Breitburn Energy Partners LP — Presentation (May 2017)
146 slides from Breitburn Energy Partners LP's investor presentation, May 25, 2017
Slide 1: Preliminary Discussion Materials
CONFIDENTIAL PRELIMINARY DISCUSSION MATERIALS Highly Confidential Subject to FRE 408 Subject to Express Confidentiality Agreement BREITBURN ENERGY PARTNERS LP INCLUDES APRIL 19, 2017 PRESENTATION AND SUBSEQUENT SUPPLEMENTAL MATERIALS
Slide 2: Confidential disclaimer
CONFIDENTIAL None of Breitburn, Lazard Frères & Co. LLC (“Lazard”) and Alvarez & Marsal North America, LLC (“A&M”), and each of their subsidiaries, affiliates, officers, directors, shareholders, employees, consultants, advisors, agents and representatives of the foregoing (collectively, “Representat
Slide 3: Agenda
CONFIDENTIAL OVERVIEW Agenda Introductions Overview • Corporate Overview and Operations Organization • Portfolio Modeling – Strategic to Tactical • BBEP Asset Base Regional Reviews • West Texas Permian Basin – Division 6 • ArkLaTex Upper Gulf Coast Basin – Division 4 • Enhanced Oil Recovery –
Slide 4: Attractive Assets in Producing Areas
CONFIDENTIAL ATTRACTIVE ASSETS IN 7 PRODUCING AREAS ARK-LA-TEX 2016 Avg. Daily Production 10,587 Boe/d Est. Proved Reserves 34.4 MMboe SOUTHEAST 2016 Avg. Daily Production 4,782 Boe/d Est. Proved Reserves 13.5 MMboe MI/IN/KY 2016 Avg. Daily Production 7,956 Boe/d Total Proved Reserves 41.1 MMboe MID
Slide 5: Disciplined capital spending
CONFIDENTIAL As market conditions continually deteriorated over the last two years, the company has maintained disciplined capital spending programs. Budgeting decisions have been influenced by critical factors such as: liquidity conservation, dynamic project economics and preservation of vested cor
Slide 6: Organizational changes and cost reduction
CONFIDENTIAL Organizational structural changes placed the company’s best managers in a position to have maximum impact. The assets were broken into smaller divisions grouping together those with complimentary technical characteristics. Employees met the challenge of changing emphasis from intense ca
Slide 7: Portfolio Management
CONFIDENTIAL PORTFOLIO MANAGEMENT • What is Portfolio Management? – A strategic planning process that efficiently models the impact of resource allocation on corporate performance – A methodology to compare the relative attractiveness and trade-offs of alternative investment scenarios • How do we us
Slide 8: Possible Opportunities
CONFIDENTIAL POSSIBLE OPPORTUNITIES • BBEP has a sizeable inventory of potential projects • Projects have been matured to varying states of readiness pg. 8 OPERATED PROJECT TYPE PERMIAN ARKLATEX EOR CALIFORNIA EASTERN ROCKIES Total CONVERT TO INJECTION - - 4 1 35 9 48 DC&E - HORIZONTAL 415 72 - - 17
Slide 9: Corporate Portfolio Modeling
CONFIDENTIAL CORPORATE PORTFOLIO MODELING Key model characteristics • Self-funding after 2018 • Investment of $3.4B over 10 yr period (60% of inventory) • Grows operating cash flow by 2.8x over 10-yr horizon Extended date of emergence restricts capital spending in front years • 2017 budget set bas
Slide 10: 2017 Operating Plan Projection
CONFIDENTIAL 2017 OPERATING PLAN PROJECTION (1) (1) Based on company operating projections and Jan 25, 2017 market strip pricing. Totals exclude East TX SWD and Postle condensate purchases NET BOE (BBEP) CAPITAL (BBEP) LEASE OPERATING EXPENSE (BBEP) NET FREE CASHFLOW (BBEP) pg. 10
Slide 11: 2017 Post-Emergence Capital Plan
CONFIDENTIAL 2017 POST-EMERGENCE CAPITAL PLAN ASSUMES JULY 1 EMERGENCE Area 2017E ($MM) Commentary Permian – Eastern Midland Basin $48 • Begin horizontal Wolfcamp / Spraberry development; first rig in July and second in January 2018 • Complete successful overhaul of artificial lift systems on vertic
Slide 12: West Texas Permian Divisions II & VI
CONFIDENTIAL WEST TEXAS PERMIAN DIVISIONS II & VI
Slide 13: Permian Basin Overview
CONFIDENTIAL PERMIAN BASIN OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 3.4 55.0 59.1 2018 4.8 163.8 63.9 2019 6.9 264.2 70.8 2020 10.1 255.2
Slide 14: Permian Basin Development Acreage
CONFIDENTIAL PERMIAN BASIN DEVELOPMENT ACREAGE • As of 12/31/2016, Breitburn held ~130,000 gross (~90,000 net) acres in the Permian Basin. Key leaseholds include: Howard & Martin Counties • ~10,100 net acres in highly contiguous, horizontal operated positions in Howard and Martin County • ~7,400 net
Slide 15: Eastern Midland Basin Overview
CONFIDENTIAL Howard Co., TX EASTERN MIDLAND BASIN OVERVIEW • Spraberry Trend Acreage – Total Acreage (including vertical/wellbore only & HZ rights): 26,047 gross / 22,541 net – Total HZ Acreage: 20,703 gross / 17,502 net – operated HZ Acreage: 10,310 gross / 10,080 net • 5.5 MBoe/d of Q4 2016 net pr
Slide 16: Industry Activity Around Breitburn Acreage
CONFIDENTIAL INDUSTRY ACTIVITY AROUND BREITBURN ACREAGE Martin Howard Crownquest - Gratis 32-R 1HB Lateral Length: 9,953’ IP/IP30 (Boe/d): 1,343/1,063 Callon– Garrett Unit 37-48 3SH Lateral Length: 6,901’ IP/IP30 (Boe/d): 882/682 Surge - Elrod-Antell Unit A 11-02 4SH Lateral Length: 6,676‘ IP/IP30 (
Slide 17: Horizontal Midland Basin Development
CONFIDENTIAL 1) Includes Jo Mill Sand, Middle Spraberry, Wolfcamp D/Cline, and a second row of infill wells in the Wolfcamp A and the Lower Spraberry 2) $50 Flat Pricing, 2-Stream wellhead EUR 3) 1.5 mile lateral drilled off-lease, 7,700’ perf-to-perf HORIZONTAL MIDLAND BASIN DEVELOPMENT Lower Sprab
Slide 18: Land Position – Initial Target Area
CONFIDENTIAL LAND POSITION – INITIAL TARGET AREA 2017 Plan Wells – Initial Target Area (1) 2014 October 2016 Budget 2017 Plan (2) With Acreage in Advanced Negotiations (3) Average WI 73% 85% 95% 92% Gross Well Count 44 189 180 216 Two Mile Well Count 0 15 63 126 Net Lateral Length (thousand feet) 22
Slide 19: Martin & Howard County Drilling Blocks
CONFIDENTIAL MARTIN & HOWARD COUNTY DRILLING BLOCKS • 3 new BOLP horizontal drilling blocks created through trades completed / pending trades to date • 4 additional horizontal drilling blocks created through identified trades in progress by YE 2017 • 6 OBO horizontal drilling blocks currently commit
Slide 20: Primary Development Area Stratigraphy
CONFIDENTIAL U. Spraberry Shale Clear Fork L. Spraberry Shale Dean Wolfcamp A Wolfcamp B Wolfcamp C Cline Jo Mill Sand M. Spraberry Shale U. Spraberry Sands PRIMARY DEVELOPMENT AREA STRATIGRAPHY System Series Formation San Andres, GlorietaGuad. Cisco Canyon Strawn Bend (Atoka) Woodford Kinderhook Mi
Slide 21: Stratigraphic Cross-Section B-B'
CONFIDENTIAL Key Points Reservoirs are present across acreage ─ 300-350’ of proven Lower Spraberry ─ 200-275’ of proven Wolfcamp A ─ 225’-300’ of proven Wolfcamp B Thickness and stratigraphic position of carbonate beds vary, present in other areas that are being developed STRATIGRAPHIC CROSS-SEC
Slide 22: Development Plan Supported by Subsurface Model
CONFIDENTIAL DEVELOPMENT PLAN SUPPORTED BY SUBSURFACE MODEL Key Points Technical data includes: logs, cores and 2D seismic data ─ 590 wells with digital triple-combo data ─ Member of Core Lab’s Midland Basin consortium ─ Cored 800’ of section from Lower Spraberry into the Wolfcamp B in the Beall U
Slide 23: Lower Spraberry Type Curve Locator Map
CONFIDENTIAL LOWER SPRABERRY TYPE CURVE LOCATOR MAP Martin Howard Wilbanks SN 16-15 #501H Gunslinger Unit L #4H Hamlin 19-30 #1H Smith SN 48-37 #502H Wright Unit 44-41 #3H Fryar Unit A 13-12 #3SH Clark Unit ‘B’ 24-13 #7SH Shroyer-Wilson Unit 23-14 #3H Wright Unit 41-32 #1SH Fryar Unit B 13-12 #5SH C
Slide 24: Lower Spraberry Type Curve
CONFIDENTIAL LOWER SPRABERRY TYPE CURVE ESTIMATED Lower Spraberry – Normalized to 7,700’ EUR Oil (MBo) EUR Gas (MMcf) EUR NGL’s (MMcf) EUR 3-stream (MBoe) Type Curve(1) 705 389 93 862 (1) EUR’s based on $50 Flat Price Deck. Key Points 19 offset analog wells Normalized to 7,700’ simulated length
Slide 25: Wolfcamp A Type Curve Locator Map
CONFIDENTIAL Operated Acreage Non-Operated Acreage WOLFCAMP A TYPE CURVE LOCATOR MAP Smith SN 48-37 #101H Wolfe McCann Unit 10-15 #2H Garrett Reed Unit 37-48 #4H Garrett Snell Unit B 36-25 #4H Wilbanks SN 16-15 #103H Hamlin-Middleton Unit 16-21 #1H Clark Unit B 24-13 #6H Clark Unit 24-13 #1H Adams H
Slide 26: Wolfcamp A Type Curve
CONFIDENTIAL WOLFCAMP A TYPE CURVE ESTIMATED Wolfcamp A – Normalized to 7,700’ Vintaged to only include wells completed after September 2015 EUR Oil (MBo) EUR Gas (MMcf) EUR NGL’s (MBNGL) EUR 3-stream (MBoe) Type Curve(1) 750 488 116 948 Key Points 15 analog offset wells ─ vintaged to include well
Slide 27: Wolfcamp B Type Curve Locator Map
CONFIDENTIAL Operated Acreage Non-Operated Acreage WOLFCAMP B TYPE CURVE LOCATOR MAP Wilbanks SN 16-15 #101H Hamlin 20-29 #1H Smith SN 48-37 #202H Middleton 47-38 #1H Hamlin 19-18 #1H Hamlin Unit 1522 #3H Mozetti 37-48 #1H Wright Unit 40-33 7BH Reed 1 A-1WB Phillips-Hodnett Unit 1WB Gratis 32-R 1HB
Slide 28: Wolfcamp B Type Curve
CONFIDENTIAL WOLFCAMP B TYPE CURVE ESTIMATED Wolfcamp B – Normalized to 7,700’Key Points Type curve derived by fitting to the average oil production of analog offset wells and accounting for recent improved performance. Normalized to 7,700’ simulated length Decline Parameters ─ IP = 957 Boe/d
Slide 29: OOIP and Recovery Factor
CONFIDENTIAL Locator Map Type Log: Fred Phillips 19 #2 OOIP AND RECOVERY FACTOR Key Points LS WC A WC B OOIP (MMBo/960 Acres) 53 57 45 TC EUR Oil (MBo) 705 751 522 Recovery Factor (%) 8% 8% 7% Recovery Factor Based on 6 Well / 960 Acres (880’ Spacing)LS WC A WC B Depth (TVD ft) 7,600 8,000 8,200 Gro
Slide 30: Horizontal Inventory Spacing
CONFIDENTIAL HORIZONTAL INVENTORY SPACING 6 3 4 0 ’ 1 5 0 ’ 2 2 5 ’ 2 6 0 ’ De-Risked Bench Lower Spraberry Shale Wolfcamp A Wolfcamp B Base Upside 5 6 6 6 6 6 6 pg. 30
Slide 31: Wellbore Diagram
CONFIDENTIAL Surface Casing: 13 3/8", 54.5#, K-55, BT&C Hole Size: 17 1/2" set @ 450' 9 5/8" Stage tool @ 4,000' MD Intermediate Casing: 9 5/8", 40#, HCK-55, BT&C set @ 6,150' , 0 degs Hole Size: 12 1/4"" to 6,150' MD (base of Clearfork) Production Casing: Start of Build Section Start of Horizontal
Slide 32: Midland Basin Completions Frac Design Evolution
CONFIDENTIAL MIDLAND BASIN COMPLETIONS FRAC DESIGN EVOLUTION Generation Stg Length Clstr Spacing Avg # Clstrs lbs / ft Cluster / Stage Avg Tot Prop 1 200 – 250 50 – 60’ 150 1000 – 1400 4 – 5 9,000,000 2 200 – 240 50 – 60’ 150 1400 – 1600 4 – 5 11,250,000 3 150 – 180 15 – 40’ 325 1800 – 2200 5 – 8 15
Slide 33: Drilling & Production Corridor
CONFIDENTIAL DRILLING & PRODUCTION CORRIDOR Key Points Maximize productive drain hole length Production Corridors ─ capital efficiencies ─ LOE efficiencies pg. 33
Slide 34: Centralized Production Facilities
CONFIDENTIAL CENTRALIZED PRODUCTION FACILITIES Key Points Facilities Design ─ consolidates 36 wells ─ Significant per-well savings ─ reduces vessel count from 370 to 70 ─ lower electricity costs due to employing primary electrical systems ─ single point monitoring of processes and well operations
Slide 35: Frac Water Management Plan
CONFIDENTIAL FRAC WATER MANAGEMENT PLAN Key Points Frac Pit Water Storage ─ Jo Paul: 450 Mbbls ─ Central: 850 Mbbls ─ McNew: 650 Mbbls ─ Middle Pit: 1,200 Mbbls ─ Total storage: 3,150 Mbbls Frac Water Pipeline Infrastructure ─ 7.4 miles buried 8” line ─ 30 MBWPD transfer capacity Frac Water So
Slide 36: Salt Water Disposal System
CONFIDENTIAL SALT WATER DISPOSAL SYSTEM Key Points Current Salt Water Disposal System ─ SWD pipeline in place ─ 1 operated SWD well ─ 3 tie-ins to 3rd party systems ─ total capacity of 38 MBWPD 2017 Plans ─ drill 2 additional SWD wells ─ increase capacity by 50 MBWPD Lloyd SWD pg. 36
Slide 37: Lease Operating Expense
CONFIDENTIAL Key Points Lease operating expenses based on extensive experience operating across the basin Cost model; - variable: $2.00/bbl - fixed: $13,000 to $8,000 /month Produced water disposal is the primary early LOE cost driver Plan to dispose of produced water in operated SWD wells
Slide 38: Eastern Midland Basin Profile of Development Projects
CONFIDENTIAL PERMIAN EASTERN MIDLAND BASIN ESTIMATED PROFILE OF DEV PROJECTS (ALL 8,400’ AVG DEV LATERAL LENGTH) $0.20 $0.07 $0.23 $0.51 $0.00 $0.20 $0.40 $0.60 $0.80 $1.00 $/$ REVENUE EUR: 882.4 MMBOE Net Rsv 683.5 MMBOE % Oil 81.7 % % Gas 7.5 % WI: 94.94 % BPO % APO NRI: 72.26 % BPO % APO OBO: 20/
Slide 39: Eastern Midland Basin Summary Information
CONFIDENTIAL EASTERN MIDLAND BASIN pg. 39 SUMMARY INFORMATION Overview Operated Producing Wells (1) 355 Net Acreage Developed 11,001 3Q '16 Daily Production Undeveloped 6,501 Oil (bopd) 2,648 Total 17,502 Gas (mcfpd) 8,019 NGL (galpd) 70,594 Ownership Total (boepd) 5,665 Avg. W.I. 84.5% Avg.
Slide 40: CBP/Delaware Basin Overview
CONFIDENTIAL CBP/DELAWARE BASIN OVERVIEW • ~104,300 gross acres / ~67,900 net acres – ~8,700 gross acres / ~5,300 net acres with horizontal potential rights • 4.8 MBoe/d of Q1 2017 net production – 1042 active producing wells • 2017 Capex: $7.5 MM (Assumes July 1 emergence) • M State Drilling – Abo/
Slide 41: M State Lease Development
CONFIDENTIAL M STATE LEASE DEVELOPMENT • 3,000 acre JV with XTO in Lea Co. NM • BPO 100%/75% • APO 65%/56.875% • 180 day continuous development • Primarily Abo, Drinkard, Blinebry • Secondary: Devonian, Glorieta • 2016 Activity – Strong Results • M State 18 & M Fee 21-1 • Continuous improvement incr
Slide 42: M State Lease – Geologic Setting
CONFIDENTIAL M STATE LEASE – GEOLOGIC SETTING Asset Characterization Horizon – Offset Field Gross Oil [MBO] Gross Gas [MMCF] Equivalent [MBOE] Granite Wash - Wantz 78 430 150 Ellenburger – Brunson* 190 605 291 Simpson - Hare/Teague 129 260 172 Montoya - Cary 40 94 56 Fusselman – Brunson* 172 120 192
Slide 43: M State – Operational Trends
CONFIDENTIAL M STATE – OPERATIONAL TRENDS Completions: Proppant Trends • Continued the improvements observed in the M State #18 Well • MSE technology applied to improve drilling efficiency, with similar great results • Cut 40% off previous drilling performance (days) • Resulted in better than 30% re
Slide 44: Quito East Area Geology
CONFIDENTIAL QUITO EAST AREA GEOLOGY pg. 44
Slide 45: Quito East Area Acreage, HZ Targets
CONFIDENTIAL QUITO EAST AREA ACREAGE, HZ TARGETS pg. 45
Slide 46: Wolfcamp Horizontal Type Curve
CONFIDENTIAL WOLFCAMP HORIZONTAL TYPE CURVE (119 WELLS) QUITO EAST AREA – WOLFCAMP HZ POTENTIAL ESTIMATED 10 0 10 00 10 00 0 10 00 00 Oil , bbl /m o Oil - Average curve 10 0 10 00 10 00 0 10 00 00 Oil , bbl /m o 5 10 15 No. of Months Oil Oil, bbl/mo Qual= Oil - 1 Ref= 4/2015 Cum= 0 Rem= 754805 EUR=
Slide 47: East Fuhrman – Glorieta Waterflood Expansion
CONFIDENTIAL EAST_FUHRMAN – GLORIETA WATERFLOOD EXPANSION Phase 1A Phase 1B • Phase 1A – $3.3 MM – (2017) • 2 years to peak rate • 2 Injectors • 4 Recompletions/Workovers • Phase 1B – $11.6 MM • Assumes completion of Phase 1A • 2 years to peak rate • 5 Producers, • 4 Injectors • 4 Recompletions/Work
Slide 48: CBP/Delaware Basin Profile of Development Projects
CONFIDENTIAL PERMIAN CBP/DELAWARE BASIN ESTIMATED PROFILE OF DEVELOPMENT PROJECTS M State Abo/Drinkard Vt M State Glorieta Vt $(1,000) $- $1,000 $2,000 $3,000 $4,000 $5,000 0% 10% 20% 30% 40% 50% 60% $30.00 $40.00 $50.00 $60.00 $70.00 Flat Price per Bbl/Mcf Return Profile ROR, % PV10, $M $1.44 $2.30
Slide 49: CBP/Delaware Basin Summary Information
CONFIDENTIAL CBP/DELAWARE BASIN pg. 49 SUMMARY INFORMATION Overview Operated Producing Wells (1) 619 Net Acreage Developed 64,027 3Q '16 Daily Production Undeveloped 3,857 Oil (bopd) 2,666 Total 67,844 Gas (mcfpd) 8,600 NGL (galpd) 41,602 Ownership Total (boepd) 5,090 Avg. W.I. 84.3% Avg. NR
Slide 50: ArkLaTex U. Gulf Coast Basin Division IV
CONFIDENTIAL ARKLATEX U. GULF COAST BASIN DIVISION IV
Slide 51: ArkLaTex Overview
CONFIDENTIAL ARKLATEX OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 3.3 33.8 45.9 2018 3.8 27.8 43.0 2019 3.6 23.4 43.5 2020 4.3 64.0 46.3 202
Slide 52: ArkLaTex Region Overview
CONFIDENTIAL ARKLATEX REGION OVERVIEW 125K gross, 82K net acres 1,524 Gross Producing wells Q1 2017 Net Production: 9,462 BOED (49% Liquids) 120 wells available for immediate reactivation with higher commodity prices yielding additional 140 BOPD Asset Mix: Low-decline oil and rich gas conden
Slide 53: Overton Overview
CONFIDENTIAL OVERTON OVERVIEW Overton Cotton Valley Taylor Activity Map Overview • Acreage: Approximately 10,000 gross acres, including ~3,000 acres acquired in 2015 • BBEP Q1 2017 Net Production: 3,427 BOED (30% Liquids) • Produces from Cotton Valley, Travis Peak and Pettet • Horizontal Target: Low
Slide 54: Overton Cotton Valley Target Interval
CONFIDENTIAL Previous Overton Operators Targeted Taylor 4 BBEP’s Southern Acreage has limited Taylor 4 but thicker Taylor 3 BBEP Southern Overton wells Typically land in Taylor 3 Micro-seismic surveys and well performance indicate fracs are contacting all intervals in Southern Overton Pote
Slide 55: Overton Horizontal Cotton Valley Type Curve
CONFIDENTIAL Type Curve Parameters • EUR/FT = 1.05 MMCF/FT (Mean) • Oil Yield= 15 BBL/MMCF (remaining locations) • Di: 79% Dmin: 5% b value: 1.1 • Lateral length = 4,865’ • IP: 9.5 MMCFPD • EUR: 5.1 BCF & 77 MBO (Gross) • D&C Cost $4.8MM • Continually seeing cost reductions OVERTON HORIZONTAL COTTON
Slide 56: Overton Cotton Valley Performance
CONFIDENTIAL - 500 1,000 1,500 2,000 2,500 3,000 3,500 - 10,000 20,000 30,000 40,000 50,000 60,000 70,000 01/2014 01/2015 01/2016 01/2017 01/2018 01/2019 D ai ly O il (B O P D ) D ai ly G as ( M C FP D ) OVERTON COTTON VALLEY PERFORMANCE Improved Condensate Yields on Southern acreage Initial Yie
Slide 57: Cotton Valley Taylor Expansion
CONFIDENTIAL COTTON VALLEY TAYLOR EXPANSION Overview Leveraging off of success and experience in Overton Development area Identified prospective areas with Thick Cotton Valley Taylor sands High condensate yield Success acquiring acreage through: Bolt-on acquisitions Farm outs Primary
Slide 58: Hot Link – Horizontal Cotton Valley
CONFIDENTIAL 30 Locations - Type Curve Parameters • EUR/FT = 0.99 MMCF/FT (Risked Mean) • Oil Yield= 30 BBL/MMCF (Mean) • Di: 75.4% Dmin: 6% b value: 1.2 • Lateral length = 6,000’ • Risked Gross IP: 7.8 MMCFPD • Risked EUR: 5.9 BCF & 178 MBO Gross • D&C Cost $5.4 MM Development Capacity • 2017: Prov
Slide 59: Hot Link Taylor Stratigraphic Cross-Section
CONFIDENTIAL HOT LINK TAYLOR STRATIGRAPHIC CROSS- SECTION Hot Link OVERTON (WINDSOR) Limestone Cap Bossier Shale Source W-M 1HLOCATION 2 5 0 ’ 5 0 ’ *Wilkinson-McElroy 1H (South Overton) 30d IP 11.5 MMcf/d & 567 BCPD pg. 59
Slide 60: East Texas Oil Field Overview
CONFIDENTIAL EAST TEXAS OIL FIELD OVERVIEW Discovered in 1930 Production zone: Woodbine Sands at 3,500’ Original oil in place: > 7 billion STB Cumulative production: > 5.5 billion STB Shallow base production decline Low-cost field SWD gathering and reinjection system (ETSWD) Hundreds o
Slide 61: East Texas Oil Field Opportunities
CONFIDENTIAL EAST TEXAS OIL FIELD OPPORTUNITIES Deepenings: 95 ESP upgrades: 100 Future Opportunities (2017 and Beyond) RTP: 71 New drill: 1 Clean Outs: 3 0 1,000 2,000 3,000 4,000 5,000 6,000 G ro ss O il P rod u ction , S TB P D Historical PDP Forecast Wedge Forecast Wells Shut-in Due to
Slide 62: Shongaloo Lower Haynesville Infill Potential
CONFIDENTIAL SHONGALOO LOWER HAYNESVILLE INFILL POTENTIAL Haynesville Sands Type Log • Acreage, Gross/Net: 8,525 / 6,575 acres • WI/NRI: 88/68% • February 2017 net production: 787 BOED (40% liquids) • Produces primarily from the Haynesville Sand • Current spacing >70 ac (no recent drilling activity)
Slide 63: Shongaloo Upper Haynesville HZ Poss
CONFIDENTIAL SHONGALOO UPPER HAYNESVILLE HZ POSS A B C D UHNVL LHNVL pg. 63
Slide 64: Oak Hill Haynesville Shale Potential
CONFIDENTIAL OAK HILL HAYNESVILLE SHALE POTENTIAL ANADARKO LETOURNEAU #12 Haynesville Shale Bossier Shale CV Taylor Sands Target Interval Haynesville Lime Haynesville Type Log Non-Op Int. OAK HILL AREA Contingent Ac. 2015 Budget Overview - Gross acreage: 4,615 ac - Net acreage: 4,594 ac (HBP) - Aver
Slide 65: Normalized Gas EUR vs Proppant Loading
CONFIDENTIAL HARRISON AND PANOLA COUNTIES NORMALIZED GAS EUR VS PROPPANT LOADING High proppant load wells (15 wells) Filter Settings - County: (HARRISON, PANOLA) - CLL, ft: (2062 <= CLL, ft <= 9555) - Proppant Loading, lbs/CLL: (1008.79 <= Proppant Loading, lbs/CLL <= 10562.67) without empty values
Slide 66: Haynesville Shale Upsized Frac Type Curve Economics
CONFIDENTIAL HAYNESVILLE SHALE EST. UPSIZED FRAC - TYPE CURVE ECONOMICS Upsized Frac Type Curve/ft CLL Cash flow assumptions • Lateral length: 6,000’ • Operating costs • Capital cost: $6.5 MM • Fixed cost: $2,000/month • WI / NRI: 100% / 74% • Water disposal: $0.25/bbl • Shrink: 0.97 (residual) • GT
Slide 67: ArkLaTex Profile of Development Projects
CONFIDENTIAL ARKLATEX ESTIMATED PROFILE OF DEVELOPMENT PROJECTS ETX Cotton Valley Hz ETX Haynesville Hz Shongaloo Haynesville Vt WI*: 100.00 % BPO % APO NRI*: 78.00 % BPO % APO * Varies by area EUR: 1,175.3 MBOE Net Rsv 995.9 MBOE % Oil 14.0 % % Gas 68.6 % $0.06 $0.05 $0.27 $0.62 $0.00 $0.20 $0.40 $
Slide 68: ArkLaTex Summary Information
CONFIDENTIAL ARKLATEX pg. 68 SUMMARY INFORMATION Overview Operated Producing Wells (1) 2,490 Net Acreage Developed 75,599 3Q '16 Daily Production Undeveloped 3,451 Oil (bopd) 3,448 Total 79,050 Gas (mcfpd) 34,310 NGL (galpd) 63,785 Ownership Total (boepd) 10,685 Avg. W.I. 75.1% Avg. NRI 58.9
Slide 69: Enhanced Oil Recovery Division V
CONFIDENTIAL ENHANCED OIL RECOVERY DIVISION V
Slide 70: EOR Overview
CONFIDENTIAL EOR OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 3.2 48.3 69.9 2018 3.3 34.9 76.4 2019 3.2 36.5 78.0 2020 3.0 34.1 78.0 2021 3.1
Slide 71: Division V - EOR Overview
CONFIDENTIAL DIVISION V - EOR OVERVIEW Jay/LEC Unit – 0.30 HCPV Injected N2 flood began in 1981; 101 MMBBL tertiary recover to date Flexible OPEX program Robust PDNP Capital Program (RTP, RTI & CTI) Substantial PUD, PROB & POS drilling opportunities Postle & NEHU –10+ years of developmen
Slide 72: Greater Postle Project Inventory
CONFIDENTIAL GREATER POSTLE PROJECT INVENTORY Project Project Count Capex per Pattern ($M) IP (Bopd) EUR per Pattern (MBoe) ROR $50/bbl Flat Deck PV-10 ($M) NEHU PUD Pattern 6 +20 Probable $1,934 (CO2) 102 190 86% $1,178 Postle Tier 1 PUD Pattern 8 $1,500 DC&C $4,836 (CO2) 82 601 23% $2,800 Postle T
Slide 73: Postle Development Inventory
CONFIDENTIAL * Morrow Sands - Net Isopach Maps – ‘A’, ‘A1’, ‘A2’ ** - New ‘A’ Patterns Include Lease Line and Interior Patterns Flooded ‘A’ / Floodable ‘A’ / Developed (MM STB) (MM STB) (%) HMAU – 59.3 / 59.3 / 100 HMU – 70.9 / 85.3 / 83 PUMU – 44.2 / 44.2 / 100 WHMU – 112.7 / 125.7 / 90 Total – 287
Slide 74: Postle Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 G ro ss Dai ly Pr o d u ctio n ( B OP D ) Postle/NEHU Field Oil Production PUD PNP PDP Historic POSTLE HISTORICAL & PROJECTED PRODUCTION Start Waterflood Start CO2 flood – PUMU, HMAU, WHMU Start CO2 flood - HMU Unit OOIP, MMSTB Primary + Secondary Actuals and Fo
Slide 75: Postle Future Expansion Opportunities
CONFIDENTIAL POSTLE FUTURE EXPANSION OPPORTUNITIES • Sufficient CO2 already available to complete the projects at Postle and N.E. Hardesty • Increased CO2 capacity from Libby Ranch expansion or other contracts means: • Ability to expand CO2 injection to other fields in the area with similar CO2 need
Slide 76: Greater Postle Field Summary Information
CONFIDENTIAL GREATER POSTLE FIELD pg. 76 SUMMARY INFORMATION Overview Operated Producing Wells (1) 248 Net Acreage Developed 32,094 3Q '16 Daily Production Undeveloped - Oil (bopd) 4,330 Total 32,094 Gas (mcfpd) 1,126 NGL (galpd) 38,711 Ownership Total (boepd) 5,440 Avg. W.I. 96.9% Avg. NRI
Slide 77: Jay Project Inventory Estimated Economics
CONFIDENTIAL JAY PROJECT INVENTORY ESTIMATED ECONOMICS Project Project Count Capex per Pattern ($M) IP (Bopd) EUR per Project (MBoe) ROR $50/bbl Flat Deck PV-10 ($M) Jay PDNP 22 +10 Probable $750 75 230 56% $1,117 Jay PUD (no facilities) 12 $4,135 160 637 23% $2,040 Jay PUD (with facilities) 23 +15
Slide 78: Jay Field – 2017 Capital Plan
CONFIDENTIAL Future Drill Wells (35) JAY FIELD – 2017 CAPITAL PLAN ASSUMING JULY 1 EMERGENCE Fraction of Pay - High Reservoir Quality 2014-2015 Drill Wells (5) 2017 Plan Total Reserve IRR @ Capex ($MM) (MBoe) Flat $50 PNP Projects 6.2 2,081 73% PUD Wells 5.8 910 16% Plant & Facility 12.6 2,633 35% T
Slide 79: Jay Historical & Projected Production
CONFIDENTIAL 100 1,000 10,000 100,000 1,000,000 1/ 1 97 0 1/ 1 97 2 1/ 1 97 4 1/ 1 97 6 1/ 1 97 8 1/ 1 98 0 1/ 1 98 2 1/ 1 98 4 1/ 1 98 6 1/ 1 98 8 1/ 1 99 0 1/ 1 99 2 1/ 1 99 4 1 /1 9 9 6 1/ 1 99 8 1/ 2 00 0 1/ 2 00 2 1/ 2 00 4 1/ 2 00 6 1/ 2 00 8 1/ 2 01 0 1/ 2 01 2 1/ 2 01 4 1/ 2 01 6 1 /2 0 1 8
Slide 80: Jay Pattern Maturity
CONFIDENTIAL JAY PATTERN MATURITY 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.00 0.50 1.00 1.50 2.00 2.50 Oil R eco ve ry Fact o r Cumulative Total Injection % of OOIP Jay/LEC Unit Dimensionless Oil Vs. Total Inj % OOIP Pattern 1A Pattern 1B Pattern 2A Pattern 2B Pattern 3A Pattern 3B Pattern 4A Pattern 4B
Slide 81: Greater Jay Field Summary Information
CONFIDENTIAL GREATER JAY FIELD pg. 81 SUMMARY INFORMATION Overview Operated Producing Wells (1) 47 Net Acreage Developed 13,871 3Q '16 Daily Production Undeveloped - Oil (bopd) 3,133 Total 13,871 Gas (mcfpd) 77 NGL (galpd) 13,987 Ownership Total (boepd) 3,479 Avg. W.I. 92.8% Avg. NRI 76.4% E
Slide 82: California San Joaquin & LA Basins Division II
CONFIDENTIAL CALIFORNIA SAN JOAQUIN & LA BASINS DIVISION II
Slide 83: California Overview
CONFIDENTIAL CALIFORNIA OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 1.5 11.4 37.7 2018 1.5 3.5 37.4 2019 1.7 14.0 39.7 2020 1.6 11.1 39.4 20
Slide 84: California Asset Highlights
CONFIDENTIAL CALIFORNIA Asset Highlights Current Development Plan • Concentrated in large oil fields in the Los Angeles Basin and San Joaquin Valley – Company has long history in region with unique operational capabilities – Mature fields (some producing over 100 years) with low risk development opp
Slide 85: Santa Fe Springs Overview
CONFIDENTIAL Highlights SANTA FE SPRINGS OVERVIEW • Field discovered in 1919; 2.0 BBbl OOIP • Peak production in 1920’s was 345,000 Bo/d • Cum oil production 640 MMBo (32%) • BBEP purchased from Texaco in 1999 for $10mm; 1,400 Bo/d and 5.8 mmbo Reserves • 100% operated with 100% WI (~94% NRI) in the
Slide 86: Santa Fe Springs Field Production History
CONFIDENTIAL SANTA FE SPRINGS FIELD PRODUCTION HISTORY Foix,Bell, Meyer Nordstrom,Buckbee,Clark-Hathaway,O’Connell Santa Fe, Bell100 Unitization Waterflood Meyer, Clark-Hathaway (1972) BBEP Purchased Field (1999) pg. 86
Slide 87: Santa Fe Springs Productive Intervals
CONFIDENTIAL SANTA FE SPRINGS PRODUCTIVE INTERVAL(S) • Productive interval consists of 6000’ of massive channelized fan deposits and interbedded sand/shale sequences • Active program exploiting by-passed oil in recompleted wellbores • Drilling potential targeting favorable structure and secondary oi
Slide 88: SFS Drilling Potential
CONFIDENTIAL SFS DRILLING POTENTIAL ESTIMATED Hathaway 200 Isochore Green Outline shows Volumetric Area Red Circles are other potential drill locations Fee Acreage (Exp 4/18) WEST SIDE DRILL POTENTIAL Proposed BH TVD 8500’ (LSF 200) 100% GWI / 81.25% NRI Nordstrom – Secondary Targets (4930’) HW 200
Slide 89: Belridge Drilling Potential
CONFIDENTIAL Belridge Diatomite Oil Isopach Current Spacing Remaining Locations 0 20 40 60 80 100 120 140 160 180 200 1 6 3 1 2 5 1 8 7 2 4 9 3 1 1 3 7 3 4 3 5 4 9 7 5 5 9 6 2 1 6 8 3 7 4 5 8 0 7 8 6 9 9 3 1 9 9 3 1 0 5 5 1 1 1 7 Type Curve Rate Profile G ro ss B OP D Days Post Initial Production 56
Slide 90: Belridge Re-Frac Potential
CONFIDENTIAL BELRIDGE RE-FRAC POTENTIAL A B C D E F G H G1 Original Comp Frac Original Comp Frac Original Comp Frac Original Comp Frac Original Comp Frac Original Comp Frac Proposed Add Frac Interval Proposed Add Frac Interval Proposed Add Frac Interval Belridge Re-Frac Program Adding Frac Intervals
Slide 91: California Profile of Development Projects
CONFIDENTIAL CALIFORNIA EST. PROFILE OF DEVELOPMENT PROJECTS Santa Fe Springs Recomplete Santa Fe Springs Vt Belridge Opal ‘A’ Diatomite Vt $(1,000) $- $1,000 $2,000 $3,000 $4,000 $5,000 0% 10% 20% 30% 40% 50% 60% $30.00 $40.00 $50.00 $60.00 $70.00 Flat Price per Bbl/Mcf Return Profile ROR, % PV10,
Slide 92: California Summary Information
CONFIDENTIAL CALIFORNIA pg. 92 SUMMARY INFORMATION Overview Operated Producing Wells (1) 538 Net Acreage Developed 3,216 3Q '16 Daily Production Undeveloped 41 Oil (bopd) 3,975 Total 3,257 Gas (mcfpd) 831 NGL (galpd) 69 Ownership Total (boepd) 4,115 Avg. W.I. 81.5% Avg. NRI 77.5% Estimated R
Slide 93: Eastern – MI/IN/KY/FL-S Michigan & GC Basins
CONFIDENTIAL EASTERN – MI/IN/KY/FL-S MICHIGAN & GC BASINS DIVISION I
Slide 94: Eastern Overview
CONFIDENTIAL EASTERN OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 3.1 8.7 49.9 2018 3.1 5.7 49.1 2019 3.1 12.2 38.4 2020 2.9 5.8 36.9 2021 2.
Slide 95: Michigan Overview
CONFIDENTIAL MICHIGAN OVERVIEW • Breitburn is the largest gas producer in Michigan and one of the top producers in the Antrim Shale – Other Michigan reservoirs include: Praire du Chien, Richfield, Detroit River Zone III, and Niagaran pinnacle reefs – New Albany shale (IN/KY) • Acreage: 554,205 (gros
Slide 96: MI/IN/KY Summary Information
CONFIDENTIAL MI/IN/KY pg. 96 SUMMARY INFORMATION Overview Operated Producing Wells (1) 1,660 Net Acreage Developed 251,085 3Q '16 Daily Production Undeveloped 12,687 Oil (bopd) 797 Total 263,772 Gas (mcfpd) 41,956 NGL (galpd) 4,894 Ownership Total (boepd) 7,906 Avg. W.I. 65.0% Avg. NRI 52.3%
Slide 97: Rockies – WY/CO Big Horn & Green River Basins
CONFIDENTIAL ROCKIES – WY/CO BIG HORN & GREEN RIVER BASINS DIVISION I
Slide 98: Rockies Overview
CONFIDENTIAL ROCKIES OVERVIEW(1) ASSUMES JULY 1 EMERGENCE Net Production by Phase Net Reserves by Category Operating Plan Annual Projection Operating Plan Production Profile Year Production (MMBoe) CAPEX ($MM) LOE ($MM) 2017 1.9 4.2 20.0 2018 1.9 4.2 18.3 2019 1.8 1.5 18.1 2020 1.7 0.6 17.9 2021 1.6
Slide 99: Rockies Overview
CONFIDENTIAL ROCKIES OVERVIEW • Key basins include – Evanston and Green River Basins in southwestern Wyoming (primarily natural gas) – Big Horn and Wind River basins in central Wyoming (primarily oil) • Acreage: 207,778 (gross) / 112,865 (net) • Interests in 970 productive wells (67% operated) • 11%
Slide 100: Wyoming Waterfloods
CONFIDENTIAL WYOMING WATERFLOODS SW BIGHORN BASIN OIL FIELDS WATERFLOOD PILOT WF CANDIDATE WF CANDIDATE Ferguson Ranch Field • Two active injectors • Waterflood unit in place • Opportunity to expand to full field flood Hunt Field • Not unitized • Offset operator must be addressed Sheep Point Field •
Slide 101: Rockies Summary Information
CONFIDENTIAL ROCKIES pg. 101 SUMMARY INFORMATION Overview Operated Producing Wells (1) 540 Net Acreage Developed 101,452 3Q '16 Daily Production Undeveloped 8,967 Oil (bopd) 2,771 Total 110,419 Gas (mcfpd) 17,079 NGL (galpd) 1,936 Ownership Total (boepd) 5,664 Avg. W.I. 54.2% Avg. NRI 44.2%
Slide 102: SW Florida Division I
CONFIDENTIAL SW FLORIDA DIVISION I
Slide 103: SW Florida Summary Information
CONFIDENTIAL SW FLORIDA pg. 103 SUMMARY INFORMATION Overview Operated Producing Wells (1) 17 Net Acreage Developed 33,322 3Q '16 Daily Production Undeveloped 3,694 Oil (bopd) 1,079 Total 37,016 Gas (mcfpd) - NGL (galpd) - Ownership Total (boepd) 1,079 Avg. W.I. 100.0% Avg. NRI 83.4% Estimate
Slide 104: Supplement A
CONFIDENTIAL SUPPLEMENT A
Slide 105: Permian Acreage Position Evolution
CONFIDENTIAL PERMIAN ACREAGE POSITION EVOLUTION OPERATED HORIZONTAL VS. TOTAL ACREAGE pg. 105 Total Acreage Horizontal Acreage 35% 45% 55% 65% 75% 6,000 8,000 10,000 12,000 YE 2014 YE 2015 YE 2016 April 2017 Pending Operated as % of Total Hz Acrea geAc res Operated Hz Acreage Non-Operated Hz Acreage
Slide 106: Permian Acreage Position Evolution – Operated Net Lateral Feet
CONFIDENTIAL PERMIAN ACREAGE POSITION EVOLUTION (CONT’D) OPERATED NET LATERAL FEET pg. 106 4Q 2015 2Q 2017 Total Operated (1) Total Operated Net Horizontal Locations (3 Primary Benches) 351 146 293 171 Average Net Lateral Well Length (ft.) 7,000 7,000 8,400 8,400 Net Lateral Feet 2,457,000 1,022,000
Slide 107: Permian Acreage Position Detail
CONFIDENTIAL PERMIAN ACREAGE POSITION DETAIL INITIAL ACQUISITION TO PRESENT Total Acreage Horizontal & Vertical/Wellbore Horizontal Development Acreage Retained Vertical/Wellbore Only Acreage Operated Horizontal Development Acreage Percentage Operated Horizontal Development Acreage Non-Operated Hori
Slide 108: Supplement B
CONFIDENTIAL SUPPLEMENT B
Slide 109: Reserve Summary Assumptions
CONFIDENTIAL Reserve Summary Assumptions Pricing: • Reserve summary as of 1/1/17 • 05/19/2017 Strip Pricing (2017 – 2025+): • Oil: $51.05 / $51.02 / $50.27 / $50.53 / $51.37 / $52.57 / $53.88 / $54.72 / $55.26 • Gas: $3.40 / $3.11 / $2.88 / $2.86 / $2.90 / $2.95 / $3.03 / $3.10 / $3.18 / $3.25 / $3.
Slide 110: Supplement C
CONFIDENTIAL SUPPLEMENT C
Slide 111: Acreage by Location
Subject to Express Confidentiality Agreements LOCATION Gross Net Gross Net Gross Net NEW MEXICO – PERMIAN (DIV 2) M State (1) 680.0 680.0 2,360.0 - 3,040.0 680.0 WEST TEXAS – PERMIAN (DIV 2) Coahoma North 320.0 320.0 640.0 640.0 960.0 960.0 East Quito - Vertical (2a) 2,271.1 1,074.3 961.1 578.6 3,23
Slide 112: Supplement D
CONFIDENTIAL SUPPLEMENT D
Slide 113: March Business Plan @ Strip
HIGHLY CONFIDENTIAL SUBJECT TO FRE 408 SUBJECT TO EXPRESS CONFIDENTIALITY AGREEMENTS Breitburn Energy Partners LP March Business Plan @ Strip 1/25/17 ($ in 000s, except as indicated) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 2017 2018 2019 2020 2021 2022 Average Price Assumptions: Oil Average
Slide 114: Supplement E
CONFIDENTIAL SUPPLEMENT E
Slide 115: G&A and District Expense Reduction Efforts & Overview
CONFIDENTIAL G&A AND DISTRICT EXPENSE REDUCTION EFFORTS & OVERVIEW BREITBURN ENERGY PARTNERS LP NOVEMBER 2016 CONFIDENTIAL DRAFT SUBJECT TO FRE 408 DO NOT DISTRIBUTE
Slide 116: G&A Expense
CONFIDENTIAL G&A EXPENSE
Slide 117: G&A right-sizing actions
CONFIDENTIAL Beginning in November 2014, Breitburn’s senior management team moved quickly to right-size the organization in light of the unprecedented deterioration of commodity prices and market conditions Instituted a hiring freeze on December 9, 2014 Achieved ~40% reduction in total G&A positio
Slide 118: G&A Position and Cost Reductions
CONFIDENTIAL G&A Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO 19 (6) 13 (4) 9 (10) CAO 98 (23) 75 (13) 62 (36) CFO 129 (12) 117 (20) 97 (32) COO 40 (9) 31 (10) 21 (19) Subtotal 286 (50) 236 (47) 189 (97) G&A
Slide 119: District Expense
CONFIDENTIAL DISTRICT EXPENSE
Slide 120: District expense reductions
CONFIDENTIAL District expenses are operating costs incurred to manage or supervise the company’s operating assets such that wells, leases, or facilities benefit proportionately. In practice, the company’s technical personnel reporting up to, and including, divisional VPs, who are responsible for day
Slide 121: District Position Reductions
CONFIDENTIAL District Position Reductions Division 4Q 2014 Positions Net Reductions 4Q 2015 Positions Net Reductions 2Q 2016 Positions Total Net Reductions CEO - - - - - - CAO - - - - - - CFO - - - - - - COO 182 (20) 162 (29) 133 (49) Subtotal 182 (20) 162 (29) 133 (49) District Headcount % Change (
Slide 122: G&A and District Forecast Summary
DRAFT - CONFIDENTIAL Breitburn Energy Partners LP G&A and District Forecast Summary - March Business Plan DRAFT ($ 000s) Fcst. Fcst. Fcst. Fcst. Fcst. Fcst. Year Notes 2017 2018 2019 2020 2021 2022 Production (MBOE) (1) 16,371 18,542 20,315 23,712 27,275 30,595 Total Forecast G&A Expense (2) 57,738$
Slide 123: Supplement F
CONFIDENTIAL SUPPLEMENT F
Slide 124: Project: Belridge Diatomite
Project: Belridge Diatomite Target: Opal 'A' Diatomite Division: 1 Type: Drilling ‐ Vertical COO/S: 100% Vital Statistics Identified Inventory: 56 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 83.00 % BPO Gross CAPEX/Well: 650 $M % APO Gross CAPEX/Land‐Facility
Slide 125: Project: ETOF Deepening
Project: ETOF Deepening Target: Woodbine Division: 4 Type: Drill ‐ Deepen COO/S: Vital Statistics Identified Inventory (OP/OBO): 60 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 10 NRI: 87.50 % BPO Gross CAPEX/Well: 125 $M % APO Gross CAPEX/Facility: 0 $M* * Allocated
Slide 126: Project: ETOF RTP
Project: ETOF RTP Target: Woodbine Division: 4 Type: Recomplete ‐ Return to Production COO/S: Vital Statistics Identified Inventory (OP/OBO): 150 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 30 NRI: 87.50 % BPO Gross CAPEX/Well: 70 $M % APO Gross CAPEX/Facility: 0 $M*
Slide 127: Project: Jay Vertical (No Facility)
Project: Jay Vertical (No Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 12 WI: 93.16 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facil
Slide 128: Project: Jay Vertical (Facility)
Project: Jay Vertical (Facility Req.) Target: Smackover Division: 5 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 23 WI: 93.16 % BPO Pot. Unidentified Inventory: 15 % APO Max Projects per Year: 7 NRI: 76.31 % BPO Gross CAPEX/Well: 4,135 $M % APO Gross CAPEX/Facilit
Slide 129: Project: MI Antrim
Project: MI Antrim (Type Curve is 10 Well Package) Target: Antrim (Lachine / Norwood) Division: 1 Type: Drilling ‐ Vertical COO/S: Vital Statistics Identified Inventory (OP/OBO): 36 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 87.50 % BPO Gross CAPEX/Well: 2,10
Slide 130: Project: MI Collingwood-Utica
Project: MI Collingwood‐Utica Target: Collingwood / Utica Division: 1 Type: Drilling ‐ Horizontal COO/S: Vital Statistics Identified Inventory (OP/OBO): 141 WI: 94.73 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 25 NRI: 82.12 % BPO Gross CAPEX/Well: 5,610 $M % APO Gross CAPEX/Fa
Slide 131: Project: M State Abo/Drinkard
Project: M State Abo/Drinkard Target: Abo/Drinkard/Blinebry Division: 2 Type: Drilling ‐ Vertical Vital Statistics Identified Inventory: 23 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 65.00 % APO Max Projects per Year: 10 NRI: 75.00 % BPO Gross CAPEX/Well: 1,900 $M 56.88 % APO Gross CAPEX/Land‐F
Slide 132: Project: Permian-EMB Jo Mill Hz
Project: Permian‐EMB Jo Mill Hz (8,400') Target: Jo Mill (Spby) Division: 6 Type: Drilling ‐ Horizontal COO/S: 38% Vital Statistics Identified Inventory (OP/OBO): 50/183 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % APO G
Slide 133: Project: Permian-EMB Lwr Spraberry Hz NSAI
Project: Permian‐EMB Lwr Spraberry Hz (8,400')‐ NSAI Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,60
Slide 134: Project: Permian-EMB Lwr Spraberry Hz
Project: Permian‐EMB Lwr Spraberry Hz (8,400') Target: Lwr Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %
Slide 135: Project: Permian-EMB Mid Spraberry Hz
Project: Permian‐EMB Mid Spraberry Hz (8,400') Target: Mid Spraberry Division: 6 Type: Drilling ‐ Horizontal COO/S: 48% Vital Statistics Identified Inventory (OP/OBO): 60/124 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M %
Slide 136: Project: Permian-EMB Wolfcamp A Hz NSAI
Project: Permian‐EMB Wolfcamp 'A' Hz (8400') NSAI Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,604 $M
Slide 137: Project: Permian-EMB Wolfcamp A Hz
Project: Permian‐EMB Wolfcamp 'A' Hz (8400') Target: Wolfcamp 'A' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % AP
Slide 138: Project: Permian-EMB Wolfcamp B Hz NSAI
Project: Permian‐EMB Wolfcamp 'B' Hz (8,400')‐ NSAI Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 16 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223
Slide 139: Project: Permian-EMB Wolfcamp B Hz
Project: Permian‐EMB Wolfcamp 'B' Hz (8,400') Target: Wolfcamp 'B' Division: 6 Type: Drilling ‐ Horizontal COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60/202 WI: 94.94 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 18 NRI: 72.26 % BPO Gross CAPEX/Well: 6,223 $M % A
Slide 140: Project: Postle CO2 Pattern Tier 1
Project: Postle CO2 Pattern ‐ Tier 1 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 8 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 98.66 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M 85.86 % APO Gross CAPE
Slide 141: Project: Postle CO2 Pattern Tier 2
Project: Postle CO2 Pattern ‐ Tier 2 Target: Morrow A1/A2 Division: 5 Type: EOR Pattern COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 72 WI: 98.66 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 6 NRI: 85.86 % BPO Gross CAPEX/Well: 1,500 $M % APO Gross CAPEX/Facility/
Slide 142: Project: Santa Fe Springs RCP
Project: Santa Fe Springs RCP ‐ BP3.0 No Risk Target: Bell/Meyer/Nordstrom/Buckbee/Clark/HW Division: 2 Type: Recompletion Vital Statistics Identified Inventory: 65 WI: 100.00 % BPO Pot. Unidentified Inventory: 10 % APO Max Projects per Year: 10 NRI: 93.25 % BPO Gross CAPEX/Well: 150 $M % APO Gross
Slide 143: Project: SW Wyoming Vert
Project: SW Wyoming Vert Target: Frontier/Dakota Division: 1 Type: Drilling ‐ Vertical (Avg. of 3 well groups) COO/S: 100% Vital Statistics Identified Inventory (OP/OBO): 60 WI: 45.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 5 NRI: 35.14 % BPO Gross CAPEX/Well: 2,420 $M % AP
Slide 144: Project: East Texas Hz
Project: East Texas Hz Target: Cotton Valley Taylor Division: 4 Type: Drilling Horizontal *Actual WI will Vary COO/S: 80% Vital Statistics Identified Inventory (OP/OBO): 86 WI*: 100.00 % BPO Pot. Unidentified Inventory: 32 % APO Max Projects per Year: 16 NRI*: 78.00 % BPO Gross CAPEX/Well: 5,440
Slide 145: Project: East Texas Haynesville Hz
Project: East Texas Haynesville Hz Target: Haynesville Division: 4 Type: Drilling Horizontal COO/S: 72% Vital Statistics Identified Inventory (OP/OBO): 40 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 14 NRI: 74.00 % BPO Gross CAPEX/Well: 6,500 $M % APO Gross CAPEX/F
Slide 146: Project: East Texas Haynesville Vt
Project: East Texas Haynesville Vt Target: Haynesville Division: 4 Type: Drilling Vertical COO/S: 70% Vital Statistics Identified Inventory (OP/OBO): 57 WI: 100.00 % BPO Pot. Unidentified Inventory: 0 % APO Max Projects per Year: 12 NRI: 74.37 % BPO Gross CAPEX/Well: 2,369 $M % APO Gross CAPEX/F