Atlantic Sapphire Asa — Investor Presentation (March 2025)

9 slides from Atlantic Sapphire Asa's investor presentation, March 2025

  1. Slide 1: Company Presentation

    Company Presentation March 2025 insert image

  2. Slide 2: Atlantic Sapphire Timeline

    Atlantic Sapphire Timeline STAGE 1 STAGE 2 STAGE 3 Company Foundation, Making Phase 1 Phase 2 Construction & Efficient Commissioning of Phase 1 New Organization Total Production o Stage 2A Target o Stage 2B o Capacity: 25.000 Harvest Average Maximized Tons HOG Weights to production Realize Premium c

  3. Slide 3: Company Foundation & Construction of Phase 1

    STAGE 1 BACK IN TIME Company Foundation & ✓ Construction of Phase 1 Starting with probably one of the most innovative solutions in worldwide salmon farming, the process was complex. o The first stage was the construction and commissioning - a startup, of the first significant land-based salmon farm

  4. Slide 4: Making Phase 1 Efficient

    STAGE 2 This stage finished in the second half of 2024 with an Making Phase 1 Efficient organizational restructuring process that together with an experienced board, founded the bases for reaching profitability and value creation. Producing Superior Salmon in Quality and Avg Weights First Steps o Ne

  5. Slide 5: Making Phase 1 Efficient: Action Plan

    STAGE 2 Making Phase 1 Efficient *ACTION PLAN o New production organization separating the technical operation from production o Systematic Reporting Structure IMPLEMENTED AND o Fish & Biology FIRST! UNDER People o Building Confidence in the organization People IMPEMENTATION o Full overhauling under

  6. Slide 6: Producing Premium Salmon at Targeted Harvest Weights

    STAGE 2A Producing Premium Salmon at Targeted Harvest Weights

  7. Slide 7: Removing Bottlenecks to Maximize Production Capacity > 8000 tons HOG

    STAGE 2B Removing Bottlenecks to Maximize Production Capacity > 8000 tons HOG Annual production volume (tons HOG) P3000 project - remove bottlenecks in P3000 to improve volumes o Improved mechanical filter efficiency o Improved CO2 removal rate o Increased skimmer capacity o Increased water flow (ex

  8. Slide 8: Phase 2

    STAGE 3 Phase 2 Phase 2 design is built on knowledge and experience from Phase 1 – with a totally different design o Separate chiller plant with high capacity and efficiency o Increased capacity on CO2 removal o Significantly increased skimmer capacity o Redundancies for all critical components o N+

  9. Slide 9: Atlantic Sapphire

    ATLANTIC SAPPHIRE.