Lion Energy Limited · ASX:LIO
Lion Energy — Investor Presentation (November 2026)
23 slides from Lion Energy's investor presentation, Nov 16, 2026

Slide 1: High-impact oil exploration in Seram Island, Indonesia
Seram Island rsonal use only High-impact oil exploration in Seram Island Indonesia Bula Karang-1, 12.4 mmbbl P501 Lion interest 45% Webinar - 16 November 2026 Bula Karang-1 currently drilling

Slide 2: Important notice and disclaimer
Important notice and disclaimer Forward-looking statements Certain statements contained in this presentation, including information as to the future financial or operating performance of Lion and its projects are forward-looking statements. Such forward-looking statements: •should or can generally b

Slide 3: Investment highlights
Investment highlights East Seram PSC rsonal use only Lion is now drilling the 12 mmbbl1 (P501) oil Bula Karang prospect in the Largely funded by partner highly prospective Bula Bay, Seram Basin, East Indonesia and will retain a Lion's partner, Overseas Petroleum and Investment Corp (Opic), will fund

Slide 4: The Seram Basin is underexplored adjacent to major hydrocarbon provinces
The Seram Basin is underexplored adjacent to major hydrocarbon provinces rsonal use only 4

Slide 5: East Seram PSC
East Seram PSC Location Seram Island, Indonesia rsonal use only Contract The PSC has a fixed 30-year term from 2018 , divided into: • Exploration Period: 6 years initially, now extended to 10 years • Exploitation Period: 20 years begins once the first Plan of Development is approved by the Minister

Slide 6: East Seram PSC area and high graded prospects
East Seram PSC area and high graded prospects Progress Since PSC signing (July 17, 2018), focused exploration effort has resulted in a world-class portfolio identified by 2020 offshore and 2022 onshore seismic campaigns. rsonal use only High Graded Prospects East Seram PSC High P50 Prospective Est.

Slide 7: Lion acreage has world-class fold belt structures and Plio-Pleistocene play
Lion acreage has world-class fold belt structures, exciting Plio-Pleistocene play, abundant evidence of HC charge on & offshore rsonal use only Fold-thrust belt play: Jurassic age fracture massive Manusela Plio-Pleistocene Play: Fufa Fm shallow marine sandstone, carbonate objective (up to 2000m thic

Slide 8: Oil seeps in East Seram Bula area led to discovery of Bula Field
Oil seeps in East Seram Bula area led to discovery of 20mmbbl shallow Bula Field rsonal use only Photos from Bula Karang-1 Lion field trips to East Seram Bula town area seeps Oil staining in limestone in Neif Gorge area Neif Gorge area seeps Neif Gorge area seep Price et al, 1987 8

Slide 9: Bula Karang Prospect Summary
Bula Karang Prospect Summary – Late Tertiary reefal buildups major play in SE Asia Prospect summary Resource Volumes • Primary objective buried Late Tertiary age reef – only ~2km from 20mmbbl Bula field Prospective resource1 unrisked (100%) Carbonate: • Up to 2.7 sq km and 80m closure •Oil/cond (mmb

Slide 10: Bula Karang Prospect emerged from Lion's 2020 seismic
Bula Karang Prospect emerged from Lion’s 2020 seismic Example of CP97 data vs BLM20 data in Bula Bay area Lines overlap – significantly more stratigraphic information on BLM20 line 1997 vintage line 2020 BLM20 line rsonal use only Possible to see carbonate build up in hindsight Clear Interpreted car

Slide 11: Bula Karang Prospect – expected stratigraphy and drilling plan
Bula Karang Prospect – expected stratigraphy and drilling plan rsonal use only Exploration Targets Drilling will progress through shallow marine sandstone reservoirs, continue into the Fufa Formation, test deeper turbidite sandstone targets, and ultimately evaluate potential oil-bearing reefal limes

Slide 12: Bula Karang-1 Update
Bula Karang-1 Update Bula Karang-1 Prognosed BK-1 Time Depth Curve Days 0 5 10 15 20 25 0 rsonal use only 13 3/8" casing Anoa-6 @ ~560ft MD 1,000 Current Status Oil shows 12 ¼”hole • Changing bottom hole assembly @1300ft MD as per program Secondary objective evaluation Well currently • Well trajecto

Slide 13: Legacy AGL map of Bula Air Field
Legacy AGL map of Bula Air Field ~550,000 bbl produced from 1989 to early 2000’s when field shut-in, offshore extension is untested 8S-18B rsonal use only Approx BK-1 penetration of pay interval. Elevated gas (up to 75 units) and interpreted overall weak oil shows, evaluation ongoing. BK-1 location

Slide 14: Bula Karang success leads to a material Bula Bay development pathway
Bula Karang success leads to a material Bula Bay development pathway Transformational Upside A successful outcome could unlock ~50 mmbbl potential in Bula Bay establishing a new offshore oil Reef target play leveraging existing infrastructure for rapid, low- rsonal use only cost commercialization. S

Slide 15: Bula Karang prospect – infrastructure advantage
Bula Karang prospect – infrastructure advantage Capital savings By drilling a deviated well from onshore, the prospect can be accessed at an estimated cost of only ~US$6.7 million. Well planning confirms rsonal use only drilling a deviated well from shore, reduces costs by around USD 5 million. Pote

Slide 16: Project Schedule – Current Status
Project Schedule – Current Status Currently in Drilling Timeline middle of drilling rsonal use only Apr ‘26 May ‘26 Jun ‘26 Jul ‘26 Aug ‘26 Sep ‘26 Oct ‘26 Nov ‘26 Dec ‘26 Jan ‘27 Feb ‘27 Mar ‘27 Road & Site Preparation Road & Site Preparation Jetty Permit Jetty Permit Drilling Rig Mobilization Dril

Slide 17: Success of BK-1 allows drilling of giant Kobi fold-belt prospect
Succes of BK-1 allows drilling of giant Kobi fold-belt prospect 100 km2+ prospect ~15km NW of 1.5 TCF Lofin gas/condensate field PSDM generated Manusela depth map rsonal use only Planned Kobi-1 5 km Prospect summary • Closure of over 100 km2 (PSDM depth map) • Top Manusela ~2800mss (~1000m shallower

Slide 18: Indonesian energy demand outpaces domestic energy supply
Indonesian energy demand outpaces domestic energy supply, energy security now prevails rsonal use only Demand growth Supply growth Oil is critical Final energy consumption grew at Primary energy supply grew at Oil still supplied 31% of primary 5.0% p.a. over the decade to 2023, 4.0% p.a. one percent

Slide 19: Indonesia's oil deficit is structural, not cyclical
Indonesia's oil deficit is structural, not cyclical Demand and domestic supply rsonal use only 1.6m 0.6m -1.0m Imports fill the current oil demand, 2025 oil production, Indicative daily supply supply gap barrels/day barrels/day gap in barrels/day Why the gap persists 1996 2003 Mature fields New disc

Slide 20: Development drilling can slow decline, but cannot replace exploration
Development drilling can slow decline, but cannot replace exploration. Faster approvals driving activity. rsonal use only Mature fields Exploration gap Lion's opportunity Oil output peaked in 1996. Exploration is recovering, yet As majors rationalise portfolios Intensive development drilling investm

Slide 21: Technical Expertise
Technical Expertise Chris Newton Russell Brimage Non-Executive Director, Technical Consultant Non-Executive Director • Geologist by background with 40 years of E&P • 40 years’ operating experience in the E&P and rsonal use only industry experience in technical, commercial, & service sector leadershi

Slide 22: Why Lion — why now
Why Lion — why now Retained exposure Lion’s 45% retained interest gives rsonal use only investors significant exposure to potential material gains and world- class follow up potential Value Catalyst Resilient Returns Bula Karang-1 is a near-term Existing infrastructure supports a exploration catalys

Slide 23: Appendix - East Seram PSC Prospective Resources
Appendix 1 - East Seram PSC Prospective Resources East Seram PSC Prospective 100% (Gross) Resources 1 Play Gas/Associated Gas Oil/Condensate Combined (Mmboe) Probability (as at 1 Oct 2025) Recoverable (Bcf) Recoverable (MMbbl) of Success Low Best High Low Best High Low Best High Prospective Resource
Source: ASX announcement, Nov 16, 2026
More decks from Lion Energy Limited
RIU Good Oil Conference 202619 slides · Sep 16, 2026
Investor Presentation (January 2026)23 slides · Jan 16, 2026
Investor Presentation (August 2024)8 slides · Aug 29, 2024
Peak Microcap Investor update July 202319 slides · Jul 13, 2023
Investor Presentation (April 2023)27 slides · Apr 20, 2023
Corporate Update (April 2023)21 slides · April 2023