Regent Pacific Group Limited · HKEX:575

Regent Pacific — H1 2007 Earnings Presentation

58 slides from Regent Pacific's earnings presentation, Dec 14, 2006

  1. Slide 1: Regent Pacific Group Limited Interim Report for Six Months Ended 30 September 2006

    Regent Pacific Group Limited Interim Report for Six Months Ended 30 September 2006 14 December 2006

  2. Slide 2: Financial Highlights – Regent Pacific Group

    Financial Highlights – Regent Pacific Group • Net profit of US$2.53m • EPS of 0.18 US cents per share • Shareholders equity of US$19.34m, 47% increase from 31 March 06 • Net Finance costs of US$1.3m • Cash balance of US$6.9m at 30 November 2006

  3. Slide 3: Financial Highlights – Regent Pacific Group

    Financial Highlights – Regent Pacific Group • Outstanding CBs and RCPS of US$22.95m • Undiluted share capital of 1,467,687,324 and fully diluted of 2,246,839,023 shares • Market capitalisation of US$61.2m at 11 December 2006 • No forward sales of any commodity

  4. Slide 4: Financial Highlights – Simao Shanshui Copper JV Company

    Financial Highlights – Simao Shanshui Copper JV Company • Net profit of US$7.4m • Shareholders equity of US$58m • Cash balance of US$4.3m • No borrowings or hedging of any commodity or currency • Ore production of 12,642 tonnes • 2,109 tonnes of contained Copper in Concentrate sold • Cash cost US$0.

  5. Slide 5: Environmental, Health & Safety

    Environmental, Health & Safety • Completed needs analysis • Committed to International Best Practice Standards • Appointed Environmental Resources Management for completing Mine wide EHS plan & training • Appointed SRK and ENFI for upgrading tailings disposal, waste dump and wastewater management pl

  6. Slide 6: Markets Remain Strong - Copper

    Markets Remain Strong - Copper • Copper prices driven by best-ever fundamentals • Inventories to remain at record lows for next 2 ~ 3 years • Expected ongoing market deficits in 2007 and 2008 • Supply side problems remain endemic; more losses expected • Sharply higher Chinese demand in 4Q; expected

  7. Slide 7: Markets Remain Strong - Zinc

    Markets Remain Strong - Zinc • Plunging LME Stocks have underpinned Zinc at over US$2.00/lb • Deficit forecast for next 18 months, stocks to reach record lows of 1.3 weeks in 2007 • Extremely tight market • Risk of higher-than-expected Chinese mine production has tempered the outlook • MS price fore

  8. Slide 8: Consultants – Blue Chip Firms

    Consultants – Blue Chip Firms Committed to using Blue Chip Firms for assisting on optimisation programme Resource Estimation : Cube Consulting Mine Engineering : Cube Consulting Geotechnical : Steffen Robertson and Kirsten (SRK) Environmental : Environmental Resources Management (ERM) Legal : Linkla

  9. Slide 9: Exploration Focus

    Exploration Focus • Strategic focus on exploration equals strong exploration commitment • Significant budget – US$12 million • Drilling biased • Focussed target styles • Total landholding over 157 sq km

  10. Slide 10: Dapingzhang – Exploration Licence Area

    Dapingzhang – Exploration Licence Area 100 sq km DPZ area EL/ML Permits DPZ EL (31.25Km2) DPZ EL DPZ EL (16.22Km2) (9.89Km2) DPZ ML DPZ EL (2.75Km2) (7.5Km2) DPZ EL (3.8Km2) Regent Minerals EL DPZ EL Oxiana Rixin EL (36.41Km2) (36.02Km2) (21.1Km2) JD EL (77.62Km2)

  11. Slide 11: Exploration – Current Mineral Resources (JORC Code)

    Exploration – Current Mineral Resources (JORC Code) • Mineral resources 26.5m tonnes at 0.82% Cu at Sept 2006 • 18.6m tonnes Indicated & 7.9m tonnes Inferred • 216kt Copper • 150kt Zinc • 230kOz Gold • 8,334kOz Silver

  12. Slide 12: Exploration – Current Mineral Resources (cont’d)

    Exploration – Current Mineral Resources (cont’d) • Updated JORC Code mineral resources scheduled for March 2007 • Drilling continues to confirm the potential for significant additional Copper and Zinc resources and to extend mine life beyond 7 yrs • Additional mineral resources will be added as dril

  13. Slide 13: Mineral Resource Statement as at 31 August 2006

    Exploration – Current Mineral Resources (cont’d) Mineral Resource Statement as at 31 August 2006 (JORC Code Compliant) Indicated Resource Inferred Resource Copper Zinc Gold Silver Lead Copper Zinc Gold Silver Lead Tonnes Tonnes Grade Grade Grade Grade Grade Grade Grade Grade Grade Grade (mt) (mt) (%

  14. Slide 14: Exploration (cont’d)

    Exploration (cont’d) • In-fill drilling returned a number of significant massive sulphide (V1) intercepts DH6810, 17.08 meters at 4.94% copper and 2.52% zinc at Dapingzhang DH1905, 12.7 meters at 0.42% copper and 11.11% zinc at Dawaz • 9 operating rigs Period Metres Drilled 30th November 2006 47,618

  15. Slide 15: Exploration – Yinzishan JV Property – 90.5% Ownership

    Exploration – Yinzishan JV Property – 90.5% Ownership • Completed geological mapping of the underground workings • Started geophysical surveys of a 2.5 sq km area to identify and prioritise drill targets • Anomalies identified • Landholding of 57 sq km

  16. Slide 16: Drill Hole Assay Highlights – Q3

    Drill Hole Assay Highlights – Q3 Drill Hole From (m) To (m) Interval (m) Copper (%) Zinc (%) Gold (g/t) Silver (g/t) Dapingzhang DH6810 168.61 185.69 17.08 4.94 2.52 1.12 26.41 DH021 102.94 118.00 15.06 2.30 6.90 1.00 67.60 DH241 91.50 115.40 23.90 1.69 2.00 1.45 50.76 DH009 97.64 106.20 8.56 1.15 7

  17. Slide 17: Dapingzhang Plan – Mineralization with Potential to add Significant Resources

    Dapingzhang Plan – Mineralization with Potential to add Significant Resources and to Extend Mine Life

  18. Slide 18: Dapingzhang Mine – DPZ Massive Sulphide Area

    Dapingzhang Mine – DPZ Massive Sulphide Area

  19. Slide 19: Dapingzhang Mine – DPZ Massive Sulphide Area

    Dapingzhang Mine – DPZ Massive Sulphide Area

  20. Slide 20: Dapingzhang Mine – DWZ Massive Sulphide Area

    Dapingzhang Mine – DWZ Massive Sulphide Area

  21. Slide 21: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North Ore Massive (V1) – yellow Disseminated (V2) - red

  22. Slide 22: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North Topography and Ore V1 - yellow, V2 - red

  23. Slide 23: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North Pit 1B and Ore Massive (V1) – yellow Disseminated (V2) - red Pit 1

  24. Slide 24: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North Pit 2 and Ore V1 - yellow, V2 - red Pit 1 Pit 2

  25. Slide 25: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North Pit 3 and Ore V1 - yellow, V2 - red Pit 1 Pit 3 Pit 2

  26. Slide 26: Dapingzhang Mine – Looking North

    Dapingzhang Mine – Looking North All Dapingzhang Pits and Ore V1 - yellow, V2 - red Dawaz Pit (V1 only) Cu 0.7%, Zn 10% (est)

  27. Slide 27: Dapingzhang Mine – Looking South

    Dapingzhang Mine – Looking South

  28. Slide 28: Dapingzhang Mine

    Dapingzhang Mine • Open Pit Mine • Currently milling capacity for V2 ore 2,100 ~ 2,500 tpd • Or V1 milling capacity of 2,600 tpd • Tailings dam adequate for existing mine life • Infrastructure in place (water -1,300m3) and power (35,000 KV) • Upgrading power to 110kV in 2007

  29. Slide 29: Staged Operational Plan

    Staged Operational Plan Current Future Stated Processing capacity (tpd) 2,200 ~ 2,500 2,600 ~ 10,600* Concentrate Grade >20% (V2) >18% (V1) Recovery >90% In-fill drilling >80% Optimization Flotation Circuit Single concentrate Program Cu & Zn concentrates Potential Expansion Smelter penalties Low Low

  30. Slide 30: Process Plant Improvements

    Process Plant Improvements Objectives to process massive sulphide ore (V1) into separate Copper and Zinc concentrates and increase throughput • Lab met test work completed on V1 ore Copper con: 86.2% recovery, 19.5% grade, 5.2% Zinc content Zinc con: 76.3% recovery, 41% grade, 1.3% Copper content •

  31. Slide 31: Mine Development

    Mine Development • Completed preliminary mine plan for 2007 • Exploit V1 ore (easily accessible by open pit) • Complete final mine plan in May 2007 • Upgrade tailings dam to withstand seismic activity and waste dumps to guard against potential acid mine run off • Implement comprehensive mine wide EH

  32. Slide 32: Preliminary Mine Plan 2007

    Preliminary Mine Plan 2007 2007E Total Ore (mt) 1.1 Copper Grade (%) 1.39% Zinc Grade (%) 6.03% Total Waste (mt) 34.0 Total Tonnes (mt) 35.1 Strip Ratio (w:o tonnes) 29.8:1* Note: Preliminary Mine Plan 2007 prepared by Cube Consulting Pty Ltd - December 2006 - * Preliminary LOM stripping ratio is 7.

  33. Slide 33: Mine Development

    Mine Development • Exploit V1 ore (easily accessible by open pit) • Complete updated mine design in May 2007 • Upgrade tailings dam to withstand seismic activity and waste dumps to guard against potential acid mine runoff • Implement comprehensive mine wide EH & S plan

  34. Slide 34: Infrastructure Studies – Immediate Objectives

    Infrastructure Studies – Immediate Objectives • Complete feasibility study for plant expansion - 8,000 tpd concentrator expansion = total concentrator capacity of 10,600 tpd • Upgrading tailings dam and waste dump (SRK and ENFI appointed) • Construction has commenced on the return water system and u

  35. Slide 35: Long Term Objectives

    Long Term Objectives Our Long term objectives are: • Improve profitability by processing V1 ore in 2007 = significant uplift in cash-flow • Aggresssive drilling to add significant resources • Maximise conversion of resources into reserves • Focus on regional exploration for discovering new VMS depos

  36. Slide 36: Immediate Risks

    Immediate Risks • Relocation of DPZ and Dawaz Hamlets • Successful completion of pilot plant results on V1 ore • Interruptions to waste stripping plan (9.6m bcm in 07) • Upgrading of tailings dam and waste dumps • Sensitivity to Commodity Prices

  37. Slide 37: Mill Infrastructure

    Mill Infrastructure No.3 Mill Plant 500 tpd No.2 Mill Plant 500 tpd Tailings Dam Capacity 16m tonnes No.4 Mill Plant 2,000 tpd

  38. Slide 38: Mill Infrastructure

    Mill Infrastructure No.4 mill plant - 2,000 tpd No.3 mill plant - 500 tpd No.4 mill plant - 2,000 tpd No.2 mill plant - 500 tpd

  39. Slide 39: Mine Infrastructure

    Mine Infrastructure DPZ Mine substation Voltage: 35,000KV Transformer: 6,300KVA Output: 10KV Upgraded in May & June 2006 Water pond (1,300m3) Lift: 360m Pipeline: 4500m DPZ Village Pipe diameter: 273mm Flow rate: 450m3/per hour Water pump motor: 712kw (two stage pump station)

  40. Slide 40: Geology

    Geology 8.32% Cu 4.30% Cu 1.33% Cu Vein and Disseminated Massive Sulphide Sulphide V1 sample from Sample from section V2 sample from section 8, Pit No.2 10, Pit No.2 section 16, Pit No.1

  41. Slide 41: Dapingzhang – Potential for Value

    Dapingzhang – Potential for Value Dapingzhang (estimated) Source: Queen’s University study, Kingston, Canada (Feb 2005)

  42. Slide 42: Sino Foreign Equity Joint Venture

    Sino Foreign Equity Joint Venture Joint Venture Company Name: Yunnan Simao Shanshui Copper Company Limited – YSSC, a Sino-foreign equity joint venture company incorporated in the PRC. Parties: Regent Metals Limited – RML, incorporated in Barbados, an indirect wholly-owned subsidiary of Regent Pacifi

  43. Slide 43: Sino Foreign Equity Joint Venture

    Sino Foreign Equity Joint Venture Yunnan Simao Shanshui Copper Company Limited Regent Pacific Group Limited (Cayman) 100% Regent Metals Yunnan Copper Holdings Limited Group (BVI) 100% Regent Metals Jersey Limited (private) 100% Regent Metals Yuxi Resources Simao Shanshui Limited Corporation Minerals

  44. Slide 44: Sino Foreign Equity Joint Venture

    Sino Foreign Equity Joint Venture Board of Directors: 9 Directors – YUXI appointed 4, RML appointed 3 and SSM appointed 2 Chairman appointed by SSM and two Vice Chairman, one appointed each by RML and YUXI Management: General Manager appointed by YUXI and two Deputy General Managers appointed, one e

  45. Slide 45: Sino Foreign Equity Joint Venture

    Sino Foreign Equity Joint Venture Total investment amount and registered capital of YSSC: RMB 400 million (US$49.4M) has been contributed to JV Co as follows: Cash Capital Contribution Equity Interest YUXI RMB 200 million (US$24.7M) 50% RML RMB 160 million (US$19.8M) 40% SSM RMB 40 million (US$4.9M)

  46. Slide 46: Sino Foreign Equity Joint Venture

    Sino Foreign Equity Joint Venture Dividend Policy: 40% of the distributable profits annually (or semi annually if agreed between the joint venture parties) Off-Take Agreement: Jingyi pays a profit share (PS) of >84% of Shanghai Futures Exchange (SHFE) price for Copper at 25% Copper Grade and PS will

  47. Slide 47: Disclaimer

    Disclaimer The information contained in this presentation has been prepared using the information available to Regent Pacific Group Limited (“Regent”) at the time of preparation and may not include all relevant information regarding Regent or Yunnan Simao Shanshui Copper Company Limited (“Yunnan Sim

  48. Slide 48: Disclaimer

    Disclaimer These materials are highly confidential, are being given solely for your information and for your use and may not be copied, reproduced or redistributed to any other person in any manner. Accordingly, you agree to keep the contents of this presentation and these materials strictly confide

  49. Slide 49: Appendix

    Appendix

  50. Slide 50: Summary Copper Supply/Demand Balance: Critically Low Stocks Ahead in 2007-08

    Summary Copper Supply/Demand Balance: Critically Low Stocks Ahead in 2007-08 ('000 t) 2004 2005 2006e 2007e 2008e 2009e World Refined Production 15,928 16,668 17,475 18,337 19,260 20,398 % change 4.2% 4.6% 4.8% 4.9% 5.0% 5.9% World Consumption 16,954 16,904 17,586 18,445 19,289 20,170 % change 9.3%

  51. Slide 51: Exchange Stocks Have Started to Decline Again

    Exchange Stocks Have Started to decline Again and Could Re-Test the 2005 Lows by Year-End Shanghai Metals Exchange LME Comex LME Cash Copper Price 1,800 4.00 1,600 3.50 1,400 3.00 LME Cash Copper (US$/lb) 1,200 2.50 Stocks ('000t) 1,000 2.00 800 1.50 600 1.00 400 200 0.50 0 0.00 Jan-06 Jul-05 Jul-06

  52. Slide 52: Shanghai Premium/(Discount) to LME Copper

    Shanghai Premium/(Discount) to LME Copper Price* 20 Shanghai Premium/ (Discount) to LME Copper (%) 15 Shanghai Premium 10 5 0 (5) Shanghai Discount (10) (15) May-06 Jul-06 Sep-06 Nov-06 May-04 Mar-06 May-05 Nov-04 Jul-04 Jul-05 Nov-03 Mar-04 Sep-04 Sep-05 Nov-05 Mar-05 Jan-04 Jan-05 Jan-06 *LME Copp

  53. Slide 53: Copper Stocks-Consumption Ratio at Record Lows

    Copper Stocks-Consumption Ratio* at Record Lows 14 400 Stocks-consumption ratio LME cash copper Global stocks-consumption ratio (weeks) 350 12 Spot Price US$3.19/lb 300 LME cash copper (USc/lb) 10 250 8 200 6 150 4 100 2 50 0 0 2003 2004 2005 2006 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 20

  54. Slide 54: Pinch-Point Charts Show Near-Vertical Relationship Between Prices and Stocks

    Pinch-Point Charts Shows Near-Vertical Relationship Between Prices and Stocks* 400 350 Near-vertical price move LME Cash Price (US cents/lb) 300 250 200 150 100 50 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Stock/Consumption ratio (weeks demand) *Based on total reported stocks (consumer, prod

  55. Slide 55: Summary Zinc Supply/Demand Balance, 2004-2009e

    Summary Zinc Supply/Demand Balance, 2004-2009e ('000 t) 2004 2005 2006e 2007e 2008e 2009e World Refined Production 10,239 10,315 10,685 11,463 12,229 12,637 % chg 4.0 0.7 3.6 7.3 6.7 3.3 US Stockpile Sales 32 30 35 8 - - World Consumption 10,341 10,650 11,117 11,589 12,092 12,564 % chg 6.8 3.0 4.4 4

  56. Slide 56: LME Stocks Continue to Decline Very Sharply

    LME Stocks Continue to Decline Very Sharply Producer Stocks Consumer Stocks LME Stocks LME Cash Zinc Price (USc/lb) 1,800 180 1,600 160 1,400 140 1,200 120 Zinc Price (USc/lb) Stocks ('000t) 1,000 100 800 80 600 60 400 40 200 20 0 0 2004 2005 2006 1992 1993 1994 1995 1996 1997 1998 2000 2001 2002 20

  57. Slide 57: Stocks-Consumption Ratio Already at Record Low of 2.5 Weeks

    Stocks-Consumption Ratio Already at Record Low of 2.5 Weeks 14 Stocks/Consumption (weeks) Nominal Price (USc/lb, RHS) 160 Spot Price US$1.48/lb 140 12 Stocks-consumption ratio (weeks) 120 10 LME zinc price (USc/lb) 100 8 80 6 60 4 40 2 20 0 0 2003 2004 2005 2006 1980 1982 1983 1984 1985 1986 1987 19

  58. Slide 58: Pinch-Point Charts Show Extremely Low Current Stocks

    Pinch-Point Charts Shows Extremely Low Current Stocks Relative to Last 25 Years 150 140 3Q06 Position Zinc price (USc/lb, 2005 real terms) 130 120 110 100 90 80 70 60 50 40 30 2 4 6 8 10 12 14 Weeks of inventory Note: quarterly average prices shown; stockpiles include consumer, producer, merchant an

Regent Pacific Group — H1 2007 Earnings Presentation on 6ix