  1. Slide 1: Peppertree Quarry Community Consultative Committee June 2019

    PEPPERTREE QUARRY COMMUNITY CONSULTATIVE COMMITTEE JUNE 2019

  2. Slide 2: Agenda item 3 – Correspondence

    Agenda item 3 – Correspondence (February, March, April, May 2019) - Department of Planning and Environment - Modification 5 draft conditions received - Annual report issued and correspondence received - Annual report on website. Report meets the requirements of the appropriate condition - Independen

  3. Slide 3: Agenda item 4 – Operations

    Agenda item 4 – Operations  Safety - Zero LTI’s since the last meeting  Overburden - Overburden works coming towards and end for this campaign with the development of the southern overburden and associated storm water controls - Tree planting, top-soiling and hydro-mulching of these areas has comm

  4. Slide 4: Agenda item 5 – OH&S Performance

    Agenda item 5 – OH&S Performance  Zero loss time injuries  Resource Regulator has visited the site: - Feb 2019 – Following up on a minor electric shock incident caused by a faulty outlet - April 2019 – An unannounced visit to review dust control measures - May 2019 – A 2nd unannounced visit to rev

  5. Slide 5: Environmental Performance – Incidents

    Agenda Item 6 - Environmental Performance Incidents incidents 2015 - 2019 10 9 8 number of incidents 7 6 5 4 3 2 1 0 Jan-2015 Oct-2016 Jul-2015 Oct-2015 Jan-2016 Jul-2016 Jan-2017 Jul-2017 Oct-2017 Jan-2018 Jul-2018 Oct-2018 Jan-2019 Apr-2015 Apr-2016 Apr-2017 Apr-2018 Apr-2019 Incidents January 201

  6. Slide 6: Environmental Performance – Complaints

    Agenda item 6 – Environmental Performance Complaints 6

  7. Slide 7: Environmental Performance – SBS Feed Discussion

    Agenda item 6 – Environmental Performance Complaints SBS Feed Discussion 7

  8. Slide 8: Environmental Performance – Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month not in compliance at the site however majority of insoluble solid is organic Annual average below goal at the boundary 8

  9. Slide 9: Environmental Performance – Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month In compliance 9

  10. Slide 10: Environmental Performance – Air

    Agenda item 6 – Environmental Performance Air Annual Average goal of 4gm2/month . not in compliance at the site however majority of insoluble solid is organic Annual average below goal at the boundary 10

  11. Slide 11: Environmental Performance – Air

    Agenda item 6 – Environmental Performance Air . 11

  12. Slide 12: Air – Particulate Matter <10 microns – annual average

    Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – annual average In compliance with the annual average goal 12

  13. Slide 13: Air – Particulate Matter <10 microns – 24 hour criteria

    Agenda item 6 – Environmental Performance Air – Particulate Matter <10 microns – 24 hour criteria All in compliance since last meeting (February 2019) Note criteria is at the nearest residence and not the HVAS. 13

  14. Slide 14: Air - Total Suspended Particulates

    Agenda item 6 – Environmental Performance Air - Total Suspended Particulates TSP below Annual average goal 14

  15. Slide 15: Air - TSP and PM10

    Agenda item 6 – Environmental Performance Air - TSP and PM10 15

  16. Slide 16: Noise - quarterly noise monitoring, daytime

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019 daytime Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) daytime R8 13/2/2019 20.9 41 R8 13/2/2019 22.2 41 R8 13/2/2019 24.1 41 R4 13/2/2019 22.

  17. Slide 17: Noise - quarterly noise monitoring, evening

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019– evening Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) evening R17 13/2/2019 23.1 35 R17 13/2/2019 13.7 35 R17 13/2/2019 13.8 35 R3 13/2/2019

  18. Slide 18: Noise - quarterly noise monitoring, evening 1min

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring January (February) 2019 evening 1min Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LA1, 1 minute (dB(A)) evening R17 13/2/2019 23.1 45 R17 13/2/2019 13.5 45 R17 13/2/2019 13.6 45 R3 13/2/20

  19. Slide 19: Noise - quarterly noise monitoring, April (May) daytime

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring April (May) 2019 daytime Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) daytime R17 7/5/2019 26 35 R17 7/5/2019 28 35 R2 7/5/2019 29 35 R3 7/5/2019 26 35 R2 7/5/2019

  20. Slide 20: Noise - quarterly noise monitoring, evening/night

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LAeq, 15 minute (dB(A)) Evening / night R3 8/5/2019 30 35 R4 8/5/2019 23 35 R8 8/5/2019 23 35 R4 8/5/2019 23 35 R8 8/5/2019 18 35 R4 8/5/2019 2

  21. Slide 21: Noise - quarterly noise monitoring, 1 minute

    Agenda item 6 – Environmental Performance Noise - quarterly noise monitoring Receiver Date Site Noise Level Contribution Operational Criteria (dB(A)) EPL ID LA1, 1 minute (dB(A)) evening R17 8/5/2019 34 45 R17 8/5/2019 34 45 R3 8/5/2019 20 45 R2 8/5/2019 27 45 R3 8/5/2019 21 45 R2 8/5/2019 27 45 R8

  22. Slide 22: Blast monitoring

    Agenda item 6 – Environmental Performance Blast monitoring All in compliance 22

  23. Slide 23: Blast monitoring

    Agenda item 6 – Environmental Performance Blast monitoring All in compliance 23

  24. Slide 24: Surface water

    Agenda item 6 – Environmental Performance Surface water Quarterly monitoring round undertaken in March 2019 Due to lack of rain only 3 sites sampled – no flow onto the site. Next sample round June 2019 Total Nitrogen for T1 is below the trigger. Levels in the dam fluctuate with rain Marulan south cr

  25. Slide 25: Surface water

    Agenda item 6 – Environmental Performance Surface water Total dissolved solids below trigger Turbidity below trigger 25

  26. Slide 26: Surface water

    Agenda item 6 – Environmental Performance Surface water pH within trigger levels Total phosphorus - T1 and the Dam are below the trigger level. 26

  27. Slide 27: Ground water

    Agenda item 6 – Environmental Performance Ground water  No draw down of ground water from sentinel well .i.e. no impact on local groundwater. 27

  28. Slide 28: Ground water

    Agenda item 6 – Environmental Performance Ground water  Monitoring conducted January 2019  Review has been undertaken in regards to the trigger levels  Due to the direction of flow of groundwater towards the pit, trigger levels are not relevant. Ie groundwater flow is very slow and not away from

  29. Slide 29: Environmental flow

    Agenda item 6 – Environmental Performance Environmental flow 29

  30. Slide 30: Heritage

    Agenda item 6 – Environmental Performance Heritage  Announcement of RAP  Next step to fence scar trees 30

  31. Slide 31: Ecology

    Agenda item 6 – Environmental Performance Ecology  40 000m2 area hydro mulched on the southern overburden since the last CCC  Top of the eastern overburden and slopes have been planted approx. 100 000plants  Ecological assessment report received. “The 2019 rehabilitation monitoring identified tha

  32. Slide 32: Stakeholder Engagement

    Agenda item 6 – Stakeholder Engagement  Outward Bound – May 2019  Tallong Apple Day  Partnership in construction of sporting shed at Marulan public school  Kite festival September 2019  CVA program associated with Koala survey in Bungonia national park being planned for September 2019  Marulan

  33. Slide 33: Agenda item 7 – Plans for the next three months

    Agenda item 7 – Plans for the next three months  Safety - Maintain zero harm to our employees and contractors - Focus on pedestrian and vehicle interactions  Overburden - Completion of the Southern overburden dump by June 2019  Pit update - Continue to head South across the pit floor  Processing

  34. Slide 34: Agenda item 8 – General Business

    Agenda item 8 – General Business  Weather station update - Report now available for the relocation of the weather station - current weather station is compatible with the real time noise monitoring but will require an upgrade - Weather station has bee relocated  Real Time noise monitoring - Contra

  35. Slide 35: General Business – Marulan South Limestone update

    Agenda item 8 – General Business  Marulan South Limestone update  Formal public exhibition period has occurred.  60 plus Submissions made to DPE triggering IPAC review process  RTSE being prepared as per DPE direction  Public meeting held with Tallong representatives to discuss Tallong Dam Wate

  36. Slide 36: General Business – Peppertree Quarry Modification

    Agenda item 8 – General Business  Peppertree Quarry Modification 5 - draft conditions of consent of been received. 36

  37. Slide 37: General Business – Next meeting dates

    Agenda item 8 – General Business  Next meeting dates – - August 2019 37

  38. Slide 38: Slide 38