  1. Slide 1: Welcome

    1 NCC Nagarjuna Construction Company Limited WELCOME

  2. Slide 2: Presentation Outline

    PRESENTATION OUTLINE • HISTORICAL BACKGROUND • INDUSTRY OUTLOOK • PEER COMPARISION • SEGMENTS • FOCUSED GROWTH STRATEGY 2

  3. Slide 3: Historical Background

    HISTORICAL BACKGROUND NCC

  4. Slide 4: Vision

    VISION To be a world class construction and infrastructure enterprise committed to quality, timely completion, customer satisfaction, continuous learning and enhancement of stakeholders value. 4

  5. Slide 5: Mission

    MISSION 1. To build a strong future ensuring increased returns to shareholders and enhanced support to associates. 2. To adopt latest technologies in the field of engineering, construction, operation & maintenance of infrastructure projects. 3. To encourage innovation, professional integrity, up gra

  6. Slide 6: Values

    VALUES Openness and Trust Integrity & Reliability Team Work & Collaboration Commitment Creativity 6

  7. Slide 7: Experience, Size and Know-how

    Experience, Size and Know-how NCC amongst most experienced NCC achieved significant scale to firms in industry bid for and win large contracts Order-book 2009 Order Book crosses INR 148 Billion 148140 2008 Mining division started 2007 Oil & Gas, Metals and Power divisions started 2006 Net worth cros

  8. Slide 8: Presence across segments de-risks NCC business model

    Presence across segments de-risks NCC business model Diverse nature of projects under different verticals provides requisite flexibility to company’s business mix New Divisions, 4% New Divisions, 16% International, 24% International, 22% Buildings & Buildings & Housings, 27% Housings, 25% Metals, 7%

  9. Slide 9: NCC – Growing Reputation

    NCC – GROWING REPUTATION Fastest growing Construction Company in 2006 Twelve research reports during last two years with BUY recommendation A return of 95% to GDR holders in the first year Recognition by Forbes Asia as “ Best Under a Billion” Invitation by “World Economic Forum” to participate in th

  10. Slide 10: Strong management team and experienced staff

    Strong management team and experienced staff are NCC’s key strengths 30-year history in Indian construction industry Strong, experienced and dedicated management team and skilled work force – 3,968 employees including 2,500 Engineers (excludes contract labour) – Almost two thirds of managers have en

  11. Slide 11: Strong financial position and excellent credit rating

    Strong financial position and excellent credit rating •Relatively low levels of long-term bank loans –Short term loans primarily used for working capital requirements •Able to borrow on good terms and at favourable rates due to strong standing in construction industry and good track record –Committe

  12. Slide 12: NCC – Key Differentiators

    NCC – Key Differentiators 1. Experience, size and know-how 2. Diversified business model 3. Excellent reputation Strong management team and 4. experienced staff 5. Strong financial base 12

  13. Slide 13: NCC financial performance: strong revenue growth

    NCC financial performance: strong revenue growth Revenues on high growth trajectory Improving business mix leading to better margins NCC Turnover ( Rs In million) 5.6% NCC Net Margin (%) 5.2% 4.8% 4.6% : 41% 4.2% GR CA 41,560 3.7% 35,240 29,002 18,424 11,885 7,582 FY04 FY05 FY06 FY07 FY08 FY 09 FY04

  14. Slide 14: Optimal use of balance sheet has enhanced shareholder return

    Optimal use of balance sheet has enhanced shareholder return Net Worth (Rs. In Million) Gross Block (Rs. In Million) 16,856 6,620 6,230 15,724 5,007 9,642 10,464 2,569 1,414 1,665 3,221 1,625 FY04 FY05 FY06 FY07 FY08 FY09 FY04 FY05 FY06 FY07 FY08 FY09 EPS (In Rs) Book Value Per Share (In Rs) 14.7 91

  15. Slide 15: Optimal use of balance sheet has enhanced shareholder return

    Optimal use of balance sheet has enhanced shareholder return Optimum use of capital Leverage under control Return on capital employed¹ Debt to equity ratio 20.4% 19.3% 19.1% 18.7% 18.5% 83% 84% 70% 64% 11.9% 62% 58% FY04 FY05 FY06 FY07 FY08 FY09 FY04 FY05 FY06 FY07 FY08 FY09 Capital structure that b

  16. Slide 16: Revenue Growth

    Revenue Growth NCC Revenue Growth NCC Revenue (Rs in Million) 2002-03 Rs 4,576 million 45,000 2003-04 Rs 7,247 million 40,000 2004-05 Rs.11,476 million 35,000 2005-06 Rs 18,175 million 30,000 2006-07 Rs 28,782 million 25,000 2007-08 Rs.35,240 million 2008-09 Rs. 41,560 million 20,000 9MFY10 Rs. 39,8

  17. Slide 17: Growth in Order Booking

    Growth in Order Booking Orders Received (Rs in Million) 80,000 74,860 70,000 66,000 60,000 2% 54,250 :5 GR 50,000 CA 47,108 40,000 36,227 32,350 30,000 20,000 10,790 10,000 0 2003-04 2004-05 2005-06 2006-07 2007-08 2008-09 9MFY10 17

  18. Slide 18: Segments

    NCC SEGMENTS Building an India you can cherish

  19. Slide 19: Segments of NCC Ltd.

    Segments of NCC Ltd. NCC Buildings & Water & Irrigation Power International Housing Environment Transportation Electrical Oil & Gas Metals Mining 19

  20. Slide 20: Buildings & Housing – key business divisions

    Buildings & Housing Construction spending for Urban infrastructure expected to amount to Rs. 231bn(US$ 5.8 bn) in Eleventh Five year plan Key drivers include growing Indian industry & economy, increasing urbanization and household growth Revenue growth Order-book (25%) NCC’s key business divisions R

  21. Slide 21: Some of the Major Projects Executed are:

    Buildings & Industrial Structures Some of the Major Projects Executed are: 21

  22. Slide 22: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value : Rs.1100 Million Structural Steel : 3000 MT Earthwork : 80,000 Cum. Concrete : 30,000 Cum. Reinf. Steel : 4000 MT 18 M Dia., 55 M High Feeding Silo 14 M Dia., 29 M High Cement Silo 85 M High Preheater Building. Cement Plant at Kurnool Andhra Pradesh E

  23. Slide 23: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value : Rs.500 Million (including cement & steel) Rs.225.85 Million (excluding cement & steel) Reinforcement steel : 8000 MT Structural steel : 5010 MT Concrete : 80,000 Cum. Raw Mill House : 57 M Height Deep foundations at (-) 14 M Depth Blending silo 20 M

  24. Slide 24: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value : Rs.202.46 Million Built-up area : 2 Lakh Sq ft. Design and construction of RCC framed structure of Terminal IA building at Indira Gandhi International Airport, New Delhi including all services on Turnkey basis like Electrical, Fire Alarm and Detectio

  25. Slide 25: Buildings & Industrial Structures

    Buildings & Industrial Structures HDPE Unit For Petro Chemicals Expansion Project, Pata, Auraiya Project Cost : 299.50 Lakh 25

  26. Slide 26: Buildings & Industrial Structures

    Buildings & Industrial Structures Orissa Industrial Infrastructure Development Corporation, Bhubaneswar, Orissa. Project Cost: Rs. 230.00 Million Construction of Software Complex 26

  27. Slide 27: Buildings & Industrial Structures

    Buildings & Industrial Structures JMD REALTORS, GURGAON, 13 Storied Commercial Complex Project Cost: Rs. 98.10 Million 27

  28. Slide 28: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value: Rs. 610.00 Million Buildup Area: 95,000 sft Construction of 186 Flats and Guest Rooms at State Bank of India, Nerul Residential Complex, Navi Mumbai) 28

  29. Slide 29: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value: Rs. 127.46 Million Construction of Display block building of size 117M x 46M of G+2 and other infrastructure works & Ancillary structures National Academy of Construction, Hyderabad 29

  30. Slide 30: Buildings & Industrial Structures

    Buildings & Industrial Structures Project Value: Rs. 120.00 Million Construction of Multi Purpose Indoor Auditorium Capacity : 2500 Adjudged the “Best Concrete Structure of the Year 2002” by Indian Concrete Institute. Shilpakala Vedika, Madhapur, Hyderabad. 30

  31. Slide 31: Buildings & Industrial Structures

    Buildings & Industrial Structures 31

  32. Slide 32: Buildings & Industrial Structures

    Buildings & Industrial Structures 32

  33. Slide 33: Buildings & Industrial Structures

    Buildings & Industrial Structures Andhra Pradesh Industrial Infrastructure Corporation, Hyderabad Size approximate 225 mtrs x 190 mtrs oval shaped with spectator capacity of 30,000 Main Athletic Stadium at Gachibowli, Hyderabad 33

  34. Slide 34: Buildings & Industrial Structures

    Buildings & Industrial Structures HCA International Cricket Stadium, Uppal, Hyderabad Project Cost: 402.66 Millions 34

  35. Slide 35: Buildings & Industrial Structures

    Buildings & Industrial Structures Andhra Pradesh Industrial Infrastructure Corporation, Hyderabad Project Value: Rs. 527.30 Million - Package I Fully Air-conditioned 90 M dia (approx.) with spectator capacity of 4000. A.C Indoor Stadium at Gachibowli, Hyderabad 35

  36. Slide 36: Buildings & Industrial Structures

    Buildings & Industrial Structures GACHIBOWLI INDOOR STADIUM Inside View of Indoor Stadium 36

  37. Slide 37: Buildings & Industrial Structures

    Buildings & Industrial Structures Andhra Pradesh Industrial Infrastructure Corporation, Hyderabad Project Value: Rs. 527.30 Million - Package I Outdoor Olympic size Swimming Pool, Diving Pool and Warm Up Pool, with spectator capacity of 2000 Swimming Pool at Gachibowli, Hyderabad 37

  38. Slide 38: Buildings & Industrial Structures

    Buildings & Industrial Structures Andhra Pradesh Industrial Infrastructure Corporation, Hyderabad Project Value: 177.37 Million - Package II Size approximate 84M x 70M rectangular shaped with spectator capacity of 2000 Indoor Stadium for Volley Ball & Basket Ball at Yousufguda, Hyderabad 38

  39. Slide 39: Buildings & Industrial Structures

    Buildings & Industrial Structures Size approximate 85 M x 67 M rectangular shaped with spectator capacity of 2000 Indoor Stadium for Gymnastics & Wrestling at Saroor Nagar, Hyderabad 39

  40. Slide 40: Buildings & Industrial Structures

    Buildings & Industrial Structures SAROOR NAGAR INDOOR STADIUM Inside View of Indoor Stadium 40

  41. Slide 41: Buildings & Industrial Structures

    Buildings & Industrial Structures Dr. Reddy’s Research Laboratory – Hyderabad Project Value: Rs. 58.14 Million 41

  42. Slide 42: Buildings & Industrial Structures

    Buildings & Industrial Structures ISTA Hotel, Hyderabad, Project Cost: 146.42 Millions 42

  43. Slide 43: Buildings & Industrial Structures

    Buildings & Industrial Structures Satyam SEZ, Hyderabad Project Cost: 261.88 Millions 43

  44. Slide 44: Buildings & Industrial Structures

    Buildings & Industrial Structures NBCC Plaza, New Delhi, Project Value: Rs.297.56 Million 44

  45. Slide 45: Buildings & Industrial Structures

    Buildings & Industrial Structures Construction of I.T Parks at MIDC Knowledge Park for Patni Computers Ltd, Navi Mumbai Project Value: Rs.605.71 Million 45

  46. Slide 46: Buildings & Industrial Structures Ongoing Projects

    Buildings & Industrial Structures Ongoing Projects Construction of Mega Sports Complex, Package II, at Hotwar, Ranchi for Building Construction Divison, Jharkhand Project Value: Rs.1522.20 Million Construction of Software Technology Park/ Gems Jewellery Park building & ancillary work at STP & GJP Ca

  47. Slide 47: Buildings & Industrial Structures Ongoing Projects

    Buildings & Industrial Structures Ongoing Projects Construction of Puzhal Prison Complex at Puzhal near Chennai for Tamilnadu Police Housing Corporation Limited Project Value: 462.60 Million. Construction of Metro Bhawan at Barakhambha Road, New Delhi for Delhi Metro Rail Corporation Limited Project

  48. Slide 48: Housing

    Housing Indian Space Research Organization, Bangalore RCC Framed Multi-storied 256 Residential Apartments. Project Value : Rs. 160.00 Million Built-up area : 3 Lakh Sq ft. 48

  49. Slide 49: Housing

    Housing National Games village at Bangalore RCC Framed Multi-storied Residential Buildings using NBS cellular construction technology including all services on Turnkey basis. Project value : Rs. 853.00 Million Built-up area : 14 Lakh Sq ft. Concrete : 80,000 Cum. No. of Flats : 1394 Houses 49

  50. Slide 50: Housing

    Housing Nuclear Power Corporation, Kaiga, Karnataka RCC Framed Multi-storied 1100 Residential Apartments on Turnkey basis. Project Value : Rs. 440.00 Million Built-up area : 9 Lakh Sq ft. Concrete : 46,000 Cum. 50

  51. Slide 51: Housing

    Housing South Asian Games village at Chennai, Tamil Nadu RCC Framed Multi-storied 560 Dwelling Units including all services on Turnkey basis. Project value : Rs. 638.80 Million Built-up area : 7 Lakh Sq ft. No. of Flats : 560 Apartments Completed in a record time of 12 months 51

  52. Slide 52: Housing

    Housing Karnataka Housing Board, Bangalore. 1312 RCC Framed Multi- storied Residential Apartments including all services on Turnkey basis using NBS Cellular Construction Technology with Load bearing RCC walls using pre -engineered NBS Steel moulds Project Value : Rs. 226.60 Million Built-up area : 7

  53. Slide 53: Housing

    Housing DDA Mega Housing Project, Dwaraka, New Delhi. Construction of 512 Multi-storied HIG DU’s in Dwaraka incl. Sanitary, Water Supply and internal Development Project Value:Rs.449.71 Million 53

  54. Slide 54: Housing

    Housing Singapore Housing Project Singapore Housing Project Construction of Residential Flats at Singapore Class Township at Pocharam, Hyderabad Jointventure with NCC – Maytas(JV) Project Value : Rs. 1623.30Million No.of Blocks : 64 No.of Flats : 2080 Total Plinth Area : 27,79,636 Sq.ft. 54

  55. Slide 55: Housing Ongoing Projects

    Housing Ongoing Projects Construction of 186 officers Flats & 12 Guest Rooms at Nerul Residential Complex, Navi Mumbai for State Bank of India. Project Value: Rs. 543.40 Million. Construction of Residential Apartments of 14 Blocks for 450 Flats & Built up area about 7.7 Lakhs Sq ft for Sriram Proper

  56. Slide 56: Housing Ongoing Projects

    Housing Ongoing Projects Provision of Permanent Accommodation for Army College of Medical Sciences for President PMG at Delhi Cantt. Project Value : Rs. 672.13 Million Construction of seven storeyed Tower Block – I, Govt. Hospital Campus, Chennai. Project Value : Rs. 641.00 Million Construction of a

  57. Slide 57: Transportation – key business divisions

    Transportation India has second-largest global highway and road network after United States Roads expected to account for Rs. 2994bn(US$ 74.9 bn) i.e. 22% of Eleventh Five year plan’s construction spending Increasing private sector participation and BOT contracts driving growth of Indian constructio

  58. Slide 58: Some of the Major Projects Executed are:

    Transportation Some of the Major Projects Executed are: 58

  59. Slide 59: Transportation

    Transportation National Highways Authority of India. Construction of Ghaziabad-Hapur Section from Km.27.643 to Km.48.638 and Construction of Hapur Bypass of NH-24 in Uttar Pradesh in Joint Venture with KNR Construction, India Project value : Rs. 1153.60 Million 59

  60. Slide 60: Transportation

    Transportation Project value : Rs. 362.32 Million Embankment : 84,000 Cum. Sub grade : 91,000 Cum. G. S. B. : 37,000 Cum. Wet mix : 51,500 Cum. Bituminous : 86,000 Cum. Concrete : 14,600 Cum. National Highways Authority of India. Six Laning of NH-1 for 15 Kms. of Delhi Border to Samalkha section in

  61. Slide 61: Transportation

    Transportation Project value : Rs. 184.00 Million Sub-base & wet mix macadam : 41000 Cum. Bituminous work : 15,000 Cum. Bangalore Development Authority. Construction of carriageway of ring road along with cross drainage works in Bangalore city 61

  62. Slide 62: Transportation

    Transportation Project Value : Rs. 173.40 Million Dredging work : 5,50,000 Cum. Gravel filling : 6,00,000 Cum. Concrete : 10,000 Cum. Well sinking up to 15 M depth Necklace Road under Buddha Purnima Project for Hyderabad Urban Development Authority, Hyderabad 62

  63. Slide 63: Transportation

    Transportation Project Value : Rs. 358.77 Million. Length : 1427 M Carriage width : 24.2 M 20 M span PSC Girders : 400 nos. Approaches : 300 M long with reinforced earth precast panels as retaining walls. Concrete : 32,000 Cum. Reinforcement Steel : 3000 MT Piling : 540 Nos. of 1200 mm Construction

  64. Slide 64: Transportation

    Transportation Project Value : Rs. 123.60 Million Total Length : 748 M flyover and 400 M subway Construction of Flyover cum Road Over Bridge, Subway and Allied works at Latur for Maharashtra State Road Development Corporation (MSRDC) 64

  65. Slide 65: Transportation

    Transportation Ahmedabad Vadodara Expressway (Phase-II) in Gujarat for National Highways Authority of India in JV with LG E&C of Korea Project value :Rs.3426.00Million Total length : 50 Km. of new formation Embankment : 56,10,000 Cum. Sub grade : 16,00,000 Cum. Ganular sub base : 5,00,000 Cum. Wet m

  66. Slide 66: Transportation

    Transportation Widening and strengthening of Puttur Uttukottai and Chandragiri-Renigunta sections of State Highway in Andhra Pradesh for Govt. of Andhra Pradesh R&B Dept in JV with Sumber Mitra Jaya, Indonesia. (World Bank aided) Project Value : Rs. 594.47 Million Total length : 67 Kms. which includ

  67. Slide 67: Transportation

    Transportation Formation of 18 Kms. new bypass road on NH-6, outside Amaravathi & Badnera town in Maharashtra State for National Highways Authority of India. Project value : Rs. 384 Million Embankment : 7,30,000 Cum. Sub grade : 1,61,000 Cum. Granular sub base : 1,48,000 Cum. Wet mix macadam : 54,00

  68. Slide 68: Transportation

    Transportation Koilpatti, Chennai, Project Cost: JVLR, Mumbai, Project Cost: 371.61 Millions 68

  69. Slide 69: Transportation

    Transportation Construction of Flyover at Ring Road – Lawrence Road intersection at Britannia Chowk, Delhi Client : PWD, Govt of Delhi Project Value : Rs.120.90 Million 69

  70. Slide 70: Transportation

    Transportation Construction of Flyover “B” Avenue – Ring Road Intersection at Delhi Client : PWD, Govt of Delhi Project Value : Rs.112.50 Million 70

  71. Slide 71: Transportation

    Transportation * Design and construction of approaches for road over bridge and grade separator crossing on NH-4 on turnkey basis for Bangalore Development Authority, Bangalore. Project value : Rs. 270Million * Construction of Bridges for Karnataka Road Development Corp. Ltd.(KRDCL), at Bangalore, K

  72. Slide 72: Transportation

    Transportation * Improvement of Arterial and Sub-Arterial Roads in Bangalore City – Package –II, under Joint Venture for Bangalore Mahanagara Palika, valuing Rs.400 Million * Construction and Improvement to one Carriage way of Outer Ring Road including formation of missing bits, Construction of cros

  73. Slide 73: Transportation

    Transportation * Construction of Approach Roads to Agricultural Market Centre at Thirukazukundram, Jayankondam,Tamil Nadu Package M11, M16 & M17 for Tamil Nadu Agricultural Development Project, valuing Rs.77.4 Million. * Design & Construction of Six Bridges and its approaches in Tiruvallore & Kanchi

  74. Slide 74: Transportation

    Transportation Widening to four/six lanes and upgradation of the existing two-lane road including minor bridges (up to 30 M length) between Vishakapatnam and Champavati river of NH-5 in the State of Andhra Pradesh-Package AP-3 for National Highways Authority of India JV with Unitech Ltd., New Delhi.

  75. Slide 75: Transportation

    Transportation Strengthening & Paving of Shoulders of SH 24, Rajkot – Morvy (Km. 1/827 to Km 70/192) Contract No. GSHP/ 10 for Gujarat State Highways Project in JV with Som Datt Builders, New Delhi Total length of 68.365 Kms. Project value : Rs. 993.84 Million Earthworks : 11,28,380 Cum. Ganular sub

  76. Slide 76: Transportation Ongoing Projects

    Transportation Ongoing Projects Grand Trunk Road improvement Project in U.P. for National Highways Authority of India in JV with Som Datt Builders, New Delhi & NEC, Vizag. Total length of 51.33 Kms. Project consists of raised carriage way to be constructed on reinforced earth retaining wall of heigh

  77. Slide 77: Transportation Ongoing Projects

    Transportation Ongoing Projects Grand Trunk Road improvement project in Bihar for National Highways Authority of India in JV with Som Datt Builders, New Delhi. Total length of 30 Km. Project consists of major bridge over river Sone in Bihar which is of 3.00 Km. length Project value : Rs. 1979.54 Mil

  78. Slide 78: Transportation Ongoing Projects

    Transportation Ongoing Projects Prestigious Asian Development Bank (ADB) Aided Projects bagged recently : East-West Corridor Project - Rehabilitation and Upgrading of Bamanbore- Garamore Road Section of NH-8A from Km. 182.60 to Km. 254.00 in the State of Gujarat – Package – III for National Highways

  79. Slide 79: Transportation Ongoing Projects

    Transportation Ongoing Projects East-West Corridor Project – Rehabilitation and Upgrading of Garamore- Gagodhar Road Section of NH-8A and NH-15 from Km 254.00 to Km 308.00 and from Km 281.30 to Km 245.00 in the State of Gujarat – Package – IV for National Highways Authority of India in JV with Daeli

  80. Slide 80: Transportation Ongoing Projects

    Transportation Ongoing Projects East-West Corridor Project – Rehabilitation and Upgrading of Radhanpur- Deesa Road Section of NH-14 from Km 458.00 to Km 372.60 in the State of Gujarat – Package – VI for National Highways Authority of India in JV with Daelim Industrial Co., Korea. – ADB funded Total

  81. Slide 81: Transportation Ongoing Projects

    Transportation Ongoing Projects Rehabilitation & Up-gradation to Four Laning of Jhansi - Laknadon Section from Km. 94 to Km 132 on NH - 26 in the State of Uttar Pradesh - Contract Package No. ADB - II/C-3 for National Highways Authority of India. Project value : Rs. 1403.00 Million 81

  82. Slide 82: BOT Project

    Transportation Ongoing Projects BOT PROJECT Four laning of Bangalore – Mysore State Highway (SH-17) Bangalore – Maddur Package under Annuity Scheme Project under Joint Venture for Brindavan Infrastructure Co. Pvt. Ltd, Hyderabad. Project value : Rs. 4800 Million 82

  83. Slide 83: BOT Project

    Transportation Ongoing Projects BOT PROJECT Improvement, Operation and Maintenance of Rehabilitation and Strengthening of existing 2 lane road and widening to 4 – lane divided highway of Km. 52.250 to Km. 131.000 of NH-58 (Meerut- Muzaffarnagar Section) in state of Uttar Pradesh on BOT basis Joint V

  84. Slide 84: BOT Project

    Transportation Ongoing Projects BOT PROJECT Design, Engineering, Construction, Development, Finance, Operation and maintenance of "KM 220.00 on Orai-Bhognipur Section on National Highway No. 25 (NH-25) and of Km. 421.20 to KM 449.00 on Bhognipur - Barah section on National Highway No. 2 (NH-2) in th

  85. Slide 85: Transportation Ongoing Projects

    Transportation Ongoing Projects * Construction of road over bridge (ROB) along appproaches at Rly. Km. 1040/15-17 near Mekosabagh LC No.296-A on Nagpur-Itarasi Section of Central Railway for Maharashtra State Road Development Corporation Ltd. Project value : Rs. 101.3 Million. * Upgradation of Road

  86. Slide 86: Water & Environment – key business divisions

    Water & Environment Water supply and sanitation projects expected to account for over Rs500bn(US$12.5 bn), in Eleventh Five Year plan Increasing private sector participation and use of BOOT contracts to lead growth for private players Order-book NCC Revenue growth (18%) Rs in million 27,130 NCC’s ke

  87. Slide 87: Some of the Major Projects Executed are:

    Water & Environment Some of the Major Projects Executed are: 87

  88. Slide 88: Water & Environment

    Water & Environment Combined Water Supply Scheme to 156 villages & two towns in Amravati Dist, Maharashtra. Project Value Rs. 1070 Million 88

  89. Slide 89: Combined Water Supply Scheme for 156 Villages & 2 Towns

    Water & Environment Combined Water Supply Scheme for 156 Village &2 Towns Salient features of the Project To provide safe drinking water for 156 villages & 2 Towns Total Area Saline zone, no alternate water source. Due to Black cotton soil zone, D.I. & C.I. pipes are used Population benefited Presen

  90. Slide 90: Water & Environment

    Water & Environment Design, Installation , Testing, Commissioning of EPC contract for pumping station at Khosram :& Hansapur, Gujrat for GWRDCL Project Value : Rs. 146 Million 90

  91. Slide 91: Water & Environment

    Water & Environment Expansion of capacity of interceptor system and expansion of capacity of pumping stations in Chennai city Project Value Rs. 258 Million 91

  92. Slide 92: Water & Environment

    Water & Environment Manufacturing, laying and commissioning of 2200 mm dia MS pipes for supply of drinking water from river Krishna to Hyderabad City. Project Value : Rs. 1600 Million 92

  93. Slide 93: Water & Environment

    Water & Environment Modhera Lift Irrigation Scheme on EPC basis M.S.Pipelines with internal epoxy coating and out side Tape Coating of 2.5 mm thick. Including laying jointing,testing & commissioning with Pumping Station for GWRDC GUJARAT Project Valuing : Rs. 1235 Million 93

  94. Slide 94: Water & Environment

    Water & Environment Dhanbad Water Supply Scheme – Jharkhand India – Intake Well & Approach Channel – 13mm Dia Project Valuing : Rs.1097 Million 94

  95. Slide 95: Water & Environment

    Water & Environment Sanand" A2:" Water Supply Scheme M.S/AC/PVC/HDPE Pipelines, 77 MLDWTP, ESRR, GSR, ELECTRO MECHANICAL WORKS, SUBSTATIONS & PUMPING STATIONS etc. Project Valuing : Rs.1000 Million 95

  96. Slide 96: Water & Environment

    Water & Environment Jalundra Lift Irrigation Scheme on EPC basis M.S.Pipelines with internal epoxy coating and out side Tape Coating of 2.5 mm thick. Including laying jointing,testing & commissioning with Pumping Station. Project Valuing : Rs. 1492 Million 96

  97. Slide 97: Water & Environment

    Water & Environment Supply, installation, testing and commissioning of sanitary works at Kota and Jodhpur in Rajasthan Project Value : Rs. 290 Million 97

  98. Slide 98: Electrical – key business divisions

    Electrical Indian power supply needs to grow at approximately 12% annually to keep pace with GDP growth rate of 8% per annum Central Government has introduced schemes which include “Accelerated Power Development and Reform Programme” (APDRP) for improving transmission and distribution network across

  99. Slide 99: Some of the Major Projects Executed are:

    Electrical Some of the Major Projects Executed are: 99

  100. Slide 100: Electrical Division

    Electrical ELECTRICAL DIVISION DESIGN, ENGINEERING, ERECTION, TESTING & COMMISSIONING OF • 400 KV TRANSMISSION LINE • 220 KV TRANSMISSION LINE • 33/11 KV SUB STATION • 33 KV OVER HEAD LINE • 11 KV OVER HEAD LINE • PROJECT ELECTRIFICATION • SYSTEM IMPROVEMENT PROJECTS 100

  101. Slide 101: Electrical

    Electrical APTRANSCO 400KV Transmission Line Mandalapalli – Khammam – 100 Kms Project Value RO 0.39 MILLION Completed in a record time of 13 months 101

  102. Slide 102: Electrical

    Electrical 220KV Transmission Line – 67 Kms (From Vemagiri to Bhimavaram) 102

  103. Slide 103: Electrical

    Electrical 220KV Transmission Line – 27 Kms (From Aleru to Khammam) 103

  104. Slide 104: Electrical

    Electrical APTRANSCO System Improvement Project – APSPDCL – Chittoor District Project Value Rs. 149.31 MILLION 104

  105. Slide 105: Electrical

    Electrical APTRANSCO APTRANSCO A.P. Energy Efficiency Project - A.P. Energy Efficiency Project - Mahaboob Nagar District Augmentation Work Khammam District Augmentation Work Project Value Rs. 158.50 MILLION Project Value Rs. 79.50 MILLION 105

  106. Slide 106: Electrical

    Electrical Electrical Sub stations APDRP, ASSAM. UPPALWADI, NAGPUR 106

  107. Slide 107: Electrical

    Electrical System Improvement Project System Improvement Project Erection of Single Phase Augmentation of VCB Transformers at Hyderabad District at Hyderabad District 107

  108. Slide 108: Electrical

    Electrical 33/6.6 KV Sub Station for Cement Plant with 1000 TPD capacity at Racherla, Kurnool District, A.P. Project Value Rs. 73.00 MILLION 108

  109. Slide 109: Electrical Ongoing Projects

    Electrical Ongoing Projects * 220KV Transmission Lines from Vemagiri - Bhimavaram - 67 Kms with Godavari Crossing – Project Value Rs. 64.80 MILLION * 220KV Transmission Lines from Aleru - Khammam - 27 Kms – Project value Rs. 21.30 MILLION * Distribution System Improvement - Erection , Testing & Comm

  110. Slide 110: Electrical Ongoing Projects

    Electrical Ongoing Projects * Conversion of the existing LT Network in to High Voltage Distribution system (LT Less) Utilising the same lines on “Turnkey Basis” At Chittor District. Project Value: Rs.517.75 million * Distribution System Improvement Project Under APL-I at Hyderabad City. Various Proj

  111. Slide 111: Irrigation – key business divisions

    Irrigation Construction investment in irrigation sector expected to be Rs. 1033bn (US$25.9 bn) during 11th Five Year plan Construction investment in Hydropower sector expected to be around US$18.5 billion during 11th Five Year plan being 57% of total investment in power sector Increasing importance

  112. Slide 112: Some of the Major Projects Executed are:

    Irrigation Some of the Major Projects Executed are: 112

  113. Slide 113: Irrigation

    Irrigation Phase-II of J.Chokka Rao G.L.I Project for lifting 14 cumecs of water from river Godavari near Gangaram (v), Eturunagaram (M), Warangal district with single pipeline (I) from Intake to Dharmasagar via Bheemghanpur, Salivagu (ii) from R.S.Ghanpur to Chittakodur via, Aswaraopally (iii) from

  114. Slide 114: Salient Features

    Irrigation SALIENT FEATURES: Manufacturing, supplying, laying, jointing, testing and commissioning of 3000 mm dia MS pipeline for length of 150 Kms 2500 mm dia MS pipeline for length of 10 kms 2000 mm dia MS pipeline for length of 41 kms. Pumping Stations – 7 Nos. Concrete Volute Pumps of discharge

  115. Slide 115: Irrigation

    Irrigation Fabrication & testing of longitudinally welded MS pipes and specials of 2500 mm ID incl internal & external coating to pipes & specials at site workshop and delivery upto laying location, setting out the route & excavation of pipe line trench, shifting and laying and jointing of pipes, sp

  116. Slide 116: Irrigation

    Irrigation Pushkara Lift Irrigation Scheme, Phase – II Name of the Client : I&CAD Department, Rajamundry, A.P Name of the Agency : NCC-SMC-M&P-Taher Ali (JV) Value of Work : Rs. 502.5 Million (NCC Share 40%) Completion Period : 18 Months SALIENT FEATURES: Jack-well Pump House by Well Sinking Method

  117. Slide 117: Irrigation

    Irrigation Tadipudi Lift Irrigation Scheme, Phase – II Value of Work : Rs. 308.0 Million (NCC Share 40%) 117

  118. Slide 118: Irrigation

    Irrigation Gudlakamma Reservoir Value of Work : Rs. 1073.56 Millions 118

  119. Slide 119: Irrigation

    Irrigation Construction and commissioning on turnkey basis including one year maintenance of Moogaladoddi Lift Irrigation Scheme near Kandukur (v), Kosigi Mandal, Kurnool District. Name of Client : I& CAD Department,Yemmiganur,A.P Value of work : Rs 97.5 Million Completion Period : 12 Months SALIENT

  120. Slide 120: Oil & Gas – key business divisions

    Oil & Gas India is one of the least-explored countries in the world, with a well density among the lowest. It has a demand for 100 million tonnes of oil and gas, making it the fourth largest oil consumption zone in Asia. Potential to build around 18,661 kms. of domestic oil and gas pipeline network

  121. Slide 121: Power – key business divisions

    Power The performance of the power sector directly impacts the overall economy of the country, as it is the most important constituent of infrastructure. The Indian Govt.’s current economic plan, with its emphasis on greater industrialization and infrastructure development, has created tremendous de

  122. Slide 122: Power

    Power Construction of Duhangan Upsteam Works and Head race Tunnel for Allain Duhangan Hydro Electric Power Project (Package - IV) in Himachal Pradesh. Name of Client : AD HYDRO POWER LIMITED,Noida Value of work : Rs 450 Million Completion Period : 26 Months 122

  123. Slide 123: Power

    Power Name of Client : Gowtami Power Project Value of work : Rs 728.40 Million 123

  124. Slide 124: Metals – key business divisions

    Metals Metal Industry is the mainstay of an economy as it meets the requirements of a wide range of industries such as infrastructure, engineering, automobile, electrical and electronics. The rapid pace of industrialisation in India is constantly pushing up the demand curve for steel and other metal

  125. Slide 125: International – key business divisions

    International India has miniscule Rs22bn (US$0.5bn) share of Rs176tn(US$4trillion) global construction business. Construction business internationally offers excellent opportunity for project exports Untapped potential for Indian construction players in global market NCC Revenue growth Order-book (2

  126. Slide 126: Some of the Major Projects Executed are:

    International Some of the Major Projects Executed are: 126

  127. Slide 127: International

    International Sohar Water Network Phase – I at DEWA Pipe Line Project, Sohar, Muscat Dubai, Package- 512A Project Cost : Rs. 1100 Million Project Cost : $77.42 Million 127

  128. Slide 128: International

    International Dualization of Al Amerat Quriyat Road at Muscat Project Value : Rs.7200 Million 128

  129. Slide 129: International

    International Dualization of Al Amerat Quriyat Road at Muscat Project Value : Rs.7200 Million 129

  130. Slide 130: Mining – key business divisions

    Mining A number of opportunities exist in this space in view of the government planning to open private sector participation in mining. Untapped potential for Indian players in global market Order-book Revenue growth (3%) NCC’s key business divisions Established in 2008, this Rs in million 4,456 div

  131. Slide 131: Subsidiaries - Business Plans

    Subsidiaries - Business Plans NCC NCC INFRA HOLDINGS LTD NCC URBAN INFRASTRUCTURE LTD Focus on Focus On Long Term Infra Projects Real Estate Projects Residential Commercial Transportation Power Vilas IT Parks Apartments Hotels Townships SEZS Shopping Malls Commercial Complexes 131

  132. Slide 132: Current BOT Portfolio

    Current BOT Portfolio NCC Ltd. 100% Focus on NCC Infra – Long term infra projects – Stable revenue streams Roads Power 33% Brindavan 67% Himachal Sorang Infrastructure (~63 km) (100 MW) 51% Western UP Tollway 54% Himalayan Green (~79 km) (280 MW) 40% Bangalore Elevated 100% NCC Power Project Tollway

  133. Slide 133: Execution on Track

    Execution on Track Project Equity – Equity Revenue Cost Target Projects Partners NCC Share Invested(2 Current Status Model COD (Rs. Mn) (Rs. Mn) ) (Rs. Mn) Roads Brindavan Annuity Maytas, KMC 2,475 150 150 Jun 2006 Operational Infrastructure Bangalore Elev. Toll Maytas, Soma 8,800 1149 973 Jan 2010

  134. Slide 134: Real Estate Projects

    Real Estate Projects NCC Ltd. Promoters Real estate development spearheaded by NCC Urban Infrastructure Ltd 80% 20% 17 projects planned in the Group – 12 projects are ongoing currently NCC Urban Presence across 6 cities in India and Dubai Acreage ~ 410 acres JHLP No fresh investments planned in real

  135. Slide 135: Real Estate Portfolio Details

    Real Estate Portfolio Details Percentage Builtup Area Projects City Type of Development Acreage Current Status holding (Mn Sqft.) NCC Urban Gachibowli Hyderabad 70% Residential 9.24 1.16 Ongoing NGHC Ranchi 88% Residential 56.44 2.50 Ongoing Meadows Bangalore 60% Residential 8.00 0.80 Ongoing Premie

  136. Slide 136: Real Estate

    Real Estate NCC has ventured into Real Estate development and acquired properties for construction and sale of Independent Houses, Multi-storied Apartments, Commercial Complexes, Corporate Guest Houses, Holiday Homes, Farm Houses etc. NAGARJUNA ENCLAVE, J.P.Nagar, South Bangalore. RCC framed multi-s

  137. Slide 137: Real Estate

    Real Estate Construction of National Housing Complex (NGHC) Project at Ranchi. 137

  138. Slide 138: Real Estate

    Real Estate Construction of National Housing Complex (NGHC) Project at Ranchi. No. of flats : 2000 138

  139. Slide 139: Nagarjuna Green Ridge

    Real Estate NAGARJUNA GREEN RIDGE: Ultra Deluxe Apartments with Club House & Swimming Pool, located in HSR Layout, Sector II, Bangalore. Completed Phase I, II, III No. of Flats : 288 Build-up Area : 4,00,000 sq ft 139

  140. Slide 140: Nagarjuna Green Woods

    Real Estate NAGARJUNA GREEN WOODS: Luxury Residential Apartments located at Marathahalli-Sarjapur Ring Road, Bangalore. No. of Flats : 147 Build-up Area : 2,08,017 sq ft 140

  141. Slide 141: Nagarjuna Castle

    Real Estate NAGARJUNA CASTLE: Commercial complex situated at Wood Street, Off Brigade Road, Bangalore, Total Built up area 35,000 sq ft given on lease for M/s. Proactive Net. 141

  142. Slide 142: Nagarjuna Premier

    Real Estate Name of Project : Nagarjuna Premier Location : 100 ft Road, J. P. Nagar, Bangalore. Structure : Ground + 16 Floors with Swimming Pool, club House & other facilities No. of Flats : 120 Build-up Area : 1,92,000 sq ft 142

  143. Slide 143: Nagarjuna Maple Heights

    Real Estate Name of Project : Nagarjuna Maple Heights Location : Marathahalli - K.R. Puram Ring Road, Bangalore Structure : Ground + 14 Floors No. of Flats : 152 - Phase I, 170 Phase II Build- up Area : 4,90,000 sq ft 143

  144. Slide 144: Nagarjuna Green Ridge IV Phase

    Real Estate Name of Project : Nagarjuna Green Ridge IV Phase Location : HSR Layout, Bangalore. Structure : Ground + 8 Floors No. of Flats : 54 Build-up Area : 85,000 sq ft 144

  145. Slide 145: Nagarjuna Signet

    Real Estate Name of Project : Nagarjuna Signet Location : Whitefield Road, Bangalore. Structure : Ground + Mezzanine + 3 Floors Total Build-up Area : 62000 sq ft 145

  146. Slide 146: Nagarjuna Silver Crest

    Real Estate Name of Project : Nagarjuna Silver Crest Location : Wind Tunnel Road, Bangalore. Structure : Ground + Mezzanine + 3 Floors Total Build-up Area : 60,000 sq ft 146

  147. Slide 147: Nagarjuna Pearl Bay

    Real Estate Name of Project : Nagarjuna Pearl Bay Location : Kadavanthra, Kochi. Structure : Ground + 14 Floors One of the largest projects in Kochi No. of Flats : 208 Build-up Area : 2,98,000 sq ft 147

  148. Slide 148: Nagarjuna Residency

    Real Estate Name of Project : Nagarjuna Residency Location : GACHIBOWLI, Hyderabad, Extent of Land: 6.5 ACRES Built up Area (Approx): 7,20,000 SFT Value of the Project : Rs. 1500 MILLIONS 148

  149. Slide 149: Real Estate Future Projects

    Real Estate FUTURE PROJECTS: 1. PROPOSED SPORTS CITY Location : RANCHI Extent Of Land : 54 ACRES Total No. of Units : 1800 Value of the Project : Rs. 300 CRORES 149

  150. Slide 150: Land Holdings

    Real Estate LAND HOLDINGS CHENNAI a. EXTENT OF LAND : 25 ACRES LOCATION : PALLAVARAM TYPE OF VENTURE : JOINT b. EXTENT OF LAND : 8.5 ACRES LOCATION : RADIAL ROAD, PALLAVARAM TYPE OF VENTURE : OWN VIZAG EXTENT OF LAND : 97.3 ACRES LOCATION : TYPE OF VENTURE : OWN BANGALORE EXTENT OF LAND : 45,000 SFT

  151. Slide 151: Land Holdings

    Real Estate COCHIN EXTENT OF LAND : 41,000 SFT LOCATION : NEAR KINFRA PARK TYPE OF VENTURE : OWN RAIPUR EXTENT OF LAND : 1,00,000 SFT LOCATION : TYPE OF VENTURE : OWN 151

  152. Slide 152: Focused Growth Strategy

    FOCUSED GROWTH STRATEGY NCC 152

  153. Slide 153: Focused growth strategy

    Focused growth strategy Increased focus on BOT and BOOT projects in Transportation and Power One of few companies to make early entry into BOT and BOOT projects Expand in international markets that fit within broad strategic vision Currently focusing on Transportation, Water and Buildings projects i

  154. Slide 154: International Division Dubai

    INTERNATIONAL DIVISION DUBAI Construction of 2 No’s Tower (G+35) at Dubio Tech, Total Built up area : 4.00 Million Sq ft Project Value : AED 1700 Million Location : Dubio Tech, Dubai City 154

  155. Slide 155: Numerous accolades testify to NCC's excellent reputation

    Numerous accolades testify to NCC’s excellent reputation Select Awards & Accolades On-time performance Award from Forbes Asia: Only construction company in • Possesses one the best records for quality India to be One of the 200 "Best Under a Billion" listed and timely completion of large projects co

  156. Slide 156: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT NCC has acquired modern, sophisticated and state-of-the-art construction plant, equipment and machinery imported as well as indigenous viz., Hot Mix Plant (Mobile and Stationery), Electronic Pavers, Pneumatic Tyred Rollers, Vibratory Tandem Rollers, Vibratory Earth

  157. Slide 157: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT Parker Hot Mix Mobile Electronic Paver Batching Plant and Plant Finisher Transit Mixer Asphalt Hot Mixing Nordberg Crushing Crawler Tower Plant Plant (Cone type) Crane 157

  158. Slide 158: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT BHP Crushing Plant Sensor Paver Crushing Plant Crushing Plant 158

  159. Slide 159: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT D.G. SET SENSOR PAVER PILING RIG HOT MIX PLANT 159

  160. Slide 160: Construction Machinery & Equipment

    CONSTRUCTION MACHINERY & EQUIPMENT KERB CASTING MACHINE CRUSHIING EQUIPEMENT BITUMIN SPRAYER HYDRAULIC PILING RIG TANDEM ROLLER HOT MIX PLANT 160

  161. Slide 161: Thank You

    NCC Thank You | ti(swstststséid 161 Building an India you can cherish