Slide 1: Engineering Test Facilities – Carrollton, TX
Engineering Test Facilities – Carrollton, TX Improving Completion Reliability through Testing
Slide 2: Overview
Overview Carrollton Engineering Test Facilities • Mike Adams Test Well • High Temperature Gas Test Facility • High Temperature Test Facility • Deep Well Simulator Test Facility • Subsurface Safety Valve Test Facility • North Test Well What do we have to offer? • Engineering analysis and support
Slide 3: "Mike Adams" Test Well
“Mike Adams” Test Well Features • Big Bore Well • Vertical and horizontal applications • 5000 psi wellhead rating • Variety of casing configurations available Benefits • Improves reliability • Control room for customer viewing • Established contacts for special equipment requirements • Dedicated
Slide 4: High Temperature Gas Test Facility
High Temperature Gas Test Facility Features • Segregated test cells allow for continuous testing • Built for testing with liquids or nitrogen gas – 40,000 psig – Maximum of 4 ft3, (0.113 m3) nitrogen gas • Test cell accommodates assemblies up to 45 ft and 28 in. diameter and have a temperature ran
Slide 5: High Temperature Test Facility
High Temperature Test Facility Features • 5 in-ground heated test cells and 1 rapid cool down cell • Ideal for liquid tests at temperature • Accommodates assemblies up to 30 ft and 30 in. diameter and has a temperature range up to 700°F (371°C) • Simulates severe temperatures down hole • Rapid coo
Slide 6: Deep Well Simulator Test Facility
Deep Well Simulator Test Facility Features • In-ground test facility • Accommodates large diameter assemblies – 52 in. X 63 ft • Simulates severe temp and pressures – Up to 700°F (371°C) • Snubbing jack • Gantry crane Benefits • Data usable in Microsoft Excel® • Real-time data visible in 12-hour
Slide 7: Subsurface Safety Valve Test Facility
Subsurface Safety Valve Test Facility Features • Demanding test programs • Endurance requirements • Separate control room • Three test stands • Below ground testing • Compressed air holding tanks • Sand slurry testing Benefits • Designs exceed API industry standards • Computers interface with al
Slide 8: North Test Well
North Test Well Features • Full scale testing – Packers – Safety valves – Sliding Side-Door® devices – Wireline tools – Coiled tubing units – Snubbing units – Pumpdown installations Benefits • Training • Additional well during peak periods © 2012 HALLIBURTON. ALL RIGHTS RESERVED. 8
Slide 9: Who to Contact
Reliability through Testing Who to Contact David Henry Engineering Test Facilities Manager David.Henry@halliburton.com Phone: 972-418-3675 Fax: 972-418-3864 Cell: 903-237-9850 © 2012 HALLIBURTON. ALL RIGHTS RESERVED. 9