Yari Minerals — Corporate Update (May 2020)

19 slides from Yari Minerals's corporate update, May 21, 2020

  1. Slide 1: Plomosas Position and Potential – Shareholder Update 21 May 2020

    PLOMOSAS POSITION AND POTENTIAL SHAREHOLDER UPDATE 21 MAY 2020 consolidatedzinc.com.au |

  2. Slide 2: Ready to Restart – Mining and Exploration

    READY TO RESTART – MINING AND EXPLORATION Successfully Operations paused Operations Exciting gold Targeting growth transitioned to by COVID-19 optimised during exploration results from surface gold owner operating downtime, opening exploration and mining Restarted 18 May up more stopes. Significant

  3. Slide 3: Gold Exploration – Results and Plans

    GOLD EXPLORATION – RESULTS AND PLANS • First systematic gold exploration program undertaken in the area • Gold exploration completed in north western tenement areas • Including 94 samples over 2 campaigns • Widespread gold bearing structurally controlled system identified • Chona-Enrique vein system

  4. Slide 4: Gold Exploration Potential at Plomosas

    GOLD EXPLORATION POTENTIAL AT PLOMOSAS EXPLORING 7KM WITHIN CURRENT LEASES consolidatedzinc.com.au |

  5. Slide 5: Plomosas Gold Prospects and Exploration

    PLOMOSAS GOLD PROSPECTS AND EXPLORATION 1500m consolidatedzinc.com.au |

  6. Slide 6: Potrero Prospect Area

    POTRERO PROSPECT AREA 600m Note: Excised means concession area not owned by MLAZ consolidatedzinc.com.au |

  7. Slide 7: Chona–Enrique Vein Systems

    CHONA –ENRIQUE VEIN SYSTEMS 300m 400m Note: Chona – Enrique are 420m apart along strike consolidatedzinc.com.au |

  8. Slide 8: Highlights of Anomalous Gold and Copper Rock Chip Sampling

    HIGHLIGHTS OF ANOMALOUS GOLD AND COPPER ROCK CHIP SAMPLING Project Sample No Sample Type Rock type Au (g/t) Cu % Zn % Ag (g/t) Pb % Chona- Enrique prospect 38158 Selected Vein 4.77 4.06 0.00 3.80 0.00 Chona- Enrique prospect 38160 Selected Vein 27.50 2.19 0.00 4.10 0.00 Chona- Enrique prospect 38161

  9. Slide 9: Plomosas Mine, Mexico

    PLOMOSAS MINE, MEXICO consolidatedzinc.com.au |

  10. Slide 10: Operations – Production and Optimisation

    OPERATIONS– PRODUCTION AND OPTIMISATION • Mine site repairs and maintenance undertaken during lockdown • Plant maintenance works to optimise the plant performance • ~10,000 tonnes ore mined and processed Q1 2020 • Q1 2020 cash costs US$1.05/lb zinc down 29% from Q4 2019 • Operating costs down 20% fr

  11. Slide 11: Plomosas Mine Geology & Mineralisation

    PLOMOSAS MINE GEOLOGY & MINERALISATION Zinc and lead sulphide mineralisation is contained within carbonate-rich units such as limestones and marbles within a large basinal sedimentary sequence. Mineralisation preferentially replaces the carbonate so multiple stacked limestone sequences are highly pr

  12. Slide 12: Plomosas Silver Lead Zinc Mine Layout

    PLOMOSAS SILVER LEAD ZINC MINE LAYOUT Extensive underground access to 360 360m metres below surface (mbs) - in good condition for mining and exploration drilling Haulage via decline capacity up to 350t/d Stoping progressing on Level 7: 4 stopes and SOX from Level 7 Development works for 12 months st

  13. Slide 13: Base Metal Infill Drilling Excellent Results

    BASE METAL INFILL DRILLING EXCELLENT RESULTS : Reference CZL announcement 30 January 2020 consolidatedzinc.com.au |

  14. Slide 14: JORC (2012) Mineral Resource as Depleted December 2019

    JORC (2012) MINERAL RESOURCE AS DEPLETED DECEMBER 2019 Indicated Mineral Resource Prospect Tonnes %Zn %Pb g/t Ag Zn tonnes Pb tonnes Ag oz Level 7 107,000 19.7 9.5 557.7 17,000 8,000 157,000 Tres Amigos 42,000 7.7 2.3 12.0 3,000 1,000 16,000 Tres Amigos North 38,000 7.8 3.6 13.1 3,000 1,000 16,000 S

  15. Slide 15: Corporate Overview

    CORPORATE OVERVIEW CAPITAL STRUCTURE (PRE-ENTITLEMENT ISSUE) Share price A$0.004 Market Capitalisation A$6.9M 100% CONSOLIDATED ZINC LTD Shares on Issue 1,725,933,313 Options on Issue 123,283,882 Performance Rights 129,750,000 Cash & Accounts Receivable (31/03/20) US$2.2M Debt & Con Notes (31/03/20)

  16. Slide 16: Directors and Management

    DIRECTORS AND MANAGEMENT LED BY A TEAM OF HIGHLY SUCCESSFUL, EXPERIENCED MINING PROFESSIONALS CHAIRMAN NON-EXECUTIVE DIRECTOR Mr Andrew Richards Ms Angela Pankhurst • Over 30 years’ experience as a a geologist in exploration, mine • 20 years experience as executive and non-executive director with a

  17. Slide 17: Social Responsibility

    SOCIAL RESPONSIBILITY CZL HAS UNDERTAKEN ACTIVITIES IN: Providing water to long-term residents in the Chihuahua Desert Assisting with waste management for local community Falomir Maintaining the access road Sustainable projects with Falomir mayor Supporting local ranchers CZL IS WORKING WITH LOCAL G

  18. Slide 18: Important Information

    IMPORTANT INFORMATION FORWARD-LOOKING STATEMENTS AND INFORMATION mineral resources or that the production target itself will be realised. The stated production target is based on the Company’s current expectations of future results or events and should This report contains forward looking statements