Important Notices DISCLAIMER The purpose of this presentation is to provide background information to assist in obtaining a general understanding of the Company’s proposals and objectives. This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking st

  3. Slide 3: Hexagon Energy Materials

    Hexagon ASX listed project developer (HXG)* Energy Competitive, low-emissions ammonia export project (WAH2), annual net CF A$244 million (100% project)1 Materials Limited Targeting substantial Asian coal co-firing market opportunity, ~US$10 Bn pa market by 20352 Site secured & highly encouraging PFS

  4. Slide 4: The opportunity – substitute ammonia for coal

    The opportunity – substitute ammonia for coal Japan plans to prioritize low-emissions ammonia to meet its climate targets Ammonia for Coal Electricity producers in North Asia are targeting to substitute ammonia for coal in their thermal power stations Govt Backing Co-Firing Emissions Target Current

  5. Slide 5: Japan's Ammonia criteria

    Japan’s Ammonia criteria Australia well-placed, Hexagon best-placed Detailed engineering work by Petrofac Low Less than 4.2 T CO2e /T demonstrates emissions intensity of H2e1, lower preferred and Emissions prioritized 1.1 T CO2e /T H2e, further improvement opportunities identified3 WAH2 Project Base

  6. Slide 6: Project overview - Hexagon's WAH2 export plant

    Project overview - Hexagon’s WAH2 export plant Material volumes of low-emissions, cost competitive ammonia, target online before 2030 S U P P LY END INPUTS PRODUCTION OUTPUTS CHAIN USE Natural gas NH3 WAH2 plant Ammonia NH3 export Power generation to replace coal in CO2 for Japan & Water sequestrati

  7. Slide 7: Project site - allocation of Maitland SIA site

    Project site - allocation of Maitland SIA site Proximity enables lower cost access to required services and infrastructure Hexagon allocated 40 ha site in Maitland SIA • Access to existing deep-water port, existing infrastructure corridors, multiple CCS options; adjacent to DBNGP2 Award of land to p

  8. Slide 8: WAH2 Project is best-placed

    WAH2 Project is best-placed Early mover project with competitive advantages related to tech. choice and secured site > 140 Australian Hydrogen Projects More than 140 hydrogen-related projects have been announced in Australia 30 Low-emissions Ammonia Of these, only 30 are targeting low-emissions ammo

  9. Slide 9: Partnering with experienced industry players

    Partnering with experienced industry players HXG is seeking the fastest, lowest-cost, lowest-risk pathway to production Partners accelerate pathway to operation: By partnering with existing industry players, Hexagon can de-risk technical issues and enable Natural Gas Electric lower costs by using ex

  10. Slide 10: Our team

    Our team Experienced team supplemented by strategic partners to secure way forward for WAH2 Board of Directors Project Leadership Team Industry partners Charles Whitfield Andrew Kirk Stephen Hall Reinhardt Matisons Chairman Commercial Director CEO/ Project Leader Business Development CIO of Drumrock

  11. Slide 11: Pathway to first production

    Pathway to first production Preserving shareholder value by staged approach PRE-FEED FEED PH1 BUILD & COMMISSION • Target completion Q2 2024 • Target completion Q2 2025 • Target completion 2028 • Current funding • Total expenditure ~$12-15 M • Total expenditure ~$1,620 M • Self-fund; any capital rai

  12. Slide 12: Timeline - significant milestones approaching

    Timeline - significant milestones approaching MoUs with counterparties next step for WAH2 Project value realisation Hexagon WAH2 Project Indicative Timeline RFSU 2028 Prefeasibility Basis of Design FID Assess Pre-FEED FEED EPC and commissioning 2023 2024 2025 2026 Award of land Complete Pre-Feasibil

  13. Slide 13: Compelling proposition

    Compelling proposition FEED on WAH2 the next key milestone, pathway to Project partnerships Early mover in Advantaged substantial Near-term Attractive Growth project making market catalysts returns upside significant progress Accessing Ongoing growth Hexagon is a front Secured project site governmen

  14. Slide 14: Questions?

    Questions? WAH2 – practical support for the energy transition © 2023 Hexagon Energy Materials Limited (ASX: HXG) 14

  15. Slide 15: Fuelling the Future

    Fuelling the Future Low Emissions Ammonia From Australia to APAC FOR FURTHER INFORMATION, please contact: Stephen Hall stephenh@hxgenergymaterials.com.au hxgenergymaterials.com.au © 2023 ©Hexagon Energy Energy 2023 Hexagon Materials Limited Limited Materials (ASX: HXG) 15 (ASX:HXG)