    COMPANY PRESENTATION 2022 A RESPONSIBLE COMPANY, A COMPANY OF THE FUTURE!

  2. Slide 2: Message from the General Director

    Slide 2: Message from the General Director

    SNTGN TRANSGAZ is the technical operator of the National Natural Gas Transmission System and ensures the performance in terms of efficiency, transparency, safety, non-discriminatory access and competitiveness of the national strategy established for domestic and international transmission, natural g

  3. Slide 3: Vision, Mission, Activities

    Slide 3: Vision, Mission, Activities

    VISION, MISSION, ACTIVITIES MODERN, DYNAMIC EXCELLENCY ORIENTED COMPANY! VISION The company intends to become an internationally recognized gas transmission operator, a leader on the energy market in the region, with a ACTIVITIES modern national gas transmission system, integrated at European level

  4. Slide 4: Main Components of the National Gas Transmission System

    Slide 4: Main Components of the National Gas Transmission System

    MAIN COMPONENTS OF THE NATIONAL GAS TRANSMISSION SYSTEM  14.209,55 km main transmission pipelines and connections for gas supply, of which 183,5 km international gas transmission pipelines and 482 km the BRUA CURRENT NTS INFRASTRUCTURE pipeline;  1.141 gas metering regulating stations (1.247 meter

  5. Slide 5: Certifications, Corporate Governance, Shareholding

    Slide 5: Certifications, Corporate Governance, Shareholding

    CERTIFICATIONS, CORPORATE GOVERNANCE, SHAREHOLDING SHAREHOLDING WE TRANSMIT GAS IN EFFICIENCY AND MAXIMUM SECURITY CONDITIONS As of 2008, TRANSGAZ is an active presence on the capital market in Romania, being listed on the Bucharest Stock Exchange. CERTIFICATIONS In line with the unbundling requirem

  6. Slide 6: Organizational Structure

    Slide 6: Organizational Structure

    ORGANIZATIONAL STRUCTURE TRANSGAZ is structured by functional units (divisions, units, departments, offices, compartments etc.) and production entities (9 regional offices, sectors, laboratories, working units etc.). TRANSGAZ has a great number of engineers and The evolution of the number of employe

  7. Slide 7: Efficient Capabilities in Research and Design

    Slide 7: Efficient Capabilities in Research and Design

    EFFICIENT CAPABILITIES IN RESEARCH AND DESIGN The research and design activity includes very complex strategic activities aiming at: Rehabilitation and upgrading of the gas transmission system so as to increase safety; Increasing energy efficiency; 146 Metering gas flows; 125 Environmental and labou

  8. Slide 8: Natural Gas Transmission (2)

    Slide 8: Natural Gas Transmission (2)

    NATURAL GAS TRANSMISSION (2) CIRCULATED NATURAL GAS Natural gas volumes circulated (including storage quantities) - mil.cm - rolling 12 months 13.986 14.160 14.059 14.098 13.868 13.541 13.098 13.248 12.722 12.876 12.343 12.419 Jan. 21 Feb. 21 Mar. 21 Apr. 21 May. 21 Jun. 21 Jul. 21 Aug. 21 Sep. 21 O

  9. Slide 9: Natural Gas Transmission (4)

    Slide 9: Natural Gas Transmission (4)

    NATURAL GAS TRANSMISSION (4) NATURAL GAS CONSUMPTION IN NTS Natural gas aquisition price for technological consumption (RON/MWH) 105,65 104,22 114,77 114,49 114,06 114,11 114,20 114,24 115,99 115,85 114,95 114,21 Jan.21 Feb.21 Mar.21 Apr.21 May.21 Jun.21 Jul.21 Aug.21 Sep.21 Oct.21 Nov.21 Dec.21 % T

  10. Slide 10: Main Strategic Objectives 2021-2025

    Slide 10: Main Strategic Objectives 2021-2025

    MAIN STRATEGIC OBJECTIVES 2021-2025 As a gas transmission system operator certified according to the Third Continuity of the activity and ensuring safety and security of gas supply Increasing the level of security of the NST and gas supply safety Energy Package, of July 2010 TRANSGAZ is member of EN

  11. Slide 11: Transgaz' Investment Program 2021-2030 - Draft

    Slide 11: Transgaz' Investment Program 2021-2030 - Draft

    TRANSGAZ’ INVESTMENT PROGRAM 2021-2030 - DRAFT MAJOR PROJECTS ̴ 3,4 BILLION EURO 11

  12. Slide 12: Major Development Projects 2021-2030 (I)

    Slide 12: Major Development Projects 2021-2030 (I)

    MAJOR DEVELOPMENT PROJECTS 2021-2030 (I) - draft Estimated Project Completion Project value Project importance Project status no date mil. Euro Ensuring a natural gas transmission capacity to Hungary of 1.75 bcm/y and 1.5 bcm/y to Bulgaria. Development on Romania's territory of the The project impor

  13. Slide 13: Major Development Projects 2021-2030 (II)

    Slide 13: Major Development Projects 2021-2030 (II)

    MAJOR DEVELOPMENT PROJECTS 2021-2030 (II) - draft Project Estimated value Project no. Project Completion date Project importance mil. Euro status Establish an interconnection pipeline with Serbia to diversify sources of supply and increase 8 Romania-Serbia Interconnection 56.21 2024 A non FID energy

  14. Slide 14: Major Development Projects 2021-2030 (III)

    Slide 14: Major Development Projects 2021-2030 (III)

    MAJOR DEVELOPMENT PROJECTS 2021-2030 (III) - draft The financing modalities considered for the achievement of the key projects for the development of the National Transmission System between SNTGN Transgaz SA seeks, to obtain, through sustained efforts, financial 2021 – 2030 (draft) from: support fo

  15. Slide 15: The Main Development Projects 2021-2030 (IV)

    Slide 15: The Main Development Projects 2021-2030 (IV)

    THE MAIN DEVELOPMENT PROJECTS 2021-2030 (IV) PROJECT BENEFITS integration of the natural gas market and interoperability of natural gas transmission systems in the region; the convergence of gas prices in the region; increasing the flexibility of the European gas transmission system by bidirectional

  16. Slide 16: Corridor between Bulgaria and Hungary (ROHUAT/BRUA), Phase 1

    Slide 16: Corridor between Bulgaria and Hungary (ROHUAT/BRUA), Phase 1

    Corridor between Bulgaria and Hungary (ROHUAT /BRUA), Phase 1 Aim:  development of the gas transmission capacity between the Romanian and the Bulgarian and Hungarian gas transmission systems Capacity:  1.75 bcm/y to Hungary  1.50 bcm/y to Bulgaria Necessary investments:  32’’x63 bar 479 km pipel

  17. Slide 17: Corridor between Bulgaria and Hungary (ROHUAT/BRUA), Phase 2

    Slide 17: Corridor between Bulgaria and Hungary (ROHUAT/BRUA), Phase 2

    Corridor between Bulgaria and Hungary (ROHUAT / BRUA), PHASE 2 Aim:  The project aims to increase the gas flow to Hungary Proiectul major through the Horia - Csanadpalota interconnector de dezvoltare a coridorului Bulgaria– România–Ungaria– Austria (BRUA)-Faza 2 Conducte SNT existente Capacity incr

  18. Slide 18: Southern Transmission Corridor for Black Sea gas

    Slide 18: Southern Transmission Corridor for Black Sea gas

    Development on the Romanian territory of the Southern Transmission Corridor for taking over gas from the Black Sea shore Aim:  create a transmission infrastructure for taking over to be produced in the Black Sea Necessary investments:  the Black Sea shore–Amzacea pipeline, 32.5 km, Ø 48” (DN1200)

  19. Slide 19: Interconnection of the NTS with the T1 Pipeline and Reverse Flow at Isaccea

    Slide 19: Interconnection of the NTS with the T1 Pipeline and Reverse Flow at Isaccea

    INTERCONNECTION OF THE NTS WITH THE T1 PIPELINE AND REVERSE FLOW AT ISACCEA Aim:  create a transmission corridor between Bulgaria, Romania and Ukraine  ensure physical reveres flow at the Negru Vodă 1 point, according to EU Regulation 994/2010 Necessary investments: Phase1  rehabilitation of DN 8

  20. Slide 20: NTS Developments in the North-Eastern area of Romania

    Slide 20: NTS Developments in the North-Eastern area of Romania

    NTS Developments in the North-Eastern area of Romania Aim:  enhancing gas supply to North – East Romania  ensuring 1.5 bcm/y transmission capacity at the interconnection point between the transmission systems of Romania and Moldova Necessary investments:  construction of a DN 700 x 104.1 km pipel

  21. Slide 21: Enlargement of the BRUA Corridor, Phase 3

    Slide 21: Enlargement of the BRUA Corridor, Phase 3

    Enlargement of the BRUA bidirectional transmission corridor (ROHUAT/BRUA), Phase 3 Aim:  development of gas transmission capacity on the Oneşti – Coroi – Haţeg – Nădlac corridor depending on the Black Sea or other onshore blocks gas volumes Necessary investments:  rehabilitation of some pipeline s

  22. Slide 22: New NTS developments for taking over Black Sea gas

    Slide 22: New NTS developments for taking over Black Sea gas

    New NTS developments for taking over Black Sea gas Aim:  creation of an additional point for taking over natural gas discovered in the submarine exploitation perimeters of the Black Sea Necessary investments:  construction of a 24.37 km DN 500 gas transmission pipeline from the Black Sea shore to

  23. Slide 23: NTS interconnection with the gas transmission system in Serbia

    Slide 23: NTS interconnection with the gas transmission system in Serbia

    NTS interconnection with the gas transmission system in Serbia Aim:  enhancing security of energy supply to the region Necessary investments:  construction of an approximately 97km long pipeline in the Recaș – Mokrin direction of which about 85 km on the territory of Romania and 12 km on the terri

  24. Slide 24: Upgrading GMS Isaccea 1

    Slide 24: Upgrading GMS Isaccea 1

    Upgrading GMS Isaccea 1 Aim:  increasing the level of energy security in the region Necessary investments:  construction of a new bidirectional gas metering station, replacing the existing one. Total costs :  13.88 mil. Euro - upgrading GMS Isaccea 1 Final Investment Decision – 2018 Commissioning

  25. Slide 25: Upgrading of the gas transmission infrastructure in North-Western Romania

    Slide 25: Upgrading of the gas transmission infrastructure in North-Western Romania

    Development/Upgrading of the gas transmission infrastructure in the North-Western part of Romania Aim:  creation of new gas transmission capacities Necessary investments:  construction of a pipeline and of the related equipment in the direction Horia–Medieșu Aurit  construction of a pipeline and

  26. Slide 26: Romania-Bulgaria interconnection capacity increase, Giurgiu-Ruse

    Slide 26: Romania-Bulgaria interconnection capacity increase, Giurgiu-Ruse

    Increase in the gas transmission capacity of the interconnection Romania-Bulgaria, in the Giurgiu-Ruse direction Aim:  enhancing security of energy supply to the region Necessary investments:  construction of a new gas transmission pipeline and related facilities  construction of a new Danube und

  27. Slide 27: EASTRING - Romania

    Slide 27: EASTRING - Romania

    EASTRING - Romania Aim:  EASTRING will ensure the most cost-reflective and direct transmission route between the gas platforms from the Western European region and the Balkans/Western Turkey. The possibility to diversify transmission routes and gas supply sources will safeguard the regional securit

  28. Slide 28: Modernization of SMG Isaccea 2 and SMG Negru Vodă 2

    Slide 28: Modernization of SMG Isaccea 2 and SMG Negru Vodă 2

    Modernization of SMG Isaccea 2 and SMG Negru Vodă 2 Aim:  Enabling bidirectional flow on the T2 pipeline, part of the Trans-Balkan corridor Necessary investments:  modernization of the existing gas metering stations Total estimated costs:  26.65 mil. Euro Estimated commissioning - 2024 28

  29. Slide 29: Modernization of SMG Isaccea 3 and SMG Negru Vodă 3

    Slide 29: Modernization of SMG Isaccea 3 and SMG Negru Vodă 3

    Modernization of SMG Isaccea 3 and SMG Negru Vodă 3 Aim:  Enabling bidirectional flow on the T3 pipeline, part of the Trans-Balkan corridor Necessary investments:  modernization of the existing gas metering stations Total estimated costs:  26.65 mil. Euro Estimated commissioning - 2028 29

  30. Slide 30: NTS interconnection at the LNG terminal on the Black Sea coast

    Slide 30: NTS interconnection at the LNG terminal on the Black Sea coast

    SNT interconnection at the LNG terminal located on the Black Sea coast Aim:  taking over natural gas from the Black Sea coast Necessary investments:  realization of an interconnection of the national natural gas transmission system at the LNG terminal by building a natural gas transmission pipelin

  31. Slide 31: Interconnection with the Gas Transmission System of Moldova

    Slide 31: Interconnection with the Gas Transmission System of Moldova

    Interconnection between the Gas Transmission System of Romania and the Gas Transmission System of the Republic of Moldova, in the Iaşi – Ungheni – Chișinău direction Iași – Ungheni – Phase I; Ungheni – Chișinău – Phase II Aim: Increasing interconnectivity between Romania and the Republic of Moldova

  32. Slide 32: Financial Preliminary Results 2021

    Slide 32: Financial Preliminary Results 2021

    FINANCIAL PRELIMINARY RESULTS 2021 1. Statement of comprehensive income as at 31.12.2021 2. Statement of financial standing as at 31.12.2021 3. Statement of consolidated comprehensive income as of 31.12.2021 4. Statement of consolidated financial standing as of 31.12.2021 32

  33. Slide 33: Preliminary Financial Results 2021 (1)

    Slide 33: Preliminary Financial Results 2021 (1)

    PRELIMINARY FINANCIAL RESULTS 2021 (1) STATEMENT OF COMPREHENSIVE INCOME AS AT 31.12.2021 (1) CHANGES 2021 THOUSAND LEI 2019 2020 2021/2020 preliminary Absolute Relative Operational revenue before the balancing and construction activity according to IFRIC12 1,576,667 1,333,504 1,364,511 31,007 2% Re

  34. Slide 34: Preliminary Financial Results 2021 (2)

    Slide 34: Preliminary Financial Results 2021 (2)

    PRELIMINARY FINANCIAL RESULTS 2021 (2) STATEMENT OF COMPREHENSIVE INCOME AS AT 31.12.2021 (2) CHANGES 2021 THOUSAND LEI 2019 2020 2021/2020 preliminary Absolute Relative Revenues from domestic gas transmission activity 1,192,598 1,150,465 1,164,419 13,954 1% Revenues from the international gas trans

  35. Slide 35: Preliminary Financial Results 2021 (3)

    Slide 35: Preliminary Financial Results 2021 (3)

    PRELIMINARY FINANCIAL RESULTS 2021 (3) STATEMENT OF FINANCIAL STANDING AS AT 31.12.2021 CHANGES 2021 2021/2020 THOUSAND LEI 2019 2020 preliminary Absolute Relative Fixed assets 4,484,129 6,054,436 6,460,927 406,491 7% Current assets 1,285,039 1,093,398 1,217,968 124,570 11% Total assets 5,769,168 7,

  36. Slide 36: Preliminary Financial Results 2021 (4)

    Slide 36: Preliminary Financial Results 2021 (4)

    PRELIMINARY FINANCIAL RESULTS 2021 (4) MAIN INDICATORS 2021-preliminary 2020 EBITDA in total sales 28,94% 28,13% EBITDA in total equity 12,56% 10,96% 1.683.775 Gross profit ratio 14,31% 14,19% Return on capital 4,56% 4,63% Current liquidity ratio 1,36 1,56 Quick liquidity ratio 1,01 1,29 Gearing 44,

  37. Slide 37: Preliminary Financial Results 2021 (5)

    Slide 37: Preliminary Financial Results 2021 (5)

    PRELIMINARY FINANCIAL RESULTS 2021 (5) STATEMENT OF CONSOLIDATED COMPREHENSIVE INCOME AS AT 31.12.2021 CHANGES MII LEI 2021 2021/2020 2019 2020 preliminary Absolute Relative Operating revenue before the balancing and construction activity according to IFRIC12 1,575,925 1,338,015 1,364,950 26,935 2%

  38. Slide 38: Preliminary Financial Results 2021 (6)

    Slide 38: Preliminary Financial Results 2021 (6)

    PRELIMINARY FINANCIAL RESULTS 2021 (6) STATEMENT OF CONSOLIDATED FINANCIAL STANDING AS AT 31.12.2021 2021 2019 2020 CHANGES THOUSAND LEI preliminary 4,424,616 6,060,659 6,639,395 578,736 10% Fixed assets 1,372,100 1,160,990 1,323,505 162,515 14% Current assets 5,796,716 7,221,649 7,962,899 741,250 1

  39. Slide 39: Stock Exchange TGN Evolution (1)

    Slide 39: Stock Exchange TGN Evolution (1)

    STOCK EXCHANGE TGN EVOLUTION (1) MAIN CORPORATE EVENTS WITH AN IMPACT UPON THE SHARE PRICE IN 2021 39

  40. Slide 40: Stock Exchange TGN Evolution (2)

    Slide 40: Stock Exchange TGN Evolution (2)

    STOCK EXCHANGE TGN EVOLUTION (2) Market capitalization TGN EVOLUTION 3.332 2.779 306,00 297,00 292,00 300,00 292,00 293,00 561 684 291,00 284,00 285,00 290,00 283,00 277,00 330,50 294,00 287,50 268,00 280,00 270,50 30.12.2021 31.12.2020 254,50 264,00 257,50 240,00 mil. LEI mil. EURO 236,00 219,00 Ja

  41. Slide 41: Stock Exchange TGN Evolution (3)

    Slide 41: Stock Exchange TGN Evolution (3)

    STOCK EXCHANGE TGN EVOLUTION (3) TGN share compared to main BVB indicators 41

  42. Slide 42: Social responsibility policy

    Slide 42: Social responsibility policy

    The essential role of TRANSGAZ in the energy field in Romania and Europe is naturally complemented by the desire to support the real needs of all those who are constantly contributing to the smooth running of its operations. Consistent with the principle of applying responsible management in fulfill

  43. Slide 43: www.transgaz.ro

    Slide 43: www.transgaz.ro

    TRANSGAC www.transgaz.ro

Source: Internet Archive copy of transgaz.ro