Slide 1: GAIL Dibiyapur Welcomes Analyst Team
GAIL Dibiyapur Welcomes ALLEL SS Team
Slide 2: Jurisdiction of Dibiyapur Region
Jurisdiction of Dibiyapur Region IFFCO TCL AONLA 24” Auraiya-Sachendi P/L 17 Babrala (71Km) 46Km Laid 15 16 CUGL Bareilly 18” Auraiya-Jagdishpur P/L SHIVALI (218Km) B’Shahar 13 KSFL Shahjahapur 24” Auraiya-Babrala P/L CUGL Kanpur GGL (375Km) Lucknow 4 5 2 NTPC 6 KFCL Kanpur 7 BHEL Jagdishpur 1 GAIL
Slide 3: Details of Critical Equipment
Details of Critical Equipment Installed Equipment Capacity Remarks Quantity Gas Turbine 02 Nos. Scheme exits to draw 2.7 MW power from Pata Generators (01+01) Gas Turbine 03 Nos. Compressors 175000 SCM/Hr Primary Compressor (Allison) (02+01) Gas Turbine 02 Nos. 389000 SCM/Hr Booster Compressor Compr
Slide 4: Dibiyapur Region NG Flow Chart
Dibiyapur Region NG Flow Chart CUGL TCL (Babrala) NG from Vijaipur KSFL (Bareilly) 30” Feed Gas (Shahjahapur) Pata Plant 24” 30”Lean Gas From 24” ABPL Dadri Shiwali 12” GGL IFFCO Adani (Dibiyapur) Allison Allison EGT (Aonla) Khurja 18” AJPL (Shivali) 24” Loop line NTPC (Auraiya) 18”AJPL GTCs 2+1 Boo
Slide 5: Pipeline & Communication Network
Pipeline & Communication Network • Pipeline: Operations & Maintenance of approx. 1143 KM S/N P/L NAME & DIA (INCH) LENGTH (KM) 1 30” Mayapur/Jhansi/Auraiya/Pata 284 2 24” Auraiya to Babrala-Shivali /Asanda 417 3 18” Auraiya/Jagdishpur/Phulpur 358 4 12” Auraiya to NTPC Auraiya/KFCL Kanpur/Pipraula- 1
Slide 6: Thank You
Thank You 20 March 2017 6