Noosa Mining Investor Conference July 2025 PHOTO OF EAST WALL OF TREKELANO OPEN PIT
Slide 2: Statements and Disclaimers
Statements and Disclaimers Competent Persons Statement The information in this document that relates to all exploration results is based upon information compiled by Mr Robert Watkins. Mr Watkins is a Director and shareholder of the Company and a Member of the AusIMM. Mr Watkins consents to the incl
Slide 3: Corporate Overview
Corporate Overview STRUCTURED FOR EXPLORATION SUCCESS CORPORATE STRUCTURE1 BROKER COVERAGE Shares on Issue 228.4M Share Price $0.445 Unlisted Options 4.4M Market Cap $101M SHARE PRICE PERFORMANCE1 Cash Position2 $17.7M $1.00 $0.80 Trekelano New VTEM MAJOR SHAREHOLDERS3 Acquisition and Conductors Mag
Slide 4: ASX Copper Developers and Producers
ASX Copper Developers and Producers A TIGHT SPACE • Numerous single mine developers and producers • Opportunity for consolidation • Carnaby well placed to transition from explorer to producer ASX Copper Producers and Explorers Market Cap (A$M) 425 742 1,513 5,027 240 230 184 99 102 102 92 61 63 64 4
Slide 5: Greater Duchess Copper Gold Project
Greater Duchess Copper Gold Project
Slide 6: Greater Duchess reaches critical mass
Greater Duchess reaches critical mass Trekelano acquisition to add critical inventory at same high grades as the other deposits 1 Material • +27% increase in consolidated Greater Duchess resources to Pro Increase in forma MRE of; Group Resources 27.0Mt @ 1.5% CuEq for 400,000t CuEq1,2 2 • Increased
Slide 7: Trekelano Acquisition Overview
Trekelano Acquisition Overview • Acquisition of 100% of the historical Trekelano mine, located within 20km radius of the Greater Duchess deposits. • JORC 2012 Mineral Resource Estimate: 5.2Mt @ 1.6% CuEq, 85kt CuEq1,2 (1.4% Cu, 0.4g/t Au) • Main Inheritance open pit was not mined to its full extent
Slide 8: Trekelano - Inheritance
Trekelano - Inheritance1 • Historical open pit to ~140m depth • JORC 2012 Mineral Resource Estimate: 2.9Mt @ 1.5% CuEq , 43kt CuEq1,2 (1.3% Cu, 0.3g/t Au) • Significant potential for cut back or underground development • Big unmined drill hits under the historical pit for another ~100m below the pit
Slide 9: Trekelano - Inheritance Cross Sections
Trekelano - Inheritance Cross Sections1 Note 1: Refer to ASX release dated 28 November 2024. 9
Slide 10: Trekelano Mine
Trekelano Mine1 • JORC 2012 Mineral Resource Estimate: 1.5Mt @ 2.0% CuEq, 29kt CuEq1,2 (1.7% Cu, 0.5g/t Au) • Big drill hits open below historical workings1,2: • 8m @ 13.4% CuEq (10.6% Cu, 3.3g/t Au) & 8m @ 4.1% CuEq (3.5% Cu, 0.7g/t Au) • 17m @ 8.6% CuEq (7.2% Cu, 1.7g/t Au) • 15m @ 4.9% CuEq (4.3%
Slide 11: Mount Hope (CNB:100%)
Mount Hope (CNB:100%) AN EXCEPTIONAL IOCG DISCOVERY1 • JORC 2012 Mineral Resource Estimate: 10.3Mt @ 1.7% CuEq, 173kt CuEq1,2 (1.5% Cu, 0.2g/t Au) • Excellent metallurgy – historically mined for quartz flux for the Mount Isa smelter in the 1960’s – early 1970’s • Lodes lengths ~250m, widths ~20m thi
Slide 12: Lady Fanny And Burke & Wills
Lady Fanny And Burke & Wills (CNB: 82.5-100%) NO RECORDED DRILLING PRIOR TO CARNABY1,2 • JORC 2012 Mineral Resource Estimate: 3.1Mt @ 1.5% CuEq, 46kt CuEq1,2 (1.3% Cu, 0.2g/t Au) Note 1: Refer to ASX releases dated 18 September 2023, 27 October 2023, 17 November 2023 & 13 February 2025 12 Note 2: Re
Slide 13: Nil Desperandum (CNB:82.5%)
Nil Desperandum (CNB:82.5%) IP GEOPHYSICS AND GEOLOGY LED DISCOVERY1,2 JORC 2012 Mineral Resource Estimate: 4.3Mt @ 1.4% CuEq, 61kt CuEq1,2 (1.3% Cu, 0.2g/t Au) Including Underground MRE of 1.7Mt @ 2.3% CuEq, 39kt CuEq1,2 (2.0% Cu, 0.4g/t Au) Discovery hole NLDD0441,2: • 41m @ 4.5% CuEq (4.1% Cu, 0.
Slide 14: Project Development
Project Development
Slide 15: Prefeasibility Study in Progress
Prefeasibility Study in Progress ACQUISITION OF TREKELANO HAS THE POTENTIAL TO EXTEND MINE LIFE AND INCREASE THE ANNUAL PRODUCTION TARGET Annual Estimated Mining Production of CuEq Metal by Mining • Scoping Study Results (NOT YET INCLUDING TREKELANO)1,2: Source 30,000 3 • 9-year production target 7.
Slide 16: Greater Duchess Development
Greater Duchess Development LOW CAPEX DIRECT RAIL HAULAGE OPTION1 • Low Estimated Pre-Production Capex: ~A$35M • Carnaby is focussed on a low CAPEX, low risk and low dilutionary third party processing start up to get into production • Toll milling and offtake agreements are in place with Glencore In
Slide 17: Greater Duchess Copper Gold Project
Greater Duchess Copper Gold Project TARGETING A LOW CAPEX START UP AS EARLY AS 20261 • PFS study on track to be completed H2 CY 2025 CY'24 CY'25 CY'26 CY'27 CY'28 CY'29 Work Program H2 H1 H2 H1 H2 H1 H2 H1 H2 H1 H2 • Resource extension and infill drilling – completed*. H1 • MRE update – in progress*
Slide 18: Exploration
Exploration
Slide 19: Mount Hope Region (CNB 51-100%)
Mount Hope Region (CNB 51-100%) Exceptional VTEM Conductors Light Up Mount Hope Region1,2 • Mohawk Discovery hole 9 September 20241,2; Jude • 21m @ 2.5% CuEq (2.0% Cu, 0.6g/t Au) • 194 line km VTEM survey completed • >4km Mohawk Corridor, numerous VTEM conductors not yet drill tested • Every VTEM co
Slide 20: Magna Lynn Southern Corridor (CNB:100%)
Magna Lynn Southern Corridor (CNB:100%)1 • Structural and stratigraphic corridor over 75 km of strike • New VTEM conductors from Queensland Government funded 435 line km survey • Sparsely explored with little or no historic drilling or soils sampling. • Numerous historical workings. Note 1: Refer to
Slide 21: Rio Tinto Devoncourt Project Farm-in
Rio Tinto Devoncourt Project Farm-in VERY ENCOURAGING SIGNS FROM MAIDEN DRILLING PROGRAM1,2 Wimberu Prospect • Maiden drill program intersected highly encouraging breccia style mineralisation of 17.3m @ 0.54% CuEq (0.46% Cu, 0.09g/t Au)1,2. • Extremely broad 300m - 1,000m hole spacings completed by
Slide 22: Outlook and Value Drivers
Outlook and Value Drivers
Slide 23: Investment Highlights
Investment Highlights Critical Mass Reached 27.0Mt @ 1.5% CuEq for 400,000t CuEq1,2 • Binding Tolling and Offtake Agreements Processing Solution & with Glencore International AG. Development Pathway • PFS on track to be completed in H2CY25 400,000t CuEq1,2 tonnes of high grade mineral Exploration Up
Slide 24: Office Contact
Office Contact 78 Churchill Avenue P +61 8 6500 3236 SUBIACO WA 6008 E info@carnabyresources.com.au
Slide 25: Appendix: Mineral Resource Inventory
Appendix 1 Carnaby Resources Limited Greater Duchess Copper Project - Cu Equivalent Cut-off1 Mineral Resource Inventory as at 27 November 2024 Indicated Inferred Total COG Deposit Tonnes Cu Au CuEq Cu Au CuEq Tonnes Cu Au CuEq Cu Au CuEq Tonnes Cu Au CuEq Cu Au CuEq CuEq% Mt % g/t % t oz t Mt % g/t