Tribeca Resources Corporation · TSXV:TRBC

Tribeca Resources — Investor Presentation (May 2024)

41 slides from Tribeca Resources's investor presentation, May 2024

  1. Slide 1: Discovering copper under cover in the Chilean Coastal IOCG Belt

    Discovering copper under cover in the Chilean Coastal IOCG Belt CORPORATE PRESENTATION MAY 2024 TSXV: TRBC

  2. Slide 2: Forward Looking Statements and Disclaimer

    Forward Looking Statements and Disclaimer This corporate presentation and the information contained herein (the “Presentation”) is proprietary and for authorized use o nly. It is being provided for the use of prospective investors with the express understanding that, without the prior permission in

  3. Slide 3: Introduction to Tribeca Resources

    Introduction to Tribeca Resources

  4. Slide 4: We are a copper exploration company focused on discovering and developing future mines

    INTRO TO TRIBECA Experienced Science- team with driven leading IOCG We are a copper exploration expertise company focused on discovering and developing future mines in Prolific Chilean Recent and the Chilean Coastal IOCG belt growing Coastal IOCG discovery Belt People and Building planet portfolio v

  5. Slide 5: Tribeca Snapshot

    INTRO TO TRIBECA Tribeca Snapshot CAPITAL STRUCTURE MANAGEMENT & BOARD SHAREHOLDERS Share Price (10-May-2024) C$0.33 Dr. Paul Gow CEO, Director % undiluted Shares Outstanding (# shares) 62.24M Thomas Schmidt President, Director Warrants (# warrants) 5.32M Nick DeMare CFO & Corporate Options (# optio

  6. Slide 6: Track-record in Latam copper, exploration and M&A

    Track-record in Latam copper, exploration and M&A Management / Co-founders Directors & corporate • Mining Engineer with extensive operating background Dr. Paul Gow • Geologist with doctorate and 25+ years’ experience in Luis Tondo mineral exploration and project development. with majors and juniors

  7. Slide 7: Milestones and upcoming catalysts

    INTRO TO TRIBECA Milestones and upcoming catalysts 2017-2022 2023 2024 2025 4 property acquisitions in La Geophysics and Phase 1 drilling Chiricuto acquisition (Mar 2024) La Higuera Phase 4 drilling Higuera mining district (funded program (9 holes for ~2,800m) by founders) at Gaby and Chirsposo Chir

  8. Slide 8: Our approach

    Our approach

  9. Slide 9: New approaches are unlocking IOCG opportunities

    APPROACH New approaches are unlocking IOCG opportunities Why hunt for new IOCG deposits? Low exploration maturity New concepts/ technologies Variety of deposit types with can be applied by-product credits Major Global IOCG Belts Giant Deposits Resource* Company 1. Gawler Craton (Australia) Olympic D

  10. Slide 10: Chilean Coastal IOCG Belt is ripe for discovery

    APPROACH Chilean Coastal IOCG Belt is ripe for discovery Key regional advantages 1) infrastructure-rich 2) low altitude 3) access to sea water 4) under-explored with historic focus on outcropping areas 7 major Chilean Coastal IOCG Belt deposits (within the ~1,000 km N-S area Tribeca is focussed on)

  11. Slide 11: Our strategy: science-led, portfolio driven exploration

    APPROACH Our strategy: science-led, portfolio driven exploration Differentiated from the all-or-nothing, single asset, high G&A junior template Seeking superior risk-adjusted returns by bringing a science-led approach to exploration & discovery in the Chilean Coastal IOCG belt Portfolio Approach Dis

  12. Slide 12: Chiricuto Project

    Chiricuto Project

  13. Slide 13: Chiricuto Project

    CHIRICUTO PROJECT Chiricuto Project A rare undrilled geophysical target in the Capstone dominated Mantoverde district • 5-year purchase option secured March ‘24 o Option to acquire a100% interest o Low up-front cost and low on-going commitments o Purchase price of US$1-10 million; tied to size of ma

  14. Slide 14: Chiricuto Project (cont'd)

    CHIRICUTO PROJECT Chiricuto Project A rare undrilled geophysical target in the Capstone dominated Mantoverde district (cont’d) Project highlights • 570 hectares; 15km from Mantoverde (Capstone) • Located within andesite-dominated lower unit of Middle- Upper Jurassic La Negra Formation (same rock uni

  15. Slide 15: La Higuera IOCG Project

    La Higuera IOCG Project

  16. Slide 16: La Higuera IOCG Project: Overview

    LA HIGUERA PROJECT La Higuera IOCG Project: Overview Gaby IOCG System Benja target New discovery, 1.4km strike length drilled Geophysical targets on extensions to historic high • Located 500km north of Santiago grade mining operation Best intersection: - 268m @ 0.66% Cu, 0.14 g/t Au, • Two drilled I

  17. Slide 17: La Higuera IOCG project: Exploration programs

    LA HIGUERA PROJECT La Higuera IOCG project: Exploration programs Drill testing of two targets under cover completed: Gaby and Chirsposo Extension IP Phase 1 Program: Completed ✓ Geophysics (gravity, ground magnetics) ✓ 2,750m RC and diamond Phase 1 drilling GABY Reconnaissance Q3 2023 Surface Work:

  18. Slide 18: Gaby IOCG discovery (2023)

    LA HIGUERA PROJECT Gaby IOCG discovery (2023) Step out to drill under cover (now 1.4km strike length of mineralization) RCH-LH-07 - 285m @ 0.40% copper, 0.08 g/t gold incl. 56m at 0.60% copper, 0.12 g/t gold (historic intersection) GBY001 - 268m at 0.66% copper, 0.14 g/t gold incl. 90m at 1.02% copp

  19. Slide 19: Gaby target drill section

    LA HIGUERA PROJECT Gaby target drill section Drill holes GBY001, GBY003, GBY008 GBY001 intersection: 268m at 0.66% copper and 0.14 g/t gold incl. 90m at 1.02% copper and 0.23 g/t gold 19

  20. Slide 20: Phase 2 drill program

    LA HIGUERA PROJECT Phase 2 drill program Gaby IOCG discovery Phase 2 Drill Program • Phase 1 drill program demonstrated that the system maintains an interpreted minimum 130m thickness over the northern 650m strike extent • Fully funded Phase 2 drill program completed to: - constrain geometry of syst

  21. Slide 21: La Higuera Project Targets

    PROJECT La Higuera Project Targets Gaby Five targets in total (two drill-tested to date) Benja Gaby (29 holes for 10,118 metres drilled): • Mineralized system of 1.4km, open with depth, additional geophysical targets exist Benja (undrilled): – Magnetic complex with coincident variable intensity char

  22. Slide 22: A foothold in an emerging IOCG district

    LA HIGUERA PROJECT A foothold in an emerging IOCG district The Chilean IOCG Belt hosts several districts with multiple deposits Candelaria - Punta del Cobre Dominga Norte district: 13Mt1 Cu resources Dominga Norte: 7Mt at 1.5% Cu,   Las Posadas 0.3 g/t Au, 36% Fe** Posadas: 43.7Mt at 0.55% CuT* Ma

  23. Slide 23: Investment case

    Investment case paul.gow@tribecaresources.com www.tribecaresources.com thomas.schmidt@tribecaresources.com 23

  24. Slide 24: Peer comparison: significant re-rating potential

    INVESTMENT CASE Peer comparison: significant re-rating potential Selected peers with copper and/or IOCG projects in South America Mkt Cap. Company Main Project Country Project stage Deposit Type Metals Exchange (US$ MM)* Filo Filo del Sol PFS Porphyry Cu-Au-Ag TSX 2,356 Far West Santo Domingo PEA +

  25. Slide 25: Delivering next generation of IOCG mines in Chile

    INVESTMENT CASE Delivering next generation of IOCG mines in Chile Copper dominant with gold and possible cobalt credits Tribeca Investment proposition Copper is Differentiated Upside critical strategy potential The world needs more Science-led team Growing mineralized system copper at La Higuera New

  26. Slide 26: Appendices

    Appendices www.tribecaresources.co paul.gow@tribecaresources.com m thomas.schmidt@tribecaresources.com

  27. Slide 27: Copper plays pivotal role in green energy transition

    APPENDICES: THE NEED FOR COPPER Copper plays pivotal role in green energy transition Near doubling of annual consumption expected by 2040 “ Demand for copper — already on a rising trend — is arguably set to explode as the energy transition takes hold. − Wood Mackenzie, Julian Kettle Sr. V.P. Metals

  28. Slide 28: Economic development requires copper

    APPENDICES: THE NEED FOR COPPER Economic development requires copper Reaching UN development goals requires a ~4x increase in installed copper Significant increase in commodity supply Level of investment required implies required for decarbonisation and fair transition sustained higher prices are ne

  29. Slide 29: La Higuera IOGC Project

    APPENDICES La Higuera IOGC Project Mining concessions & underlying ownership (100% purchase (100% direct option)1 ownership) (100% direct ownership) (100% direct ownership) 1 US$200k payment due in March 2024 and US$1.8M payment due in March 2025. 5% Exploration Levy due on exploration work carried

  30. Slide 30: The broader La Higuera district

    APPENDICES The broader La Higuera district Current and proposed infrastructure 30

  31. Slide 31: Chirsposo target - 2023 drill results

    APPENDICES Chirsposo target - 2023 drill results CHS001 and CHS002 CHS002 167m at 0.21% copper, including 12m @ 0.91% Cu, 0.24 g/t Au from 56m Chirsposo represents a near surface copper-gold IOCG system with numerous shallow, thick, copper intersections CHS002: 154-159m: 0.65% Cu, 0.25 g/t Au 31

  32. Slide 32: Early-stage targets at Caballo Blanco

    APPENDICES Early-stage targets at Caballo Blanco EARLY STAGE Additional TARGETS: based on geophysical targets geophysical data Chirsposo Location of Zone historical geophysical datasets shown DON BAUCHA: Intense magnetic and LEGEND Magnetic chargeability target – Susceptibility (SI) 1 hole to date D

  33. Slide 33: Metallurgical test work

    APPENDICES Metallurgical test work • Metallurgical test work (G&T Metallurgical Services Ltd, 2006) on two composites of drill core with copper head grades of 0.75% Cu and 0.1% Cu • Work indicated a copper and gold recovery of 85% and 65%, respectively, at a P 80 of 139μm, with recoveries improving

  34. Slide 34: Drill results obtained at La Higuera IOCG Project

    APPENDICES Drill results obtained at La Higuera IOCG Project Recent and historical drill intersections reported From To Downhole Cu Au Co CuEq From Downhole Cu Au Co CuEq HoleID (m) (m) Interval (m) (%) (g/t) (ppm) (%)* HoleID (m) To (m) Interval (m) (%) (g/t) (ppm) (%)* Gaby - Tribeca Phase 1 Gaby

  35. Slide 35: Recent M&A activity: Chile copper

    APPENDICES Recent M&A activity: Chile copper Extensive M&A/investment activity involving Chilean copper assets despite tax regime and constitutional uncertainties during 2022 and early 2023 Consummated transactions involving Chilean copper deposits May ’24 BHP bidding for Anglo American whose portfo

  36. Slide 36: Global IOCG terranes

    APPENDICES Phase 2 drill program Key Global budget IOCG Terranes Carajás Cloncurry Belt Coastal Belt Chile-Peru Gawler Craton (Olympic Province) 37

  37. Slide 37: Highly Aligned Management Team

    APPENDICES Highly Aligned* Management Team Exceptional track-record in Latin American copper, exploration, finance and M&A Team Member Background Notable Experience Dr. Paul Gow Geologist Former Glencore GM Projects/Exploration CEO, Director 25+ years experience Geologist with extensive experience i

  38. Slide 38: Experienced Independent Directors

    APPENDICES Experienced Independent Directors Diverse capabilities, with deep mining, investing and company-building experience Team Member Background Notable Experience Luis Tondo Metallurgy & Mining Engineer with extensive operating background in Latam Director, engineering Junior and major company

  39. Slide 39: Photo Gallery

    APPENDIC Photo Gallery VuINCREASING IN SIZE WITH DRILLIN age ON PROPERTY

  40. Slide 40: Statutory Rights of Action

    Statutory Rights of Action The following summary of the statutory rights of action for damages or recission will apply to a Canadian purchaser of securi ties in the event that this Presentation is deemed to be an offering memorandum pursuant to securities legislation in the applicable province or te

  41. Slide 41: TSXV: TRBC

    TSXV: TRBC www.tribecaresources.com | admin@tribecaresources.com

Tribeca Resources — Investor Presentation (May 2024) on 6ix