Slide 1: Cheniere Energy August 2013
Cheniere Energy August 2013
Slide 2: Forward Looking Statements
Forward Looking Statements 2 This presentation contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. All statements, o
Slide 3: Organizational Structure and Future Developments Summary
2.0% Interest & Incentive Dist. Rights Cheniere Energy, Inc. (NYSE MKT: LNG) Sabine Pass LNG, L.P. (“SPLNG”) Sabine Pass Liquefaction, LLC (“SPL”) Cheniere Energy Partners, L.P. (NYSE MKT: CQP) Cheniere Creole Trail Pipeline, L.P. (“CTPL”) Corpus Christi Liquefaction, LLC Cheniere Marketing, LLC (“C
Slide 4: Operating Assets
Operating Assets Sabine Pass LNG Terminal Creole Trail Pipeline 4
Slide 5: Contracted Capacity at SPLNG
Contracted Capacity at SPLNG Third Party Terminal Use Agreements (TUAs) Long-term, 20 year “take-or-pay” style commercial contracts ~$253MM annual fixed fee revenue Total Gas & Power N.A. Chevron U.S.A. Inc. Capacity 1.0 Bcf/d 1.0 Bcf/d Fees (1) Reservation Fee (2) $0.28/MMBTU $0.28/MMBTU Opex Fee (
Slide 6: Projected Global LNG Demand Growth
Projected Global LNG Demand Growth Regional LNG Import Outlook (mtpa)* Source: Facts Global Energy 18 20 19 2015 2020 2030 2015 2020 2030 6 14 30 2015 2020 2030 2015 2020 2030 Americas Europe Asia Middle East *Base-case scenario 192 242 310 87 123 152 From 303 mtpa (~40 Bcf/d) in 2015 to 511 mtpa (~
Slide 7: Regional Natural Gas & LNG Prices
0 2 4 6 8 10 12 14 16 18 20 A u g- 0 9 A u g- 1 0 A u g- 1 1 A u g- 1 2 A u g- 1 3 $/MMBtu Regional Natural Gas & LNG Prices As of August 12, 2013 NBP IFERC HH Monthly Japan Avg LNG European Gas Contract Estimated Prices Henry Hub: $4.00 / MMBtu Brent Crude: $100 / Barrel ($/MMBtu) Americas Europe A
Slide 8: Brownfield LNG Export Project Utilizes Existing Assets
Brownfield LNG Export Project Utilizes Existing Assets Trains 1-4 Fully Contracted, Under Construction Significant infrastructure in place including storage, marine and pipeline interconnection facilities; pipeline quality natural gas to be sourced from U.S. pipeline network Liquefaction Trains 3 &
Slide 9: LNG Sale and Purchase Agreements (SPAs)
LNG Sale and Purchase Agreements (SPAs) (1) BG has agreed to purchase 182,500,000 MMBtu, 36,500,000 MMBtu, 34,000,000 MMBtu and 33,500,000 MMBtu of LNG volumes annually upon the commencement of operations of Trains 1, 2, 3 and 4, respectively. Total has agreed to purchase 91,250,000 MMBtu of LNG vol
Slide 10: Sabine Pass Liquefaction – Stage Construction
Sabine Pass Liquefaction – Stage 1 Construction
Slide 11: Aerial View of SPL Construction – June 2013
Aerial View of SPL Construction – June 2013 11 Train 1 Train 2 Compressor Area T1 Air Coolers Cold Box Foundations Compressor Area T2 Propane Condenser Foundations
Slide 12: SPLNG Estimated Cash Flows
SPLNG Estimated Cash Flows (With Trains 1 – 4 Operational) Total Revenues Total Expenses Total Chevron SPL Other EBITDA (1) 127 133 290 10 560 (65) $ 495 $ Distributable cash flow to CQP $ 365 ($ in millions) Debt Service (2) (130) Annualized (1) EBITDA is a non-GAAP measure. EBITDA is computed as t
Slide 13: SPL Estimated Cash Flows Trains 1-4
SPL Estimated Cash Flows Trains 1-4 Total Revenues BG Gas Natural KOGAS GAIL Total Centrica Commodity payments, net (1) O&M, gas procurement & other SPLNG/Total TUA Pipeline Costs EBITDA (2) 725 455 550 550 - - 275 2,555 (285) (320) (160) (765) $ 1,790 $ ($ in millions) Total Expenses (1) Assumes $6
Slide 14: CQP Estimated Distributable Cash Flows Trains 1-4
CQP Estimated Distributable Cash Flows Trains 1-4 Total distributable cash flow by units (1) General partner Cheniere common units Public and BX common units Net cash flow per unit (1) 295 690 690 $ 3.00 $ Total distributable cash flow $ 1,675 ($ in millions) SPLNG distributable cash flow SPL distri
Slide 15: Cheniere Estimated Steady State Cash Flows
Cheniere Estimated Steady State Cash Flows (With Trains 1 – 4) ($ in millions) Net Cash Flows Cheniere Energy, Inc. Distributions from CQP Management fees CEI expenses and other 985 50 (85) 950 $ $ plus: Est. CF generated at CEI from CMI SPA (1) $0 - $1,000 (1) CMI is entitled to recover all operati
Slide 16: Summary Organizational Structure
Summary Organizational Structure Cheniere Energy, Inc. (NYSE MKT: LNG) Cheniere Energy Partners, L.P. (NYSE MKT: CQP) Sabine Pass LNG, L.P. (SPLNG) 58% Cheniere Energy, Inc. (1) 29% Blackstone (1) 13% Public (1) BG SPA (286.5 million MMBtu / yr) Gas Natural SPA (182.5 million MMBtu / yr) KOGAS
Slide 17: CMI SPA – Excess Volumes from Trains 1-4 at SPL
CMI SPA – Excess Volumes from Trains 1-4 at SPL CMI-SPL SPA provides CMI with up to 2 mtpa of LNG delivered FOB Sabine Pass starting with the initial production from Train 1 •Maximum Annual Contract Quantity of up to 104 TBtu/year from first four trains SPA sharing mechanic incents profit maximi
Slide 18: Corpus Christi Liquefaction Project
Corpus Christi Liquefaction Project Proposed Facility >1,000 acres owned and/or controlled near Corpus Christi, TX 3 trains, each 4.5 mtpa design capacity 2 berths 3 LNG storage tanks (~10.1 Bcfe of storage) ConocoPhillips’ Optimized Cascade® Process Key Project Attributes Marine environ
Slide 19: Timeline & Milestones
Timeline & Milestones Initiate permitting process (FERC & DOE) Commercial agreements 2014 EPC contract 2014 Financing commitments 2015 Regulatory approvals 2014 Issue Notice to Proceed 2015 Commence operations (1) 2016/17 2018 Milestone Corpus Christi (1) Each Train is expected to comm
Slide 20: Appendix
CHENIERE = Appendix
Slide 21: Construction Completion Schedules Trains 1-4
2012 2013 2014 2015 2016 2017 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 Guaranteed Accelerated Guaranteed Accelerated Early Engine
Slide 22: Why Bechtel
Why Bechtel Constructed one-third of the world’s liquefaction facilities - more than any other contractor Top US construction contractor for 15 straight years by Engineering News-Record Bechtel was the EPC contractor for the regasification project at the Sabine Pass LNG Terminal, which was con
Slide 23: Regulatory Approvals
Regulatory Approvals LNG Export Projects SPL Trains 1-4: FERC and DOE authorization received • DOE: Authorization to Export 2 Bcf/d – Approval to export to Free Trade Nations received in Aug. 2010 – Approval to export to Non-free Trade Nations received in May 2011 – Final order received in Aug. 20
Slide 24: Creole Trail Pipeline
Current Facility Receipt capacity from SPLNG: 2.0 Bcf/d Diameter: 42-inch; Length: 94 miles Delivery Points: NGPL, Transco, TGPL, FGT, Bridgeline, Tetco, Trunkline No compression Pipeline Modifications Delivery capacity to SPLNG: 1.5 Bcf/d Receipt points: TETCO, Trunkline, Transco One new com
Slide 25: 2012 Global LNG Supply & Demand
2012 Global LNG Supply & Demand 2012 Global LNG Capacity: ~37.3 Bcf/d Natural Gas Oil Products LNG Importers - Price Indexation Japan Crude Cocktail 2012 Global LNG Demand: ~31.5 Bcf/d No r th Ame r ica S outh Ame r ica E u r ope A sia 6.5 1.4 1.1 22 A ust r alia - 3.3 B r unei - 1.0 Indonesia - 4.6
Slide 26: U.S. Natural Gas Markets
US Proved Non-Producing Reserves Productive Capacity from Unconventional Reservoirs Tcf Bcf/d MMB/d Current market fundamentals in the U.S. – increased production, increased natural gas reserves and lackluster increase in natural gas demand – have created an opportunity to expand into exports – be
Slide 27: Primary Gas Sources for Sabine Pass Liquefaction
Montana Thrust Belt Cody Gammon Hilliard Baxter- Mancos Greater Green River Basin Forest City Basin Pierre Illinois Basin Piceance Basin Lewis San Juan Basin Raton Basin Anadarko Basin PaloDuro Basin Permian Basin Barnett Woodford Pearsall Eagle Ford Rio Grande Embayment Barnett Woodford Michigan Ba
Slide 28: Multiple Local Pipeline Interconnections
Multiple Local Pipeline Interconnections Provide Several Options for Access to Natural Gas Supply Targa Columbia Gulf Tennessee Cheniere Creole Trail Pipeline Trunkline Kinder Morgan Louisiana Pipeline NGPL Texas to Louisiana (bi-directional) Transco TETCO Tennessee FGT ) Existing Pipeline Grid Tran
Slide 29: U.S. DOE Applications for LNG Exports
Source: Office of Oil and Gas Global Security and Supply, Office of Fossil Energy, U.S. Department of Energy; U.S. Federal Energy Regulatory Commission; Company releases U.S. DOE Applications for LNG Exports* ** Application filed = v, FERC scheduling notice issued = 29 Expected Order to be Process
Slide 30: Projected Firm Liquefaction Capacity Additions
Projected Firm Liquefaction Capacity Additions 0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75 3.00 13Q1 13Q2 13Q3 13Q4 14Q1 14Q2 14Q3 14Q4 15Q1 15Q2 15Q3 15Q4 16Q1 16Q2 16Q3 16Q4 17Q1 17Q2 17Q3 17Q4 18Q1 18Q2 18Q3 18Q4 2013 2014 2015 2016 2017 2018 Asia Pacific Atlantic Basin Bcf/d Skik
Slide 31: Conversion of Class B and Subordinated Units
Conversion of Class B and Subordinated Units Mandatory conversion: within 90 days of the substantial completion of Train 3 Optional conversion by a Class B unitholder may occur at any of the following times: • After 83 months from issuance of EPC notice to proceed • Prior to the record date for
Slide 32: Pro Forma CQP Ownership
Pro Forma CQP Ownership Current common unit annualized distribution expected to be $1.70/unit (2) Class B units accrete 3.5% quarterly until converted into common units (1) Unit amounts are current units outstanding, including Blackstone’s total investment of $1.5B but excluding accretion of Cla
Slide 33: Condensed Balance Sheets As of June 30, 2013
Condensed Balance Sheets As of June 30, 2013 (1) Includes intercompany eliminations and reclassifications. (2) For complete balance sheets, see the Cheniere Energy, Inc., Cheniere Energy Partners, L.P and Sabine Pass LNG, L.P. Quarterly Report on Form 10-Q for the quarter ended June 30, 2013, filed
Slide 34: Slide 34
Slide 35: Investor Relations Contacts
Nancy Bui: Director, Investor Relations – (713) 375-5280, nancy.bui@cheniere.com Christina Burke: Manager, Investor Relations – (713) 375-5104, christina.burke@cheniere.com Investor Relations Contacts: