    Power-First Digital Infrastructure Platform NASDAQ: BGDE Investor Relations November 2026 Samir Jain, CFA | OG Advisory Group 1

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer This presentation has been designed to provide general information about Big Digital Energy, Inc. (“BGDE” or "the Company”). Any information contained or referenced herein is suitable only as an introduction to the Company. The information contained in this presentation is for information

  3. Slide 3: Investment Highlights

    Slide 3: Investment Highlights

    Investment Highlights Power Infrastructure Assets Improving Operating Momentum AI/HPC Commercialization Path 169 MW Energized 20 MW Increase 17 MW Energized | Hood County, TX 152 MW BGDE-owned In deployed mining capacity Tensor IQ LOI up to 17 MW initial deployment 17 MW under development through 50

  4. Slide 4: What Changed in 2026

    Slide 4: What Changed in 2026

    What Changed in 2026 Q1 2026 Q2 2026 Q3 2026 Q4 2026 Prior MIGI management still Leadership Transition Operations Commercial Execution Near-Term Priorities in place New leadership and board 75 MW colocation Hood County acquisition Complete final design, installed agreement signed closed engineering

  5. Slide 5: BGDE Platform Today

    Slide 5: BGDE Platform Today

    BGDE Platform Today 169 MW 547 MW 4 Grid-connected power Pipeline1 AI/HPC conversion candidates Four energized sites Site expansion under development Every site in the portfolio Site Power Future Power Midland, PA 120 MW - PJM Operating · anchor site Corning, OH 24 MW 76 MW PJM Expansion site Midlan

  6. Slide 6: Hood County, TX | 17 MW of Live Power

    Slide 6: Hood County, TX | 17 MW of Live Power

    Hood County, TX | 17 MW of Live Power 50/50 joint venture with 10NetZero Site: ~50 acres, Less than 40 miles from DFW, 30,000+ sq ft of existing structures Scaled Power Pathway 300 Power: 17 MW energized today; 138 kV interconnection; pathway to 111 MW1 Gas: 3 natural gas pipelines on site that can

  7. Slide 7: SixThirty.AI Assets

    Slide 7: SixThirty.AI Assets

    SixThirty.AI Assets 79 MW 399 MW 5 Grid-connected power Pipeline AI/HPC site conversion candidates Site expansion under development Every site in the portfolio Site Power Future Power Mustang PJM Operating · anchor site 24 MW 74 MW Manning MISO Expansion site 25 MW 25 MW Wallis ERCOT Expansion site

  8. Slide 8: Leadership & Governance Built for Execution

    Slide 8: Leadership & Governance Built for Execution

    Leadership & Governance Built for Execution Executive Leadership Josh Kilgore | Executive Chairman Phil Stanley | CEO Cody Smith | COO Principal | SixThirty.AI Principal | SixThirty.AI Principal | SixThirty.AI Infrastructure Development · Real Estate · Capital Formation Strategy · Investments · Capi

  9. Slide 9: Independent Framework for Acquisition of Endeavor Affiliated Assets

    Slide 9: Independent Framework for Acquisition of Endeavor Affiliated Assets

    Independent Framework for Acquisition of Endeavor Affiliated Assets SixThirty.AI-controlled assets may provide BGDE with access to a differentiated development pipeline. Any related-party asset acquisition or contribution would be evaluated through an independent, disciplined and shareholder-focused

  10. Slide 10: As Projects De-Risk, Capital Shifts to the Asset Level

    Slide 10: As Projects De-Risk, Capital Shifts to the Asset Level

    As Projects De-Risk, Capital Shifts to the Asset Level Parent-Co equity intended to fund early development; larger construction requirements should increasingly migrate to the project-level as assets reach commercial and construction milestones. Stage Site Control & Origination Development & Interco

  11. Slide 11: Proposed Combined Platform

    Slide 11: Proposed Combined Platform

    Proposed Combined Platform Strategic Optionality Big Digital Energy 169 MW 148 MW PJM, nuclear-powered Grid-connected power Pipeline BTC Mining, Colocation, Energy Management Four energized sites Site expansion under development Grid, natural gas, proximity to water sources SixThirty.AI1 79 MW 399 M

  12. Slide 12: Transforming BGDE into an AI Powerhouse

    Slide 12: Transforming BGDE into an AI Powerhouse

    Transforming BGDE into an AI Powerhouse 12

  13. Slide 13: Growth Strategy

    Slide 13: Growth Strategy

    Growth Strategy 1 2 Restructure asset base to de-emphasize pure BTC Leverage PJM power footprint and Big Digital Energy’s mining and prioritize AI/HPC colocation. Sell, build, or site infrastructure to develop AI/HPC hosting business. convert assets as necessary to maximize value. Acquire Engage hyp

  14. Slide 14: Leasing Is Extending Well Below Hyperscale Campus Size

    Slide 14: Leasing Is Extending Well Below Hyperscale Campus Size

    Leasing Is Extending Well Below Hyperscale Campus Size 7 of 13 executed 2026 infrastructure leases by powered-land developers are 210 MW or smaller with base-term economics of ~$1.86M IT MW / year ≤ 210 MW: 7 of 13 transactions SAMPLE STATISTICS — 13 TRANSACTIONS $2.6M TeraWulf / Anthropic Bitdeer /

  15. Slide 15: Market Re-Rates Power as It Becomes Contracted and Financeable

    Slide 15: Market Re-Rates Power as It Becomes Contracted and Financeable

    Market Re-Rates Power as It Becomes Contracted and Financeable Public peers illustrate the progression from powered-site optionality to contracted, financeable capacity and ultimately operating cash flow. BGDE remains at the customer-validation stage Hut 8 $11.0B · 949 MW · $7.5B project bonds $10B

  16. Slide 16: Development Pipeline of Assets controlled by Sixthirty.AI

    Slide 16: Development Pipeline of Assets controlled by Sixthirty.AI

    Development Pipeline of Assets controlled by Sixthirty.AI 16

  17. Slide 17: Mustang

    Slide 17: Mustang

    Mustang 24 MW Currently Operational Expansion: Can scale up to 99 MW. Land is owned. Power Advantage: ~$55/MWh AI Suitability: Strategically positioned adjacent to major substations, making it a prime candidate for immediate high-density retrofits and hyperscaler off-take. 17

  18. Slide 18: Manning

    Slide 18: Manning

    Manning 25 MW Currently Operational Expansion:. Scalable to 50 MW. Turnkey facility ready for immediate deployment Power Advantage: ~$70/MWh. Partnership with Whatsminer AI Suitability: Rapidly scalable operation. Established, high-efficiency infrastructure. 18

  19. Slide 19: Wallis

    Slide 19: Wallis

    Wallis 20 MW Currently Operational Expansion:. Turnkey facility ready for immediate deployment Power Advantage: ~$65/MWh AI Suitability: Rapidly scalable operation. Established, high-efficiency infrastructure. 19

  20. Slide 20: Wildcat

    Slide 20: Wildcat

    Wildcat 10 MW Currently Operational Expansion: Currently negotiating utility expansion. 15 owned acres. Power Advantage: ~$49/MWh AI Suitability: Highly suitable for load-flexible AI deployments due to sophisticated energy curtailment capabilities 20