Forward-Looking Statements This Presentation contains forward-looking statements (including without limitation statements containing words such as "will," "believes," "expects," “anticipates,” "plans" or other similar expressions). These forward-looking statements may include statements relating to
Slide 3: NuScale's Readiness Position at a Glance
NuScale’s Readiness Position at a Glance Small Modular Reactor Competitors1 Activity Progress Other Light Water Reactors Non-Light Water Reactors2 Standard Design Approval in 2020 U.S. Nuclear Regulatory Commission Design Certification in 2023 None None (NRC) Design Approval Second Standard De
Slide 4: Doosan First Article Agreement
Doosan First Article Agreement Progression from development to production Doosan Enerbility and • NuScale signed agreement with Doosan NuScale Power leadership at Enerbility to fabricate the most complex signing ceremony at Doosan Enerbility headquarters in NPM components – the upper reactor Changwo
Slide 5: Robust and Mature Supply Chain
Robust and Mature Supply Chain Doosan Doosan Paragon Framatome NuScale Power ModulesTM Fuel Assemblies Control Systems Module Protection System Sensors and Instrumentation Reactor Building Crane All images provided by supply chain vendors and used with permission. NuScale Nonproprietary | Copyright
Slide 6: Commercial Update
Commercial Update NuScale and Doosan signed agreement to secure fabrication of upper reactor coolant system for the NPM at Doosan's production facility, moving the collaboration from preparation into production of the First Article. NuScale’s exclusive global strategic partner, ENTRA1 Energy (ENTRA1