  1. Slide 1: Rare Earths – we touch them everyday

    Lynas Corporation Rare Earths – we touch them everyday For personal use only Nicholas Curtis AM BBY Rare Earths Conference 13 March 2012

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This Presentation has been prepared by Lynas Corporation Limited (ABN 27 009 066 648) (Lynas or the Company). This Presentation contains summary information about Lynas and its subsidiaries (Lynas Group) and their activities current as at the date of this Presentatio

  3. Slide 3: Agenda

    Agenda For personal use only 1. SAFETY AND SUSTAINABILITY 2. WESTERN AUSTRALIA OPERATIONS 3. MALAYSIA OPERATIONS 4. SALES & MARKETING 5. FINANCIAL UPDATE 3

  4. Slide 4: Lynas will offer a source of supply of Rare Earths outside of China

    Lynas will offer a source of supply of Rare Earths outside of China For personal use only LYNAS VITALS AT A GLANCE VISION: Be the leader in Rare Earths for a sustainable future. EXCHANGES: ASX (code LYC), OTCQX (code LYSDY) Mount Weld INDICES: ASX 100, MSCI Australia SHARES: 1,714m on issue (1,885m

  5. Slide 5: Safety and Sustainability

    For personal use only SAFETY AND SUSTAINABILITY 5

  6. Slide 6: Lynas is a safe and sustainable source of Rare Earths supply

    Lynas is a safe and sustainable source of Rare Earths supply For personal use only STRONG SAFETY CULTURE Malaysia Operations Gas Treatment  Lynas has achieved more than 7,000,000 hours Lost Time Injury (LTI) free on the LAMP construction project  IAEA confirmed compliance of the LAMP design with i

  7. Slide 7: Western Australia Operations

    For personal use only WESTERN AUSTRALIA OPERATIONS 7

  8. Slide 8: The mine is within the Central Lanthanide Deposit

    The mine is within the Central Lanthanide Deposit (CLD), a Resource of 15.0 million tonnes at 9.8% for 1.5 million tonnes of contained REO For personal use only MOUNT WELD STOCKPILES WITH RARE EARTH OXIDE PERCENTAGES DUNCAN DEPOSIT (DD) Offices 773,000t on stockpiles 8% 13% DD CLD 17% DEPOSIT 26% 15

  9. Slide 9: The Concentration Plant commenced feed of ore in May 2011

    The Concentration Plant commenced feed of ore in May 2011 For personal use only OVERHEAD VIEW OF THE CONCENTRATION PLANT 9

  10. Slide 10: Concentration Plant continues to perform well

    Concentration Plant continues to perform well – this part of the production process is now significantly de-risked For personal use only MOUNT WELD CONCENTRATION PLANT Concentration Plant January January Performance 2012 ramp- up plan Final concentrate 35.7% 36.0% grade Recovery 71.5% 66.0% Flotatio

  11. Slide 11: The Duncan deposit is complementary to current operations at the CLD

    The Duncan deposit is complementary to the current operations at the Central Lanthanide Deposit For personal use only CENTRAL LANTHANIDE DEPOSIT AND DUNCAN DEPOSIT RESOURCES Comparison of REE distribution CLD & Duncan Mineral Resource (2.5% REO cut-off) CLD Duncan REO (Secondary Monazite) (Crandalit

  12. Slide 12: Duncan is a highly prospective deposit that could provide a new source of HREEs

    Duncan is a highly prospective deposit that could provide a new source of HREEs For personal use only Total Mount Weld resources  Duncan is a shallow deposit that could be easily exploited using open cut mining  Duncan is open to the east and southwest (see chart) with a high Potential extension C

  13. Slide 13: Malaysia Operations

    For personal use only MALAYSIA OPERATIONS 13

  14. Slide 14: Current status of the LAMP

    Current status of the LAMP For personal use only MAJOR MILESTONES TO DATE  LAMP construction: 96% complete (end of February)  Ready-for-Start-Up program (operational preparedness): >90% complete  Malaysia headcount: 249 (now at 90% of total expected workforce)  Pre-commissioning test packs: >60%

  15. Slide 15: LAMP Temporary Operating Licence

    LAMP Temporary Operating Licence For personal use only Licence approved in February 2012  Lynas respects the regulatory approvals process in Malaysia.  Lynas has intensified its community consultation and engagement following the IAEA review. We intend to maintain this commitment to all stakeholde

  16. Slide 16: Schematic - Lynas Advanced Materials Plant core process

    Schematic - Lynas Advanced Materials Plant core process, which uses mature industry technology For personal use only 16

  17. Slide 17: The LAMP is 0.8km wide and 1.4km long

    The Lynas Advanced Materials Plant (LAMP) is 0.8km wide (N-S) and 1.4 km long (E-W) For personal use only OVERVIEW OF LEACHING, UP AND DOWNSTREAM SEPARATION AND PRODUCT FINISHING WORKSHOPS 17

  18. Slide 18: LAMP construction is more than 90% complete

    LAMP construction is more than 90% complete For personal use only Cracking (Rotary Kiln) Gas Treatment Primary Leaching Secondary Leaching 18

  19. Slide 19: LAMP construction is more than 90% complete

    LAMP construction is more than 90% complete For personal use only Upstream Extraction Downstream Extraction Post Treatment Tunnel Furnaces 19

  20. Slide 20: The path to operating cash flow

    The path to operating cash flow For personal use only Key steps to first cash flow Commissioning Commence First cash Construction First Customer Commercial & first feed to plant ramp- flow from completion kiln production qualification shipments up sales  Current operational focus is construction co

  21. Slide 21: The products are set for Phase 1; product flexibility in Phase 2

    The products are set for Phase 1; Lynas has product flexibility in Phase 2 For personal use only ANTICIPATED PHASE 1 ─ 11,000t REO PRODUCTS VOLUMES (tpa) Ce carbonate 2,600 La carbonate 1,350 Ce / La carbonate 4,000 Nd / Pr oxide 2,700 SEG + Heavy Rare Earths 480 PHASE 2 ─ ADDITIONAL 11,000t REO PRO

  22. Slide 22: Sales & Marketing

    For personal use only SALES & MARKETING 22

  23. Slide 23: Supply and Demand trends

    Supply and Demand trends For personal use only Structural deficit anticipated as demand recovers while supply remains constrained 160000 Forecast 140000 120000 100000 tonnes REO 80000 60000 40000 20000 0 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2

  24. Slide 24: Recent developments in Rare Earths prices

    Recent developments in Rare Earths prices For personal use only Prices returning to sustainable levels that support long term industry growth  Both China domestic and FOB prices returning Mount Weld basket price history to levels that promote long term demand growth 250 in key applications.  Recen

  25. Slide 25: Sales & Marketing

    Sales & Marketing For personal use only Key points  Lynas’ philosophy is to establish a non-Chinese Rare Earths supply chain based on environmentally sustainable practices. Lynas’ Rare Earths Direct (RED) brand epitomises this philosophy.  Lynas has entered into binding offtake agreements in each

  26. Slide 26: The Strategic Alliance with Sojitz

    The Strategic Alliance with Sojitz shall provide a stable and long term source of supply for the Japanese market For personal use only LYNAS, SOJITZ AND JOGMEC HAVE EXECUTED DEFINITIVE AGREEMENTS Sojitz – Lynas Strategic Alliance Financing Availability Distribution & Agency Agreement Agreement Agree

  27. Slide 27: Letter of Intent signed with Siemens to establish a JV

    Letter of Intent signed with Siemens to establish a JV company for the sustainable production of neodymium-based Rare Earths magnets For personal use only LYNAS AND SIEMENS INTEND TO FORM A JOINT VENTURE FOR MAGNET PRODUCTION LYNAS SIEMENS Magnet technology and Long term supply manufacturing capabil

  28. Slide 28: Financial Update

    For personal use only FINANCIAL UPDATE 28

  29. Slide 29: Budgeted Phase construction costs are fully funded

    Budgeted Phase 1 construction costs are fully funded For personal use only PHASE 1 ESTIMATED CONSTRUCTION AND OTHER TOTAL SPEND TO 31/12/11 FUTURE SPEND CAPITAL COSTS A$m A$m A$m Mount Weld Concentration Plant 75.4 75.4 0.0 Lynas Advanced Materials Plant, Malaysia 349.1 255.0 94.1 Engineering and Pr

  30. Slide 30: US$225m Convertible Bond issue to Mount Kellett

    US$225m Convertible Bond issue to Mount Kellett provides comprehensive funding facility through to first cash flow from sales For personal use only In January 2012, Lynas executed binding documentation with Mount Kellett Sources of funds Uses of funds • US$50m Tranche 1 (already subscribed on • ~$17

  31. Slide 31: Lynas – online in 2012, delivering Rare Earths globally

    Lynas – online in 2012, delivering Rare Earths globally For personal use only • Our vision is to be the leader in Rare Earths for a sustainable future. • We are close to realising this vision. • Our supply of Rare Earths will be based on environmentally sustainable practices. • Lynas will be online

  32. Slide 32: Note

    NOTE For personal use only The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Brendan Shand, who is a member of The Australasian Institute of Mining and Metallurgy. Brendan Shand is an employee of Lynas Corporatio