  1. Slide 1: Colorado DSM Roundtable Discussion

    Xcel Energy Colorado DSM Roundtable Discussion February 18, 2010 1:00pm to 4:15pm TSB Basement Room 019

  2. Slide 2: Welcome and Introductions

    Welcome and Introductions Contact Info: Suzanne Doyle Manager, DSM Regulatory Strategy & Planning Office Phone: 612-330-5518 Cell Phone: 612-599-5785 E-mail: Suzanne.Doyle@xcelenergy.com

  3. Slide 3: Agenda

    Agenda 1:00 – 1:05 Welcome, Introductions (Doyle) 1:05 – 1:15 Regulatory Updates (Doyle) 1:15 – 2:15 Update on Potential Study (Coito) 2:15 – 2:30 Break 2:30 – 3:15 DSM Program Highlights (Gabler) 3:15 – 3:35 Product Development Update (Spargo) 3:35 – 4:00 Recommendations from Program Evaluations (H

  4. Slide 4: Regulatory Updates

    Regulatory Updates Presented by: Suzanne Doyle Compliance Complianceinformation informationisisavailable available at atXcel XcelEnergy’s Energy’sDSM DSMWebsite: Website: http://www.xcelenergy.com/Colorado/Company/About_Energy_ http://www.xcelenergy.com/Colorado/Company/About_Energy_ and_Rates/Deman

  5. Slide 5: 2009 60-Day Notices

    2009 60-Day Notices † April 14, 2009 † September 28, 2009 ‹ Boiler Efficiency ‹ Insulation Rebates ‹ Cooling Efficiency ‹ AC Tune-Ups (under High-Efficiency † April 30, 2009 AC Program) ‹ Furnace Efficiency ‹ ENERGY STAR New Homes ‹ Motor & Drive Efficiency ‹ Cooling Efficiency ‹ Compressed Air Effi

  6. Slide 6: 2010 60-Day Notices

    2010 60-Day Notices † February 8, 2010 ‹ AC Tune-Up Pilot ‹ Standard Offer ‹ Smart Grid Pricing Pilot † Future Notices ‹ New Commercial heating products ‹ Implementation of Evaluation Recommendations (See Market Research section) 6

  7. Slide 7: Recent Filings

    Recent Filings ƒ February 1, 2010 - Methodology for the Calculation of Lost Revenues coming from the most recent gas rule changes ƒ February 15, 2010 - Written Quarterly Update of programs status, energy, demand, and expenditures ƒ February 15, 2010 - Quarterly Report on number and value of rebates

  8. Slide 8: Upcoming Filings

    Upcoming Filings ƒ 2011 DSM Plan (Electric & Gas) – † Feb 2010 – Motion to Modify Procedures † May 2010 – DSM Strategic Issues Application † July 2010 – 2011 DSM Plan † July 2011 – 2012/13 DSM Plan (or 2012/13/14) ƒ 2009 DSM Annual Report (Electric & Gas) † April 1, 2010 – Status Report † April 1, 2

  9. Slide 9: Filing Details

    Filing Details ƒ February 2010 – Motion to Modify Procedures † One year Plan (for 2011 instead of biennium) filed in 2010 † Bifurcated Filing – separate strategic issues from 2011 Plan † Minor changes/additions reflected in 2011 Plan ƒ May 2010 – DSM Strategic Issues Application † Commission Order a

  10. Slide 10: 2009 Electric & Natural Gas DSM Potential Study

    2009 Electric & Natural Gas DSM Potential Study Presented By: Fred Coito 10

  11. Slide 11: Break

    (2) Xcel Energy’ Break

  12. Slide 12: DSM Program Highlights

    DSM Program Highlights Presented By: Lee Gabler

  13. Slide 13: Preliminary 2009 DSM Achievements

    Preliminary 2009 DSM Achievements ƒ Electric Goals: 56.5 MW, 175 GWh, $50.5M ƒ Electric Achievements: 70.6 MW, 218 GWh, $43.9M ƒ Gas Goals: 318,140 Dth, $12.6M ƒ Gas Achievements: 303,077 Dth, $11.6M 13

  14. Slide 14: Residential and Low-Income Program Highlights

    Residential and Low-Income Program Highlights

  15. Slide 15: Residential Program Highlights

    Residential Program Highlights ƒ Launched 11 new gas and electric programs. ƒ Over 1.2M CFL bulbs sold through four retail partners. ƒ Enrolled over 700 trade partners participating in cooling, heating, water heating and insulation rebate programs. ƒ Achieved 137% of Gas Dth goal/103% of budget. ƒ A

  16. Slide 16: Low-Income Program Highlights

    Low-Income Program Highlights ƒ Launched four new gas and electric programs. ƒ Over 36,000 low-income kits distributed to income-qualified customers. ƒ Over 1,700 single-family and 700 gas/1,300 electric multi-family weatherization participants. ƒ Achieved 88% of Gas Dth goal/87% of budget. ƒ Achiev

  17. Slide 17: Commercial Energy Efficiency Program Highlights

    Commercial Energy Efficiency Program Highlights

  18. Slide 18: Commercial Program Highlights

    Commercial Program Highlights ƒ Launched 3 new programs ‹ Data Center Efficiency ‹ Commercial Real Estate (Segment Efficiency) ‹ Small Business Lighting ƒ Created and launched Recommissioning calculation workbook ƒ Achieved significant energy savings from Lighting Efficiency Program ‹ 234% of net ge

  19. Slide 19: Industrial Energy Efficiency Program Highlights

    Industrial Energy Efficiency Program Highlights

  20. Slide 20: Industrial Program Highlights

    Industrial Program Highlights ƒ Built Pipeline In New Programs ‹ Process Efficiency ‹ Self-Direct ‹ Boiler Efficiency ƒ Good Results in Custom Efficiency ‹ 10.2 Gen GWh; 136% of goal ‹ 116 projects completed in all end uses ‹ 7 gas projects completed; 61 projects submitted for pre- approval 20

  21. Slide 21: DSM Product Development Update

    DSM Product Development Update Presented by: George Spargo & Pat Goggin DSM DSMWebsite Websiteprovides providesprogram programidea ideasubmission submissionforms formsat: at: http://www.xcelenergy.com/Colorado/Company/About_Energy_and_Ra http://www.xcelenergy.com/Colorado/Company/About_Energy_and_Ra

  22. Slide 22: Product Development Team

    Product Development Team ƒ George Spargo – Manager – 612-330-6036 ƒ Anne Kraft – Commercial Segment – 612-330-7582 ƒ Pat Goggin – Industrial Segment – 303-294-2370 ƒ Nathan Huso – Residential Segment – 612-330-xxxx 22

  23. Slide 23: 60-Day Notice

    60-Day Notice ƒ Residential Air Conditioning Tune-Up Pilot † Filed February 8, 2010 ƒ New Commercial Heating Efficiency Products † Prescriptive rebates for replacing working boilers † Prescriptive rebates for low- and high-pressure steam boilers † Prescriptive rebates for commercial water heaters †

  24. Slide 24: 2009 AC Tune-Up Pilot

    2009 AC Tune-Up Pilot ƒ Reports filed with 60-Day Notices ƒ 2009 AC Tune-Up Pilot Test † 42 units tested † Not cost-effective: average savings per unit 7 gen kWh † >80% of units were above 10 SEER † Need to target units that are operating inefficiently 24

  25. Slide 25: 2010 Residential AC Tune-Up Pilot

    2010 Residential AC Tune-Up Pilot ƒ Third attempt ƒ Pilot begins spring 2010 ƒ Propose 1,000 tune-up units in 2010 ƒ Diagnostic tool allows us to measure actual energy savings and compare against estimates ƒ Targets customers with functioning AC units at least five years old 25

  26. Slide 26: AC Tune Up – How does it work?

    AC Tune Up – How does it work? ƒ HVAC contractors target customers beyond existing base. ƒ Using diagnostic tool contractor determines baseline Energy Index (EI). ƒ Contractor performs tune-up. ƒ Using diagnostic tool contractor determines tuned up Energy Index (EI). ƒ If EIpost minus EIpre >= 10 co

  27. Slide 27: AC Tune-Up Cost-Effectiveness

    AC Tune-Up Cost-Effectiveness ƒ Estimated TRC 1.04 ƒ Total Budget: $356,450 ƒ Generator kW: 252 ƒ Generator kWh: 261,226 ƒ Participants: 1,000 27

  28. Slide 28: Product Ideas from Roundtable

    Product Ideas from Roundtable ƒ Alter prescriptive rebates to better incentivize maximum kWh savings – Lance Powers ƒ Eliminate 60% Project Cost Cap – Lance Powers ƒ Increase targeted incentives for sites with high savings potential – Lance Powers ƒ School and Government Segmentation – CLEAResult Co

  29. Slide 29: Potential New Products for 2011 Plan

    Potential New Products for 2011 Plan ƒ Commercial Advanced Evaporative Cooling (prescriptive) ƒ Commercial Ground Source Heat Pump Systems (prescriptive) ƒ Residential Ground Source Heat Pump Systems (prescriptive) ƒ Residential Energy Feedback Behavior Pilot ƒ Residential Water Heater Heat Pump 29

  30. Slide 30: Recommendations from Program Evaluations

    Recommendations from Program Evaluations Presented by: Heather Hemphill Karen Rhodes Peter Narog Lisa Mahoney

  31. Slide 31: Market Research Updates

    Market Research Updates 2009 Program Evaluations † Four Evaluations: Home Lighting, Saver's Switch, New Construction, and Cooling Efficiency. † Studies near completion; † Share recommendations with you today. 2010 Program Evaluations † Evaluations: Evaporative Cooling Rebates, Motor & Drive Efficien

  32. Slide 32: Recommendations: Home Lighting & Recycling

    Recommendations: Home Lighting & Recycling ƒ Program Features & Marketing † Consider year-round program with select partners † Provide more education to consumers † Program administrators need to engage partners † Support WECC’s plan for an additional field rep † Provide more marketing materials to

  33. Slide 33: Recommendations: Home Lighting & Recycling

    Recommendations: Home Lighting & Recycling ƒ Program Design † Expand participation with select partners † Offer a wider variety of package sizes † Focus on specialty CFLs † Create a long-term plan to account for changing standards † Consider alternative incentive strategies † Develop a segmented mar

  34. Slide 34: Recommendations: Saver's Switch

    Recommendations: Saver’s Switch Administration ‰ Continue the high-quality program delivery. Marketing and Outreach ‰ Provide participants with additional contact and enhanced program information. ‰ Continue efforts to build relationships with HVAC contractors. ‰ Refine and clarify marketing materia

  35. Slide 35: Recommendations: New Construction

    Recommendations: New Construction ƒ Program Processes † Streamline the application process to expedite the review † Clearly identify support provided for LEED or other green certification programs in promotion/marketing materials 35

  36. Slide 36: Recommendations: New Construction

    Recommendations: New Construction ƒ Marketing and Outreach † Separate education and awareness goals by developing materials, website content, and outreach presentations specific to owners, and another set for architects/engineers † Expand outreach and marketing to architects, contractors, and engine

  37. Slide 37: Recommendations: New Construction

    Recommendations: New Construction ƒ Implement Benchmarking and Best Practices † Consider establishment and tracking of market transformation metrics † For Colorado, use learning from other state Xcel Energy program, and from other utilities with similar programs † Leverage existing program benchmark

  38. Slide 38: Recommendations: Cooling Efficiency

    Recommendations: Cooling Efficiency Administration † Communicate program information to staff and trade allies † Additional Trade Relations Manager resources † Assess internal staff needs to support DSM programs † Provide tools and training to trade allies Marketing and Outreach † Customize tools fo

  39. Slide 39: Recommendations: Cooling Efficiency

    Recommendations: Cooling Efficiency Program Design † Revisit and prioritize target markets † Consider increasing rebate levels † Review custom processes † Engage smaller customers † Consider modifying PTAC structure † Set Net-To-Gross between 0.7 and 0.8 for 2010 (from 0.94) 39

  40. Slide 40: Open Discussion/Wrap-Up

    Open Discussion/Wrap-Up Upcoming UpcomingRoundtable RoundtableSchedule: Schedule: Q2: Q2:May May13, 13,2010 2010 Q3: Q3:August August2010 2010 Q4: Q4:November November2010 2010