Lion Energy Limited · ASX:LIO

Lion Energy — Investor Presentation (November 2026)

23 slides from Lion Energy's investor presentation, Nov 16, 2026

  1. Slide 1: High-impact oil exploration in Seram Island, Indonesia

    Slide 1: High-impact oil exploration in Seram Island, Indonesia

    Seram Island rsonal use only High-impact oil exploration in Seram Island Indonesia Bula Karang-1, 12.4 mmbbl P501 Lion interest 45% Webinar - 16 November 2026 Bula Karang-1 currently drilling

  2. Slide 2: Important notice and disclaimer

    Slide 2: Important notice and disclaimer

    Important notice and disclaimer Forward-looking statements Certain statements contained in this presentation, including information as to the future financial or operating performance of Lion and its projects are forward-looking statements. Such forward-looking statements: •should or can generally b

  3. Slide 3: Investment highlights

    Slide 3: Investment highlights

    Investment highlights East Seram PSC rsonal use only Lion is now drilling the 12 mmbbl1 (P501) oil Bula Karang prospect in the Largely funded by partner highly prospective Bula Bay, Seram Basin, East Indonesia and will retain a Lion's partner, Overseas Petroleum and Investment Corp (Opic), will fund

  4. Slide 4: The Seram Basin is underexplored adjacent to major hydrocarbon provinces

    Slide 4: The Seram Basin is underexplored adjacent to major hydrocarbon provinces

    The Seram Basin is underexplored adjacent to major hydrocarbon provinces rsonal use only 4

  5. Slide 5: East Seram PSC

    Slide 5: East Seram PSC

    East Seram PSC Location Seram Island, Indonesia rsonal use only Contract The PSC has a fixed 30-year term from 2018 , divided into: • Exploration Period: 6 years initially, now extended to 10 years • Exploitation Period: 20 years begins once the first Plan of Development is approved by the Minister

  6. Slide 6: East Seram PSC area and high graded prospects

    Slide 6: East Seram PSC area and high graded prospects

    East Seram PSC area and high graded prospects Progress Since PSC signing (July 17, 2018), focused exploration effort has resulted in a world-class portfolio identified by 2020 offshore and 2022 onshore seismic campaigns. rsonal use only High Graded Prospects East Seram PSC High P50 Prospective Est.

  7. Slide 7: Lion acreage has world-class fold belt structures and Plio-Pleistocene play

    Slide 7: Lion acreage has world-class fold belt structures and Plio-Pleistocene play

    Lion acreage has world-class fold belt structures, exciting Plio-Pleistocene play, abundant evidence of HC charge on & offshore rsonal use only Fold-thrust belt play: Jurassic age fracture massive Manusela Plio-Pleistocene Play: Fufa Fm shallow marine sandstone, carbonate objective (up to 2000m thic

  8. Slide 8: Oil seeps in East Seram Bula area led to discovery of Bula Field

    Slide 8: Oil seeps in East Seram Bula area led to discovery of Bula Field

    Oil seeps in East Seram Bula area led to discovery of 20mmbbl shallow Bula Field rsonal use only Photos from Bula Karang-1 Lion field trips to East Seram Bula town area seeps Oil staining in limestone in Neif Gorge area Neif Gorge area seeps Neif Gorge area seep Price et al, 1987 8

  9. Slide 9: Bula Karang Prospect Summary

    Slide 9: Bula Karang Prospect Summary

    Bula Karang Prospect Summary – Late Tertiary reefal buildups major play in SE Asia Prospect summary Resource Volumes • Primary objective buried Late Tertiary age reef – only ~2km from 20mmbbl Bula field Prospective resource1 unrisked (100%) Carbonate: • Up to 2.7 sq km and 80m closure •Oil/cond (mmb

  10. Slide 10: Bula Karang Prospect emerged from Lion's 2020 seismic

    Slide 10: Bula Karang Prospect emerged from Lion's 2020 seismic

    Bula Karang Prospect emerged from Lion’s 2020 seismic Example of CP97 data vs BLM20 data in Bula Bay area Lines overlap – significantly more stratigraphic information on BLM20 line 1997 vintage line 2020 BLM20 line rsonal use only Possible to see carbonate build up in hindsight Clear Interpreted car

  11. Slide 11: Bula Karang Prospect – expected stratigraphy and drilling plan

    Slide 11: Bula Karang Prospect – expected stratigraphy and drilling plan

    Bula Karang Prospect – expected stratigraphy and drilling plan rsonal use only Exploration Targets Drilling will progress through shallow marine sandstone reservoirs, continue into the Fufa Formation, test deeper turbidite sandstone targets, and ultimately evaluate potential oil-bearing reefal limes

  12. Slide 12: Bula Karang-1 Update

    Slide 12: Bula Karang-1 Update

    Bula Karang-1 Update Bula Karang-1 Prognosed BK-1 Time Depth Curve Days 0 5 10 15 20 25 0 rsonal use only 13 3/8" casing Anoa-6 @ ~560ft MD 1,000 Current Status Oil shows 12 ¼”hole • Changing bottom hole assembly @1300ft MD as per program Secondary objective evaluation Well currently • Well trajecto

  13. Slide 13: Legacy AGL map of Bula Air Field

    Slide 13: Legacy AGL map of Bula Air Field

    Legacy AGL map of Bula Air Field ~550,000 bbl produced from 1989 to early 2000’s when field shut-in, offshore extension is untested 8S-18B rsonal use only Approx BK-1 penetration of pay interval. Elevated gas (up to 75 units) and interpreted overall weak oil shows, evaluation ongoing. BK-1 location

  14. Slide 14: Bula Karang success leads to a material Bula Bay development pathway

    Slide 14: Bula Karang success leads to a material Bula Bay development pathway

    Bula Karang success leads to a material Bula Bay development pathway Transformational Upside A successful outcome could unlock ~50 mmbbl potential in Bula Bay establishing a new offshore oil Reef target play leveraging existing infrastructure for rapid, low- rsonal use only cost commercialization. S

  15. Slide 15: Bula Karang prospect – infrastructure advantage

    Slide 15: Bula Karang prospect – infrastructure advantage

    Bula Karang prospect – infrastructure advantage Capital savings By drilling a deviated well from onshore, the prospect can be accessed at an estimated cost of only ~US$6.7 million. Well planning confirms rsonal use only drilling a deviated well from shore, reduces costs by around USD 5 million. Pote

  16. Slide 16: Project Schedule – Current Status

    Slide 16: Project Schedule – Current Status

    Project Schedule – Current Status Currently in Drilling Timeline middle of drilling rsonal use only Apr ‘26 May ‘26 Jun ‘26 Jul ‘26 Aug ‘26 Sep ‘26 Oct ‘26 Nov ‘26 Dec ‘26 Jan ‘27 Feb ‘27 Mar ‘27 Road & Site Preparation Road & Site Preparation Jetty Permit Jetty Permit Drilling Rig Mobilization Dril

  17. Slide 17: Success of BK-1 allows drilling of giant Kobi fold-belt prospect

    Slide 17: Success of BK-1 allows drilling of giant Kobi fold-belt prospect

    Succes of BK-1 allows drilling of giant Kobi fold-belt prospect 100 km2+ prospect ~15km NW of 1.5 TCF Lofin gas/condensate field PSDM generated Manusela depth map rsonal use only Planned Kobi-1 5 km Prospect summary • Closure of over 100 km2 (PSDM depth map) • Top Manusela ~2800mss (~1000m shallower

  18. Slide 18: Indonesian energy demand outpaces domestic energy supply

    Slide 18: Indonesian energy demand outpaces domestic energy supply

    Indonesian energy demand outpaces domestic energy supply, energy security now prevails rsonal use only Demand growth Supply growth Oil is critical Final energy consumption grew at Primary energy supply grew at Oil still supplied 31% of primary 5.0% p.a. over the decade to 2023, 4.0% p.a. one percent

  19. Slide 19: Indonesia's oil deficit is structural, not cyclical

    Slide 19: Indonesia's oil deficit is structural, not cyclical

    Indonesia's oil deficit is structural, not cyclical Demand and domestic supply rsonal use only 1.6m 0.6m -1.0m Imports fill the current oil demand, 2025 oil production, Indicative daily supply supply gap barrels/day barrels/day gap in barrels/day Why the gap persists 1996 2003 Mature fields New disc

  20. Slide 20: Development drilling can slow decline, but cannot replace exploration

    Slide 20: Development drilling can slow decline, but cannot replace exploration

    Development drilling can slow decline, but cannot replace exploration. Faster approvals driving activity. rsonal use only Mature fields Exploration gap Lion's opportunity Oil output peaked in 1996. Exploration is recovering, yet As majors rationalise portfolios Intensive development drilling investm

  21. Slide 21: Technical Expertise

    Slide 21: Technical Expertise

    Technical Expertise Chris Newton Russell Brimage Non-Executive Director, Technical Consultant Non-Executive Director • Geologist by background with 40 years of E&P • 40 years’ operating experience in the E&P and rsonal use only industry experience in technical, commercial, & service sector leadershi

  22. Slide 22: Why Lion — why now

    Slide 22: Why Lion — why now

    Why Lion — why now Retained exposure Lion’s 45% retained interest gives rsonal use only investors significant exposure to potential material gains and world- class follow up potential Value Catalyst Resilient Returns Bula Karang-1 is a near-term Existing infrastructure supports a exploration catalys

  23. Slide 23: Appendix - East Seram PSC Prospective Resources

    Slide 23: Appendix - East Seram PSC Prospective Resources

    Appendix 1 - East Seram PSC Prospective Resources East Seram PSC Prospective 100% (Gross) Resources 1 Play Gas/Associated Gas Oil/Condensate Combined (Mmboe) Probability (as at 1 Oct 2025) Recoverable (Bcf) Recoverable (MMbbl) of Success Low Best High Low Best High Low Best High Prospective Resource

Source: ASX announcement, Nov 16, 2026

More decks from Lion Energy Limited

All 31 Lion Energy decks