Melbana Energy Limited · ASX:MAY

Melbana Energy — MEO Australia — Investor Presentation (July 2008)

5 slides from Melbana Energy's investor presentation, July 2008

  1. Slide 1: Investor Presentation

    Presentation Disclaimer This presentation contains includes certain forward- forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward- forward-looking statements are, however, subject to risks, uncertainties and assumptions th

  2. Slide 2: Major undeveloped gas province

    Major undeveloped gas province Commercial drivers • Dirty gas (CO2 challenged) • Dry gas (low gas liquids) • Distance from shore • Disputed territorial waters MEO’ MEO’s solution • Convert CO2 rich gas to methanol • Low cost development – Pre- Pre-fabricate in SE Asia – Pre- Pre-commission – Tow to

  3. Slide 3: Tassie Shoal - the future hub

    Tassie Shoal - the future hub Approved GTL Projects • Tassie Shoal Methanol Project – 2 x 1.75 Mtpa • Timor Sea LNG Project – 3 Mtpa • 50 year environmental approvals secured in 2004 (EPBC Act) • Non- Non-disputed Australian waters • Rapid commercialization path • Open to 3rd party gas supplies MEO

  4. Slide 4: Zeus Stratigraphic Play – Multi Tcf; Conclusions

    Zeus Stratigraphic Play – Multi Tcf WA361P Perseus Drilling in October 2008 utilizing Songa Venus semi MEO Australia energy for the future MEO Australia Limited Conclusions • Strategic alliance with RDI* – Covers all permit areas – Timor Sea undertakings contingent upon IPO of RDI late’ late’08 • ME

  5. Slide 5: Contact details

    Contact details MEO Australia Limited Level 17, 500 Collins Street Melbourne 3000 Australia Ph: +61 3 9614 0430 Fax: +61 3 9614 0660 Email: admin@meoaustralia.com.au www.meoaustralia.com.au MEO Australia energy for the future MEO Australia Limited 5

MEO Australia — Investor Presentation (July 2008) on 6ix