  1. Slide 1: Askari VI Project Pre-Bid Meeting

    Askari VI Project Pre-Bid Meeting

  2. Slide 2: Technical

    Technical

  3. Slide 3: Scope Summary

    Scope Summary The scope of the project includes new 132/11kV GIS Grid Station, 132kV interconnecting transmission line in LILO arrangement with KE Network. New Grid Station 132kV Askari VI Interconnection with KE Network 132/11kV Transmission Line 132KV TL – 18.5KM 132 Askari VI Grid 132kV SCADA, Te

  4. Slide 4: 132KV Grid Station Scope of Work

    132KV GRID STATION SCOPE OF WORK

  5. Slide 5: Scope of Work – Grid Station

    Scope of Work – Grid Station The scope of the project includes Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, installation, Erection, Testing, Commissioning, Energization and handing over on turnkey basis of 132/11 kV SAS based locally and remotely (LDC/DRC) operated GIS Gri

  6. Slide 6: 132kV Askari VI Proposed GLO

    132kV Askari VI Proposed GLO 118.05 — i] ae So ie] vos renova fang i : a a 6M WIDE ROAD 15m 6M WIDE ROAD CONTROL BUILDING FIRST FLOOR PLAN (6M WIDE ROAD. ff / / (6M WIDE ROAD ad Jess [esd =a aa ese al /

  7. Slide 7: 132kV Askari VI SLD

    132kV Askari VI SLD Line-1 f EM Future Line-3 "a cp | | it E09 FUTURE BAYS i 3 ay = ++ vis je a3 2 5 i a bo—> — i = ot »® Bed SI ee en em eR aL ts Ps fo > ie ' 2 > A — — | a3 4 ee ee ee ee ey : ¥ ' aE iH ' a &, Dai : melo 8 i re ay i z a 4 1 » A ' bots ' Fe — a 1 ze 1 i : ' a ' wiles aT 8 = 8 fe i 2

  8. Slide 8: 132kV KDA Grid GLO

    132kV KDA Grid GLO PROPOSED LOCATION FOR NEW ASKARI-VI GIS EXTENSION BAY, GIS OUTDOOR CABLE CEILING END NEW HV CABLE TRENCH FOR ASKARI-VI EXTENSION BAY UPTO GRID BOUNDARY WALL

  9. Slide 9: 132kV Memongoth Grid GLO

    132kV Memongoth Grid GLO IPROPOSED LOCATION IN ISWITCHYARD FOR IASKARI-VI LINE IBAY EXTENSION. Gis SF6AIR BUSHING | { NEW ouTDOOR GIS BAY FOR ASKARI-VI Til LI mia “are Lf Jer a GIS SF6 AIR. BUSHING. “PF Pav —P R Y 8 ASKARI-VI1S2KV O/H TIL,

  10. Slide 10: Project Timeline – Grid Station

    Project Timeline – Grid Station Sr. No. Grid Station Firm Project Completion date 1 132kV Askari-VI Grid Station 2 Extension in 132kV KDA Grid Station 24 months from the Effective date Extension in 132kV Memongoth 3 Grid Station

  11. Slide 11: 132KV Transmission Line Scope of Work

    132KV TRANSMISSION LINE SCOPE OF WORK

  12. Slide 12: Scope of Work – 132kV Transmission Line from KDA to Memongoth with LILO at Askari-VI

    Scope of Work – 132kV Transmission Line from KDA to Memongoth with LILO at Askari-VI Survey, Design, Engineering, Manufacture, Supply, Laying, Construction, Installation, Erection, Testing, Commissioning, Energization and Handing over on Turnkey basis of 132kV S/C Transmission Line from KDA Grid Sta

  13. Slide 13: KDA – Askari – Memongoth Transmission Line Route

    KDA – Askari – Memongoth Transmission Line Route

  14. Slide 14: KDA – Askari – Memongoth Transmission Line Key Diagram

    KDA – Askari – Memongoth Transmission Line Key Diagram

  15. Slide 15: Installation of New Towers at Memongoth Grid End

    Installation of New Towers at Memongoth Grid End

  16. Slide 16: Project Timeline – Transmission Line

    Project Timeline – Transmission Line Sr. No Transmission Line Firm Project Completion date 1 KDA-ASKARI-VI-MEMONGOTH TL 24 MONTHS

  17. Slide 17: SCADA Integration at LDC & DRC Scope of Work

    SCADA INTEGRATION AT LDC & DRC SCOPE OF WORK

  18. Slide 18: Scope of Work – SCADA Integration at LDC & DRC

    Scope of Work – SCADA Integration at LDC & DRC Survey, Design, Engineering, Configuration, Execution, upgradation, transfer of images, data entries, creation of SLD in network planner and world map level, World Map graphics, Testing, Commissioning, and Handing over on turnkey basis of SCADA system w

  19. Slide 19: Health, Safety, Environment & Quality

    HEALTH, SAFETY, ENVIRONMENT & QUALITY

  20. Slide 20: Health, Safety, Environment & Quality

    Health, Safety, Environment & Quality It is our duty to promote and comply with the highest standards of Health, Safety, Environment and Quality. The Purpose is to ensure safety of manpower, equipment and strategic installations, apply typical Health, Safety, Environment and Social management relate

  21. Slide 21: Technical Scoring & Eligibility

    TECHNICAL SCORING & ELIGIBILITY

  22. Slide 22: Technical Scoring Criteria – Grids

    Technical Scoring Criteria – Grids TENDERER - SCORE SUMMARY (GRIDS) Vendor Score Obtained Final Score Sr. No Description Weightage (Out of 100) (Out of 60) 1 2 3 4 5=3x4 1 Contractor Eligibility 0 30 0 2 Grids 0 15 0 3 SAS & Scada 0 5 0 4 Telecom 0 5 0 5 Civil 0 5 0 Total 60 0

  23. Slide 23: Technical Scoring Criteria – TL

    Technical Scoring Criteria – TL 132KV ASKARI-VI TRANSMISSION LINE SCORECARD SUMMARY Vendor Score Obtained Final Score Sr. No Description Weightage (Out of 100) (Out of 60) 1 2 3 4 5=3x4 1 Contractor Eligibility 0.00 30 0 2 Overhead Section 0.00 20 0 3 Overhead Section Civil Works 0.00 5 0 4 Undergro

  24. Slide 24: Technical Eligibility Criteria

    Technical Eligibility Criteria S. No. Category Criteria Score Weightage** Cut off Score*** Completed 04 No. similar (or higher voltage level) projects 10 Completed 03 No. similar (or higher voltage level) projects 07 1 * Contractor/JV/OEM - Projects Completed Completed 02 No. similar (or higher volt

  25. Slide 25: Equipment Details in Technical Bid

    Equipment Details in Technical Bid TECHNICAL BID EQUIPMENT MAL SWD (as per specs) and Type Test Reports Job Completion Customer Satisfactory Technical Literature / (As specified in EPCM Supply Records Others Drawings (STL OR ILAC) Certificates Certificates Brochure Criteria Annex C) NOTE: The Criter

  26. Slide 26: Commercial

    Commercial

  27. Slide 27: Key Tender Guidelines

    Key Tender Guidelines Three Separate sealed envelopes to be submitted 1. Financial Eligibility (Financial Statements, Incorporation Document, Compliance Documents) 2. Technical Envelope (Without price) 3. Commercial Envelope Document checklist is mandatory Ensure submission of One original and Three

  28. Slide 28: EPCM

    EPCM Any Tenderer not satisfying the eligibility requirements directly • May form an Association or Joint Venture (Consortium) with a reputable qualified local/foreign contractor OR • May propose qualified local/foreign subcontractors to be eligible to participate in the tender • The Tenderer shall

  29. Slide 29: Financial Eligibility Criteria

    Financial Eligibility Criteria S. No. Financial Eligibility Scorecard Criteria Score The average value of EPCM Contractor's working capital for last three years shall be more than twenty five percent (25%) of the project value and more than thirty percent (30%) of Foreign 10 for 25% of Project value

  30. Slide 30: Commercial Terms of the Contract

    Commercial Terms of the Contract • 45 Days Credit • Advance payment is not preferred. If required, Max 10% of the contract value against Bank Guarantee • Payments through LC is not preferred. If required, LC amount shall be maximum up to 25% of contract Payment Terms value. in case of full or partia

  31. Slide 31: Commercial Scoring Criteria

    Commercial Scoring Criteria S. No. Commercial Scorecard Criteria Weightage 1 Minimum Price 32% 2 Compliance with Contract Terms and Conditions 8% • No LC/ Security Requirement 1% • Performance Bond Against Bank Guarantee 2% • Defects Liability Period* 1.5% • Extended Warranty Period* 1.5% • Other te

  32. Slide 32: Questions?

    QUESTIONS?