Boral — Corporate Update (June 2019)
38 slides from Boral's corporate update, June 2019
Slide 1: Peppertree Quarry Community Consultative Committee June 2019
PEPPERTREE QUARRY COMMUNITY CONSULTATIVE COMMITTEE JUNE 2019
Slide 2: Agenda item 3 – Correspondence
Agenda item 3 – Correspondence (February, March, April, May 2019) - Department of Planning and Environment - Modification 5 draft conditions received - Annual report issued and correspondence received - Annual report on website. Report meets the requirements of the appropriate condition - Independen
Slide 3: Agenda item 4 – Operations
Agenda item 4 – Operations Safety - Zero LTI’s since the last meeting Overburden - Overburden works coming towards and end for this campaign with the development of the southern overburden and associated storm water controls - Tree planting, top-soiling and hydro-mulching of these areas has comm
Slide 4: Agenda item 5 – OH&S Performance
Agenda item 5 – OH&S Performance Zero loss time injuries Resource Regulator has visited the site: - Feb 2019 – Following up on a minor electric shock incident caused by a faulty outlet - April 2019 – An unannounced visit to review dust control measures - May 2019 – A 2nd unannounced visit to rev
Slide 5: Environmental Performance – Incidents
Agenda Item 6 - Environmental Performance Incidents incidents 2015 - 2019 10 9 8 number of incidents 7 6 5 4 3 2 1 0 Jan-2015 Oct-2016 Jul-2015 Oct-2015 Jan-2016 Jul-2016 Jan-2017 Jul-2017 Oct-2017 Jan-2018 Jul-2018 Oct-2018 Jan-2019 Apr-2015 Apr-2016 Apr-2017 Apr-2018 Apr-2019 Incidents January 201
Slide 6: Environmental Performance – Complaints
Agenda item 6 – Environmental Performance Complaints 6
Slide 7: Environmental Performance – SBS Feed Discussion
Agenda item 6 – Environmental Performance Complaints SBS Feed Discussion 7
Slide 8: Environmental Performance – Air
Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month not in compliance at the site however majority of insoluble solid is organic Annual average below goal at the boundary 8
Slide 9: Environmental Performance – Air
Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month In compliance 9
Slide 10: Environmental Performance – Air
Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month . not in compliance at the site however majority of insoluble solid is organic Annual average below goal at the boundary 10
Slide 11: Environmental Performance – Air
Agenda item 6 – Environmental Performance Air . 11
Slide 12: Air – Particulate Matter <10 microns – annual average
Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – annual average In compliance with the annual average goal 12
Slide 13: Air – Particulate Matter <10 microns – 24 hour criteria
Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – 24 hour criteria All in compliance since last meeting (February 2019) Note criteria is at the nearest residence and not the HVAS. 13
Slide 14: Air - Total Suspended Particulates
Agenda item 6 – Environmental Performance Air - Total Suspended Particulates TSP below Annual average goal 14
Slide 15: Air - TSP and PM10
Agenda item 6 – Environmental Performance Air - TSP and PM10 15
Slide 16: Noise - quarterly noise monitoring, daytime
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019 daytime Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) daytime R8 13/2/2019 20.9 41 R8 13/2/2019 22.2 41 R8 13/2/2019 24.1 41 R4 13/2/2019 22.
Slide 17: Noise - quarterly noise monitoring, evening
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019– evening Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) evening R17 13/2/2019 23.1 35 R17 13/2/2019 13.7 35 R17 13/2/2019 13.8 35 R3 13/2/2019
Slide 18: Noise - quarterly noise monitoring, evening 1min
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019 evening 1min Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LA1, 1 minute (dB(A)) evening R17 13/2/2019 23.1 45 R17 13/2/2019 13.5 45 R17 13/2/2019 13.6 45 R3 13/2/20
Slide 19: Noise - quarterly noise monitoring, April (May) daytime
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring April (May) 2019 daytime Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) daytime R17 7/5/2019 26 35 R17 7/5/2019 28 35 R2 7/5/2019 29 35 R3 7/5/2019 26 35 R2 7/5/2019
Slide 20: Noise - quarterly noise monitoring, evening/night
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) Evening / night R3 8/5/2019 30 35 R4 8/5/2019 23 35 R8 8/5/2019 23 35 R4 8/5/2019 23 35 R8 8/5/2019 18 35 R4 8/5/2019 2
Slide 21: Noise - quarterly noise monitoring, 1 minute
Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LA1, 1 minute (dB(A)) evening R17 8/5/2019 34 45 R17 8/5/2019 34 45 R3 8/5/2019 20 45 R2 8/5/2019 27 45 R3 8/5/2019 21 45 R2 8/5/2019 27 45 R8
Slide 22: Blast monitoring
Agenda item 6 – Environmental Performance Blast monitoring All in compliance 22
Slide 23: Blast monitoring
Agenda item 6 – Environmental Performance Blast monitoring All in compliance 23
Slide 24: Surface water
Agenda item 6 – Environmental Performance Surface water Quarterly monitoring round undertaken in March 2019 Due to lack of rain only 3 sites sampled – no flow onto the site. Next sample round June 2019 Total Nitrogen for T1 is below the trigger. Levels in the dam fluctuate with rain Marulan south cr
Slide 25: Surface water
Agenda item 6 – Environmental Performance Surface water Total dissolved solids below trigger Turbidity below trigger 25
Slide 26: Surface water
Agenda item 6 – Environmental Performance Surface water pH within trigger levels Total phosphorus - T1 and the Dam are below the trigger level. 26
Slide 27: Ground water
Agenda item 6 – Environmental Performance Ground water No draw down of ground water from sentinel well .i.e. no impact on local groundwater. 27
Slide 28: Ground water
Agenda item 6 – Environmental Performance Ground water Monitoring conducted January 2019 Review has been undertaken in regards to the trigger levels Due to the direction of flow of groundwater towards the pit, trigger levels are not relevant. Ie groundwater flow is very slow and not away from
Slide 29: Environmental flow
Agenda item 6 – Environmental Performance Environmental flow 29
Slide 30: Heritage
Agenda item 6 – Environmental Performance Heritage Announcement of RAP Next step to fence scar trees 30
Slide 31: Ecology
Agenda item 6 – Environmental Performance Ecology 40 000m2 area hydro mulched on the southern overburden since the last CCC Top of the eastern overburden and slopes have been planted approx. 100 000plants Ecological assessment report received. “The 2019 rehabilitation monitoring identified tha
Slide 32: Stakeholder Engagement
Agenda item 6 – Stakeholder Engagement Outward Bound – May 2019 Tallong Apple Day Partnership in construction of sporting shed at Marulan public school Kite festival September 2019 CVA program associated with Koala survey in Bungonia national park being planned for September 2019 Marulan
Slide 33: Agenda item 7 – Plans for the next three months
Agenda item 7 – Plans for the next three months Safety - Maintain zero harm to our employees and contractors - Focus on pedestrian and vehicle interactions Overburden - Completion of the Southern overburden dump by June 2019 Pit update - Continue to head South across the pit floor Processing
Slide 34: Agenda item 8 – General Business
Agenda item 8 – General Business Weather station update - Report now available for the relocation of the weather station - current weather station is compatible with the real time noise monitoring but will require an upgrade - Weather station has bee relocated Real Time noise monitoring - Contra
Slide 35: General Business – Marulan South Limestone update
Agenda item 8 – General Business Marulan South Limestone update Formal public exhibition period has occurred. 60 plus Submissions made to DPE triggering IPAC review process RTSE being prepared as per DPE direction Public meeting held with Tallong representatives to discuss Tallong Dam Wate
Slide 36: General Business – Peppertree Quarry Modification
Agenda item 8 – General Business Peppertree Quarry Modification 5 - draft conditions of consent of been received. 36
Slide 37: General Business – Next meeting dates
Agenda item 8 – General Business Next meeting dates – - August 2019 37
Slide 38: Slide 38