Firepoint Energy Inc. · OTC:FPTE
Firepoint Energy — Crowdfunding (December 2024)
37 slides from Firepoint Energy's crowdfunding presentation, December 2024
Slide 1: Rare Earth Elements
Rare Earth Elements Ce, Dy, Er, Eu, Gd, Ho, La, Lu, Nd, Pr, Sm, Sc, Tb, Tm, Yb, Y
Slide 2: Firepoint CEO sampling waste coal sites across Pennsylvania
In March of 2024, Firepoint Energy CEO Bill Smith started traveling across the state of Pennsylvania. Along the way, he visited waste coal sites, collected samples, and sent them for evaluation by Conti Testing Laboratories in Bethel Park. Our company was interested in learning whether or not the wa
Slide 3: Abandoned Mine Lands in PA
Abandoned Mine Lands in PA Abandoned Mine Lands in Pennsylvania re ae ~— soe ee moe Sere - ~—s _ veyre = - = = MW = = = PS a rszed Sf ot es eae one ne ee % cror ra $ es ee 2 Lengr —e abe pbs HEE Mire Probiem Areas [___] County Boundaries
Slide 4: The Tonnage of Rare Earth Elements in Pennsylvania Waste Coal Sites
The Tonnage of Rare Earth Elements Contained in a Sampling of Pennsylvania Waste Coal Sites Elements SITES BEROO1 BER1 BOY-1 D-C-4 GiL-t ora MH NG-2 NMNe1 RSA SK.WM-2 TONNAGE [Tons [| Tons | TONS | TONS | TONS | TONS | TONS | TONS | TONS | TONS | TONS | TOTAL Cerium (Ce) 5,056.63 2,023.16 1,098.87 4
Slide 5: Sites we have visited and taken samples from
Here are a few of the sites we have visited and taken samples from; Pennsylvania has more than 11,000 waste coal sites. nelton Pilot Site Circled Sites are the locations containing test results that are included in this report.
Slide 6: How to Interpret the Information in This Presentation
How to Interpret the Information in This Presentation This sheet shows the volume of a certain mineral ona mg/kg basis from lab results provided by Conti Labs This spreadsheet shows the value of each element based on the volume of waste coal and ore located on the site, and the dollar value of the m
Slide 7: Tunnelton, Pennsylvania: Firepoint Critical Minerals Site
TUNNELTON, PENNSYLVANIA FIREPOINT CRITICAL MINERALS SITE We have leased 100 acres (November 1, 2024) on the Conemaugh River at the site of an old coal mine. The site also served as a natural gas brine wastewater treatment plant at one time. There are four million tons of waste coal on-site, with whi
Slide 8: Total Estimated Value
TOTAL ESTIMATED VALUE TUN-PA-1 ° ° rae po 4MTon ke low (oxide) | | mg grams Total Yield (tons) kg Refuse Coal yield s/kg Total Supply s/kg Total Supply Cerium (Ce) 157.98 | 3,628,738,960 | _573,268,120,901 573,268,181 573,268 632 $2.15 $1,232,527 $4.50 $2,579,707 Dysprosium (Dy) 7.24 | 3,628,738,960
Slide 9: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day Power Need MW 200,000 548 3 Years to Process 20-40 BPD Gallons paity ANNUALLY 600 25,200 9,198,000 Power Needs 16 Plant Cost $78,000,000 Price P Gallon. Rev p Day Rev p Year s 100,800 "$36,792,000 Fuel
Slide 10: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc. PO Box 174 Bethel Park, PA. 15102 412-833-7766 (0), 41 54-0373 (1) sontilab@contitesting com [PA.DEP Rea 02.0865, <PA PADITI!, WDOBE 12013 WRENC 2005120964 ISONEC 170 Fire Point Energy Inc 1500 N Sam Houston Prkwy E Houston, TX 77032 At: Mr Bil Smith bemith@frepoint
Slide 11: Refuse Coal 55M Ton Total Yield
Refuse Coal 55MTon ke Total Yield low (oxide) I é 2 high (metal) Elements kg Refuse Coal Le Ae yield (tons) S/kg Total Supply $/kg | Total Supply S/kg, Total Supply Cerium (Ce) 80.60 49,895,158,500] 4,023,549,775,100 | 4,021,549,775 | 4,021,550 4,434 $2.15 $8,646,332 $4.50 | $18,096,974 $4.50 | $18,
Slide 12: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day 55,000,000 1,833,333 5,023 Years to Process 20-40 Yrs to Process BPD Gallons DAILY ANNUALLY 6,906 290,068 105,875,000 Power Needs 18.6 Plant Cost © $ 897,832,050 Price P Gallon Rev p Day Rev p Year See
Slide 13: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc: PO Box 174 Bethel Park, PA 15102 412-833-7766 (0), 412-854-0373 (D) contiab@contitestina com PADEP Rea 2.00869 EPA PADIT11, WDBE 12015 WBENC 2005128964 ISOAEC 17025.2097.97577 Fire Point Energy Inc erz6r2024 1800 N Sam Houston Priwy E Houston, TX 77032 Receives: 6/22
Slide 14: Total Estimated Value W-B-1
W-B-1 TOTAL ESTIMATED VALUE R oe 22M Ton kg Total Yield low (oxide) high (metal) kg Refuse Coal a Cilit yield (tons) kg Total Supply $/kg Total Supply $rkg Total Supply Cerium (Ce) 50.600 | 19,958,064,280} 1,009,878,052,568 | 1,009,878,053, 1,009,878 1113 $2.15 $2,171,238 $4.50 $4,544,451 $4.50 $4,5
Slide 15: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day Gasifiers Needed Gasifier Cost Power Need MW [22,000,000 733,333 2,009 40 $ 160,821,918 8 Years to Process 20-40 BPD Gations DAILY ANNUALLY 2.763 116,027 42,350,000 Power Needs 25 Plant Cost —$ ———-389,
Slide 16: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc. PO Box 174 Bethel Park, PA. 15102 412-833-7766 (0), 412-854-0373 (1) PADEP Ren 07.00886 EPA PAD tT11, WOBE 12013 WEENC 2005128964 \SONEC 170252017.97677 Fire Point Energy Ino. 4800 N Sam Houston Priwy E Houston, TX 77032 Atte: Mr. Bill Smith bemith@frepoint eneray ‘g
Slide 17: Million Tons Total Estimated Value
20 Million Tons TOTAL ESTIMATED VALUE a Repo 20MTon low (oxide) [| high (metal) kg Refuse Coal me Brame S/kg Total Supply S/kg | Total Supply S/kg | Total Supply Cerium (Ce) 92.58 18, 143,694,800} 1,679,743,264,584 1,679,743,265 $2.15 $3,611,448, $4.50 $7,558,845, $4.50 $7,558,845, Dysprosium (Dy) 2
Slide 18: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day 30,006,060 666,667 Years to Process Power Need MW 7 BPD Gallons DAILY ANNUALLY 2,511 105,479 38,500,000 Power Needs 68 Plant Cost “S$ 326,484,018 | Price P Gallon Rev p Day Rev p Year ee Ie 421,918 POWE
Slide 19: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc. PO Box 174 Fethel Park, PA. 15102 412-833-7766 (0), 412-854-0373 (0) Fie Point Energy Ino iero024 +1500 N Sam Houston Pricwy E Houston, TX77032 Received 5/20/2024 Ath: Mr. Bil Smith Sampled by: lent bemth@freport eneray TLD: 330670, ‘agintreg@amallcom ‘Sample ID: Was
Slide 20: DOR-PA-23 Total Estimated Value
DOR-PA-23 onTo TOTAL ESTIMATED VALUE = 7 ° 23MTon low (oxide) || high (metal) kg Refuse Coal a ort $/kg Total Supply s/kg | Total Supply s/kg | Total Supply Cerium (Ce) 157.98 | 20,865,249,020| 3,296,252,040,180 | 3,296,292,.00 | 3,296,292 3,634 $2.15 $7,087,028 $4.50 $14,833,314 $4.50 $14,833,314 D
Slide 21: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST 23,000,000 766.667 me BPD Gallons patty ANNUALLY 2,968 121,301 44,275,000 Power Needs es Power Needs Megawatts gasifiers 8 an 78 Turbine Cost Power [SUNNNNNNGSCOOIEa75 Total Power Need 23 Megawatts Low Gross value ‘Annual Revenue MID
Slide 22: Conti Testing Laboratories lab results
Conti Testing Laboratories, Ine. PO Box 174 Bethel Park, PA 15102 412-833-7766 (0), 412-854-0373 (D) lab@coritestin Fire Port Energy Ine syaire024 "200 N Sam Houston Pay € Houston, TX 77082 Received: s/tor004 at be Bit Seth Sampled by: lent ramthofrecontenerav ono 228006 Sainegamacan Nanty-Glo, Penn
Slide 23: Total Estimated Value 40M Ton
40 on To TOTAL ESTIMATED VALUE on Repo 40M Ton kg Total Yield low (oxide) [| high (metal) kg Refuse Coal o anal yield (tons) S/kg Total Supply $/kg_ | Total Supply S/kg, Total Supply Cerium (Ce) 132.44 | 36,287,389,600| 4,805,901,878,624 | 4,805,901,879 4,805,902 5,299 $2.15 $10,332,689 $4.50 $21,62
Slide 24: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day Power Need MW 15 Years to Process 20-40 BPD Gallons DAILY ANNUALLY 5,023 210,959 77,000,000 Power Needs 13.6 Plant Cost -$ 652,968,037 Price P Gallon Rev p Day Rev p Year ee Ie 243,836 Power Needs Megaw
Slide 25: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc. PO Box 174 Bethel Park, PA. 15102 412-833-7766 (0), 412-854-0373 () contilab@contitesting.com ‘PA.DEP eg 02.00869 EPA PADITI1, WDRE 12013 WRENC 2005128964 ISONEC 170 Fire Point Energy inc. 1800 N Sam Houston Prisy E Houston, TX 7032 Attn: Mr. Bil Smith bsmith@frepoin
Slide 26: Total Estimated Value 60M Ton
60 on To TOTAL ESTIMATED VALUE ae Repo 60MTon kg Total Yield low (oxide) | e (me high (metal) : kg Refuse Coal me Brems yield (tons) Ske Total Supply S/kg | Total Supply S/kg | Total Supply Cerium (Ce) 84.26 |54,431,084,400] 4,586,363,171,544 4,586,363,172 4,586,363 5,057 $2.15 $9,860,681 $4.50 $20,
Slide 27: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST [60,000,000 2,000,000 2 oe BPD Gallons pally ANNUALLY Power Needs Megawatts gasifiers 22 an 20.3 Turbine Cost Power [SUNNNNNNSOZ63/5575 Total Power Need 61 Megawatts Low Gross value ‘Annual Revenue MID Value ‘Annual revenue REES $ 1,
Slide 28: Conti Testing Laboratories lab results
Conti Testing Laboratories, inc PO Box 174 Bethel Park, PA 15102 412-833-7766 (0), 412-854-0373 () contiiab@conttesting com PADEP Rea 2.00869 EA PANTS, WDBE 12013 WRENC 2005128584 \SONEC 17095:2047-97677 Fire Point Energy Ine 32112024 1500 N Sam Houston Priwy E Houston, TX 77032 Received: 9/19/2024
Slide 29: Total Estimated Value 18M Ton
TOTAL ESTIMATED VALUE _ 7 os 18M Ton ke Tae low (oxide) [| high (metal) kg Refuse Coal ss acid yield (tons) S/kg Total Supply $/kg | Total Supply $/kg_ | Total Supply Cerium (Ce) 59.32 | 16,329,324,600] 968,655,535,272 968,655,535 968,656 1,068 $2.15 $2,082,609 $4.50 $4,358,950 $4.50 $4,358,950 Dysp
Slide 30: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day [18,000,000 600,000 Years to Process 20-40 Gast QUIDS BPD Gallons Daly ANNUALLY 2,500 63,000 22,995,000 Power Needs aa Plant Cost S$ 195,000,000 _ Price P Gallon Rev p Day Rev p Year ees] ¢ 52,000 eee a
Slide 31: Conti Testing Laboratories lab results
Conti Testing Laboratories, inc PO Box 174 Bethel Park, PA 15102 412-833-7766 (0), 412-854-0373 () contiiab@conttesting com PADEP Rea 2.00869 EA PANTS, WDBE 12013 WRENC 2005128584 \SONEC 17095:2047-97677 Fire Point Energy Ine 32112024 1500 N Sam Houston Priwy E Houston, TX 77032 Received: 9/19/2024
Slide 32: Monongahela Total Estimated Value
Monongahela TOTALESTIVATEDVAIUE Re 5 po 75M Ton kg Total Yield low (oxide) high (metal) kg Refuse Coal the ania yield (tons) S/kg Total Supply S/kg, Total Supply S/kg Total Supply Cerium (Ce) 72.64 68,038,855,500 | 4,942,342,463,520 | 4,942,342,46a | 4,942,342 5,449 $2.15 $10,626,036 $4.50 | $22,240
Slide 33: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day Power Need MW [75,000,000 2,500,000 | Years to Process 20-40 BPD Gallons DaiLy ANNUALLY 9,418 395,548 144,375,000 Power Needs 25.4 Plant Cost S$ —-1,224,315,068 _ Price P Gallon Rev p Day Rev p Year Sa)
Slide 34: Conti Testing Laboratories lab results
Conti Testing Laboratories, Inc PO Box 174 Bethel Park, PA 15102 412-833-7766 (0), 412-854-0373 (1) i itestn PADEP Rea 0.00869 EPA PADI71S, WDBE 17012 WRENC 2005128984 ISOEC 170 Fire Point Energy Ine 1500 N Sam Houston Priwy E Houston, TX 77032 At: Mr Bil Smith bemith@frepoint eneray, ‘giintine@omai
Slide 35: NMN Million Tons Total Estimated Value
NMN 40 Million Tons TOTAL ESTIMATED VALUE = po 40MTon low (oxide) [| high (metal) kg Refuse Coal wad ee S/kg Total Supply S/kg | Total Supply S/kg | Total Supply Cerium (Ce) 65.51 36, 287,388,000 | 2,377,186,787,880 2,377,186,788 $2.15 $5,110,952 $4.50 $10,697,341 $4.50 $10,697,341 Dysprosium (Dy) 2
Slide 36: Equipment Capex to Process Waste Coal on Site
EQUIPMENT CAPEX TO PROCESS WASTE COAL ON SITE GASIFIER NEED / COST Tons Tons per year Ton Per Day om BPD Gallons Sally ANNUAL ees] ¢ Ba3,236 ar Power Needs Megawatts gasifiers 15 cn 13.6 Turbine Cost Power [[SUNNNNNNZSE7S(Os51 REE 2 Total Power Need 40 Megawatts Low Gross value ‘Annual Revenue MID V
Slide 37: Firepoint Energy Inc
Ni) CC FIREPOINT ENERGY INC Ky=9 It is our plan to develop waste-coal-to-energy plants, starting with our pilot site in Tunnelton Pennsylvania. In time, we will follow the coal seams into West Virginia, Virginia, Tennessee, and Kentucky, before eventually reaching Texas. Each site we develop will pr