Essar Shipping — Essar Vizag Terminals — Corporate Update (October 2017)

22 slides from Essar Shipping's corporate update, October 2017

  1. Slide 1: Essar Vizag Terminals Limited

    ESSAR VIZAG TERMINALS LIMITED Phase-I - Up-gradation and Modernization of Existing Iron-Ore Mechanized Facility of Outer Harbour at Visakhapatnam Port

  2. Slide 2: Contents

    Contents Introduction  EPL Overview  EVTL - Brief Over-view  EVTL - OHC History  EVTL - General Lay-out Operations  EVTL - Operational Performance – FY16; FY17 & FY18  EVTL - Operational Critical Focus & Present Status  EVTL - Loading Performance FY18 Projects  EVTL - Project Brief  EVTL -

  3. Slide 3: Ports Business Overview

    Ports Business Overview Reaching 110 MMTPA by 2018 •30 MMTPA Dry Bulk / General Cargo Terminal at Hazira •16 MMTPA Dry Bulk Terminal at Paradip Operational •16 MMTPA Iron Ore Berths at Vizag Assets •20 MMTPA Dry Bulk Terminal at Salaya Vadinar Salaya •8 MMTPA Iron Ore Berths at Vizag Paradip Iron Or

  4. Slide 4: Hazira Overview

    Hazira Overview Hazira – Operational Hazira – Expansion Infrastructure Berth 550m, Draft 14m Berths 1,100m; Draft 16m Capacity 30 MMTPA 20 MMTPA Cargo Iron Ore, Coal, Limestone, Finished Steel General Cargo, Coal, Containers, Products, Project Cargo, Containers Petrochemicals Project status Operatio

  5. Slide 5: Hazira Photographs

    Hazira Photographs Bulk cargo handling Finished Steel Handling 5

  6. Slide 6: Paradip

    Paradip Paradip I (Dry Bulk) Infrastructure Berth: 230m; Draft: 14m Capacity 16 MMTPA Ships Handled Upto 105,000 DWT Handling Rates Loading at 70,000 TPD Cargo Iron Ore and other dry bulk cargo Project status Commissioned – Dec 2012 Key Customers Essar Steel, Merchant Hinterland Connectivity Road &

  7. Slide 7: Paradip Dry Bulk Photographs

    Paradip Dry Bulk Photographs Ship Loader, Reclaimers Conveyor 7

  8. Slide 8: Salaya

    Salaya Infrastructure Berth: 385m; Draft: 14m Vessel to be handled Capesize vessels Capacity 20 MMTPA Cargo at Phase I Coal, bauxite, pet coke Phase I Project status Commissioned in FY 2017 Key Customers Essar Power, Essar Oil, Reliance, Ashapura Minechem, Sikka Thermal Power Plant, coal traders Roa

  9. Slide 9: EVTL - Brief Over-view

    EVTL - Brief over-view EVTL Iron-Ore Handling Terminal is a Brown-Field Project taken-over from M/s. Visakhapatnam Port Trust on DBFOT basis. Project: The Outer Harbour Berths (OB#1 and OB#2) need to be upgraded, with latest state-of-art handling facilities, with original designed loading rated capa

  10. Slide 10: EVTL - OHC History

    EVTL - OHC History OHC Operations  1966 : Commercial Operations (WQ#5)  1969 : Up-gradation to 6 MMTPA  1976 : Outer-Harbour Commissioning OHC Up-gradation / Replacement Activities First passenger ship dated 07th Oct’ 1933  1983 : New 3rd Tippler Installation  1991 : Replacement of BWR#1 with #

  11. Slide 11: EVTL - General Lay-out

    EVTL - General Lay-out PORTS SHIP LOADER fs i DUMPER

  12. Slide 12: Operations

    d ESSAR’ PORTS Operations

  13. Slide 13: EVTL - Operational Performance - FY16; FY17 & FY18

    EVTL - Operational Performance - FY16; FY17 & FY18 All Values in MMT Receiving Shipping FY 16 FY 17 FY 18 (P) FY 16 FY 17 FY 18 (P) Essar Steel 0.35 0.28 0.50 2.88 5.11 7.20 Third-Party 2.65 5.25 5.50 2.19 3.21 5.80 Grand-Total 3.00 5.54 6.00 5.07 8.32 13.00 Rakes Receiving (MMT) Vessel Shipping (MM

  14. Slide 14: EVTL - Operational Critical Focus & Present Status

    EVTL - Operational Critical Focus & Present Status  Loading-Rate Improvement: o Doubled the capacity of loading-rate from 30,000 TPD (During FY16) to 70,000 TPD (At present) o Enhanced loading-rate has yielded faster turn-around and also dispatch bonus to the customers o Aiming for further improvem

  15. Slide 15: EVTL - Loading Performance FY18

    EVTL - Loading Performance – FY18 ESTIL - Cape Size Vessels – OSBD TPD MMTC - Panamax Vessels – OSBD TPD 58,000.00 60,000.00 56,000.00 50,000.00 54,000.00 40,000.00 52,000.00 30,000.00 50,000.00 20,000.00 48,000.00 10,000.00 46,000.00 - Apr'17 May'17 Jun'17 Jul'17 Aug'17 Apr'17 May'17 Jun'17 Jul'17

  16. Slide 16: Projects

    d ESSAR’ PORTS Projects

  17. Slide 17: EVTL - Project Brief Progress update

    EVTL – Project Brief Progress update Replacement Implementation Misc. Other Activities of all major Equipment of Major New Packages 1) Apron-Feeders (06 No's) 1) PLC Automation & Control 1) Mechanical Equipment replacement >Apron-Feeders 2No*4000TPH 2) Electrical Packages (Belts; Idlers; Pulleys; Ge

  18. Slide 18: EVTL - Project Unique Facilities

    EVTL – Project Unique Facilities • 23 MMTPA Iron-Ore Handling facility, to cater to vessels up to 200,000 DWT with a depth of -18.0 Mtrs • Rake Receiving System: Complete mechanized facilities comprising of wagon tipplers (02 Nos) for receiving cargo by rakes, transferring cargo through conveyor sys

  19. Slide 19: EVTL - OHC Strengths and Advantages

    EVTL – OHC Strengths and Advantages

  20. Slide 20: EVTL - OHC - Strengths

    EVTL – OHC - Strengths Mining Source:  Closest proximity major iron-ore mining source M/s. NMDC Bailadila-Kirandul Region, Chhattisgarh  The range contains 1200 million tonnes of high grade [iron ore] distributed in 14 deposits / reserves of which 3 are being mined  The range possesses the world’

  21. Slide 21: EVTL - OHC - Advantages

    EVTL – OHC – Advantages  Following are the advantages for OHC customers using “NMDC Mining Source” and “KK Rail Connectivity”: • Tippler Facilities (03 Nos) – Present capacity of 07 Rakes / Day enhancing to 15 Rakes / Day • Stack-Yard Facilities – Vast stacking space of 20 Acres, which is capable t

  22. Slide 22: Thank You

    ESSAR VIZAG TERMINALS LIMITED THANK-YOU