Slide 3: Highlights
Highlights • Underground Scoping Study underway on the High-Grade Tin-Tungsten Resource at the Mount Lindsay Project, Tasmania; • Recent improving Iron Prices sees opportunity to reopen Riley Iron Ore Mine - potential funding mechanism for Mount Lindsay; • VMS (Volcanogenic Massive Sulfide) system c

Slide 4: Corporate Snapshot
Corporate Snapshot Summary Capital Raising History ASX Code: July 2018 Two Tranche Placement of 85.1m shares at VMS A$0.03 for A$2.5m; September 2017 Placement of 95m shares at A$0.02 for A$1.9m; Shares on issue: December 2015 Rights Issue of 28.7m shares at A$0.023 for 520.6m A$0.7m; August 2012 Pl

Slide 5: Directors and Key Management
Directors and Key Management A dedicated management team with a wealth of experience and credited with a number of discoveries both in Australia and internationally Mel Ashton Hamish Halliday Andrew Radonjic Dr Stuart Owen Non-Executive Chairman Non-Executive Director Managing Director Exploration M

Slide 6: Project Locations
Project Locations Golden Caesar Grove North Project Project Cu- Ni- Cu Zn-Au North West Tasmanian Projects Mt Lindsay Tin- Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Kulin Project PGE -Ni – Cu Venture Minerals | RIU Explorers Conf

Slide 7: Is Tin the forgotten EV Metal?
Is Tin the forgotten EV Metal? Venture Minerals | RIU Explorers Conference Presentation | February 2019 7

Slide 8: Market drivers of future tin demand
Market drivers of future tin demand Computing and Energy robotics Tin focus: Solder used Generation & in mobile phones, computers, Infrastructure Tin focus: Solar cells, tablets and electronic thermoelectric materials Industry developments: Industry developments: technologies • Measurable impacts of

Slide 9: Current primary uses of Tin
Current primary uses of Tin Tin use in While solder The two most lead-acid Nearly 50% of drives the significant batteries tin consumed current uses of tin for doubled is in lead-free market, EV impact is between 2010 solder by the significant in electronics to 2016 and is consumer growth is in and a

Slide 10: Tin use in conventional combustion vehicles
Tin use in conventional combustion vehicles SEAT GLASS CUSHIONS Conductive tin PLASTICS coatings Tin catalyst SEALANTS PVC stabilisers ELECTRONICS Tin catalyst Solders Fuses Contacts BATTERY FUEL TANK Tin alloy addition Tin-zinc coating RADIATOR Brass alloys solder WIRING Tinned copper BEARINGS Tin

Slide 11: Two most significant uses for EV impact
Two most significant uses for EV impact: ELECTRONICS Solders Fuses Contacts BATTERY Tin alloy addition Venture Minerals | RIU Explorers Conference Presentation | February 2019 11

Slide 12: Tin Market Outlook
Tin Market Outlook • Tin today at over US$21,000/t or A$29,000/t but has missed the dramatic rises of its EV metal peers in lithium, cobalt & graphite; • Visible Tin Stocks near lows. Venture Minerals | RIU Explorers Conference Presentation | February 2019 Source: International Tin Association 12

Slide 13: World Tin Production
World Tin Production • Supply issues with most of the world’s largest tin producers actually producing less; • Most world tin production still coming from higher risk jurisdictions. Venture Minerals | RIU Explorers Conference Presentation | February 2019 13

Slide 14: Location of Mount Lindsay Tin-Tungsten Deposit
Location of Mount Lindsay Tin-Tungsten Deposit Venture Minerals | RIU Explorers Conference Presentation | February 2019 14

Slide 15: EV Metal Demand, time to re-assess Mount Lindsay
EV Metal Demand, time to re-assess Mount Lindsay • EV demand drives re-assessment of the high grade tin and tungsten resource base at Mount Lindsay. • Uniquely positioned with Mount Lindsay being one of the largest undeveloped tin projects in the world, containing in excess of 80,000* tonnes of tin

Slide 16: Resource Statement – Mount Lindsay Tin-Tungsten Project
Resource Statement – Mount Lindsay Tin- Tungsten Project (as previously announced 17 October 2012) Reporting to two significant figures. Figures have been rounded and hence may not add up exactly to the given totals. Note: Full details of the estimate are in the ASX release for the Quarterly Report

Slide 17: Mount Lindsay Tin-Tungsten Project Highlights
Mount Lindsay Tin-Tungsten Project Highlights • Approximately 83,000m of diamond core drilling used to define JORC compliant resources with +60% in the Measured & Indicated categories; • Feasibility Study completed with comprehensive metallurgical test- work, with further post feasibility test-work

Slide 18: High Grade Tin-Tungsten Targets
High Grade Tin-Tungsten Targets Venture Minerals | RIU Explorers Conference Presentation | February 2019 *Source: MLX Corporate Presentation 2 18

Slide 19: Mount Lindsay Going Forward
Mount Lindsay Going Forward • Underground Scoping Study is underway looking at mining the Higher Grade portions of the Main and No.2 Skarns being respectively the MacDonald and Radford Shoots; • Underground access to be located further down the side of Mount Lindsay. All waste material to be replace

Slide 20: Location of Riley & Livingstone Hematite DSO Deposits
Location of Riley & Livingstone Hematite DSO Deposits Venture Minerals | RIU Explorers Conference Presentation | February 2019 20

Slide 21: Riley DSO Deposit
Riley DSO Deposit Immediately accessible Ore Reserves of 1.8mt @ 57% Fe with low impurities*. PAGE 3 nture Minerals | RIU Explorers Conference Presentation | February 2019

Slide 22: Riley DSO Hematite Project – review underway to restart mine operations
Riley DSO Hematite Project – review underway to restart mine operations. • Riley is a fully permitted Iron Ore Mine that is positioned to recommence operations within a very short period of time; • The current price is now more than 20%* higher in AUD terms than it was upon closing. Since last Decem

Slide 23: Riley DSO Hematite Project – Resources & Reserves
Riley DSO Hematite Project – Resources & Reserves. Resource Statement - Riley DSO Project Resour Tonn Fe Fe (%) SiO2 Al2O3 P S LOI ce es (%) Calcined (%) (%) (%) (%) (%) Indicate 0.0 2.0mt 57 61 3.7 2.6 0.03 7.7 d 8 Reserve Statement - Riley DSO Project Tonne Fe Fe (%) SiO2 Al2O3 S LOI Reserve P (%)

Slide 24: Project Locations
Project Locations Golden Caesar Grove North Project Project Cu- Ni- Cu Zn-Au North West Tasmanian Projects Mt Lindsay Tin- Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Kulin Project PGE -Ni – Cu Venture Minerals | RIU Explorers Conf

Slide 25: South West Project – Location Map
South West Project – Location Map • Venture holds a 281 km² land holding within the Greenbushes Mineral District host to the world’s largest hard rock lithium mine (produces ~40% of the worlds-lithium); • Several VMS (Volcanogenic Massive Sulfide) targets identified including the Thor Prospect; • Su

Slide 26: Thor Prospect – Geochemical Target & Historic Drill Core
Thor Prospect – Geochemical Target & Historic Drill Core • Large geochemical New Thor VMS style target prospect hosting large identified from Historic drill VMS Style surface sampling; core containing Target VMS Style • Massive sulfides Massive identified in historic sulfides drill core near Thor Ta

Slide 27: Thor Prospect – Thor & Kingsley Bi laterite soil contours
Thor Prospect – Thor & Kingsley Bi laterite soil contours on VTEM flown in 2005 New Thor prospect Historic Kingsley hosting large prospect hosting VMS Style VMS Style Massive Target sulfides Venture Minerals | RIU Explorers Conference Presentation | February 2019 27

Slide 28: Massive Sulfide in Core from Maiden Drilling at the Thor Prospect
Massive Sulfide in Core from Maiden Drilling at the Thor Prospect Venture Minerals | RIU Explorers Conference Presentation | February 2019 28

Slide 29: Thor VMS Target with drilling on aeromagnetic image
Thor VMS Target with drilling on aeromagnetic image Venture Minerals | RIU Explorers Conference Presentation | February 2019 29

Slide 30: New Major EM Survey completed at Thor in September 2018
New Major EM Survey completed at Thor in September 2018 Venture Minerals | RIU Explorers Conference Presentation | February 2019 30

Slide 31: Final EM survey results confirm Priority Targets for immediate drill testing
Final EM survey results confirm Priority Targets for immediate drill testing Thor Priority VMS Drill Targets Historic Kingsley VMS Prospect *Reference GSWA Record 2017/9: Metamorphosed VMS Mineralization at Wheatley, Southwest, WA Venture Minerals | RIU Explorers Conference by LY Hassan Presentation

Slide 32: Oblique View of Final EM Survey Results
Oblique View of Final EM Survey Results NORT 20 siemens/metre H shell 50 siemens/metre shell 100 siemens/metre shell 17 metre zone of disseminated, semi massive and massive sulfides Venture Minerals | RIU Explorers Conference Presentation | February 2019 32

Slide 33: Drilling commenced on Priority Targets at Thor
Drilling commenced on Priority Targets at Thor 27 November 2018 Venture Minerals | RIU Explorers Conference Presentation | February 2019 33

Slide 34: Project Locations
Project Locations Golden Caesar Grove North Project Project Cu- Ni- Cu Zn-Au North West Tasmanian Projects Mt Lindsay Tin- Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Kulin Project PGE -Ni – Cu Venture Minerals | RIU Explorers Conf

Slide 35: New Acquisition - Golden Grove North
New Acquisition - Golden Grove North 374 km2 located less than 10 kilometres from the Golden Grove Camp (Mine); 25 strike kilometres of a largely untested, 25km of Prospective prospective sequence VMS Style Endowment Sequence(Resources and for VMS style Production) mineralisation; as of 2002 40.

Slide 36: Project Locations
Project Locations Golden Caesar Grove North Project Project Cu- Ni- Cu Zn-Au North West Tasmanian Projects Mt Lindsay Tin- Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Kulin Project PGE -Ni – Cu Venture Minerals | RIU Explorers Conf

Slide 37: Kulin (formerly Pingaring) Project – Geological Setting
Kulin (formally Pingaring) Project – Geological Setting • One granted exploration licence (312 km²) within the former Pingaring Project which was along strike and immediately south-east of the Quicksilver Ni-Co Discovery; • Now focusing on interpreted layered mafic-ultramafic intrusion near the town

Slide 38: Project Locations
Project Locations Golden Caesar Grove North Project Project Cu- Ni- Cu Zn-Au North West Tasmanian Projects Mt Lindsay Tin- Tungsten, Riley & Livingstone DSO Hematite South West Project Thor Cu-Pb-Zn Prospect & Odin Li & Ni-Cu Prospects Kulin Project PGE -Ni – Cu Venture Minerals | RIU Explorers Conf

Slide 39: Caesar Project - Location Map
Caesar Project - Location Map Double Magic Ni- Cu Prospect (Buxton Resources) Savannah Ni-Cu-Co Mine (Panoramic Resources) Caesar Project Ni-Cu-Co Target Nebo Babel Ni-Cu-Co Prospect (Cassini Resources) Nova Ni-Cu-Co Mine (Independence Group) Venture Minerals | RIU Explorers Conference Presentation

Slide 40: Caesar Project – Surface Geology with Nickel geochem contours, EM & First Drill Hole Results
Caesar Project – Surface Geology with Nickel geochem contours, EM & First Drill Hole Results • EM anomaly coincident with geochemical anomaly; • Both EM & Geochemical anomaly also coincident Priority Drill with gravity high. Target Defined • CSD01 intersected minor disseminated sulfides throughout t

Slide 41: Caesar Project – First Hole Drill also intersects Gold, Silver and Base Metals
Caesar Project – First Hole Drill also intersects Gold, Silver and Base Metals • CSD01 intersected an 18 metre zone of sericite altered meta- sediments with quartz- carbonate-arsenopyrite veining with one metre returning 1.8 g/t gold, 4.6 g/t silver, 806 ppm copper, 578 ppm lead & 655 ppm zinc*; • P

Slide 42: Conclusions
Conclusions Venture is leveraged to multiple commodities and near term production opportunities over numerous projects; Mount Lindsay Tin-Tungsten Project provides exposure to EV metals and near term production; Review underway for restarting the production ready Riley Iron Ore Mine; Maiden

Slide 43: Thank You
Thank You Come and see us at Booth 12. www.ventureminerals.co Venture Minerals | RIU Explorers Conference Presentation | February 2019
Source: Internet Archive copy of ventureminerals.com.au
More decks from Critica Limited
Investor Presentation (October 2026)44 slides · Oct 21, 2026
Ignite Investment Summit 202637 slides · Oct 14, 2026
Investor Presentation (September 2026)19 slides · Sep 30, 2026
Tribeca Future Facing Symposium 202626 slides · Aug 25, 2026
Noosa Mining Conference July 202621 slides · Jul 22, 2026
RIU Resources Round Up May 202620 slides · May 7, 2026