BPZ Resources Inc

BPZ Resources — Investor Presentation (April 2014)

20 slides from BPZ Resources's investor presentation, Apr 4, 2014

  1. Slide 1: Corporate Presentation

    Slide 1: Corporate Presentation

    Corporate Presentation April 2, 2014

  2. Slide 2: Forward Looking Statements

    Slide 2: Forward Looking Statements

    Forward Looking Statements (>) BPZ Energy QI) meen re ent ‘This Presantationcontainsforwardlooking statements withinthe meaning of the Private Securities Litigation Reform Act of 1995, Section 27A.of the Securities Act of 1933 and Saction 216 of the Securities Exchange Act of 1934, Thezeforwardlooki

  3. Slide 3: Four Blocks in Northwest Peru and one in Southwest Ecuador

    Slide 3: Four Blocks in Northwest Peru and one in Southwest Ecuador

    Four Blocks in Northwest Peru and one in Southwest Ecuador Multiple Plays with Multiple Prospects in Each Play BPZ (51%) and Pacific Rubiales (49%) Block Z-1 JV Facilitates its Development and Future Exploration Oil Production Growth via Development Drilling at Corvina and Albacora 2013 Year-end Net

  4. Slide 4: Oil & Gas Actions / Finance Actions

    Slide 4: Oil & Gas Actions / Finance Actions

    OIL & GAS ACTIONS Corvina & Albacora Development Drilling Underway Complete 3D Seismic Mapping Pursue Z-1 Exploration Strategy Continue Onshore Exploration Grow Production GtP: Turbine Monetization Grow Cash Flow Grow Reserves FINANCE ACTIONS Improve G&A Cost Structure Capital Discipline Manage Cash

  5. Slide 5: Block Z-1 Strategy

    Slide 5: Block Z-1 Strategy

    Block Z-1 St Leverage 1,600 sq.km. 3D survey in efforts to... = Increase production at Corvina and Albacora = Capture Corvina and Albacora’s oil and gas upside potential pos ie = Appraise prior discoveries ? in Delfin, Piedra Redonda, ete and Barracuda me SBacgumeeD = Explore prospects in less Beeme

  6. Slide 6: Diving Deeper into Our Strategy

    Slide 6: Diving Deeper into Our Strategy

  7. Slide 7: Third new CX-15 oil well being sidetracked

    Slide 7: Third new CX-15 oil well being sidetracked

    Third new CX-15 oil well being sidetracked Five more wells planned in 2014 Four wells have surpassed 1 Mmbo = ~1,500 acres, with 15 more gross PUDs = Untested fault block is ~ 500 acres 524000 524800 528600 526400 527200 ~ Structure Map at Top of 8 Zorritos Unconformity 524000 enema. = 52de00 "52860

  8. Slide 8: Albacora development drilling

    Slide 8: Albacora development drilling

    a \ = A-21D well currently being drilled = Two gross PUDs to follow (22D & 20D) = A-18D well temporarily shut in due to = A-14XD well has exceeded 1 Mmbo gas intrusion = Area under developmentis ~ 400 acres 543600 544000 544400 546400 546800 547200 547600 Structure Map at Middle of Zorritos Oil Zone

  9. Slide 9: Delfin Prospect

    Slide 9: Delfin Prospect

    Prospect BPZ Energy = Drilling permit alreadyin hand = Prospective area is ~ 3,000 acres = Tenneco’s 39-X-1 well tested oil = Delfin platform to be “4 miles from CX-15 20000 522000 24000 526000 28000 530000 32000 534000 @ cx: wus D x15 WELLs ‘cORVINA Elevation depth i | Structure Map at the Top of t

  10. Slide 10: Delfin structure cross section

    Slide 10: Delfin structure cross section

    ) BPZ Energy ‘Dante ty Pal Spe Upper Zorritos fm. 3 ~ 3-way dip closure ag _~_Zorritos U1 ___ Lower Zorritosi 10

  11. Slide 11: Raya Prospect

    Slide 11: Raya Prospect

    Raya, also = Potential size of 7,500 acres = Also in less than 300 ft. of water = Drilling permit already in hand = 10 miles from Corvina CX-15 platform 504000 506000 508000 510000 512000 514000 516000 518000 20000, §22000 £24000 Structure Map at Top of Zorritos Unconformity L » ’s04000 "506000 " 50

  12. Slide 12: Piedra Redonda Anchors the Mancora Play

    Slide 12: Piedra Redonda Anchors the Mancora Play

    Piedra Redonda Anchors the Manco as Play OB PZ Energy Ns ‘Dante ty Pial Spe = Belco discovered dry gas with C-18-X well = Piedra Redonda prospect is “11,000 acres = Near coastlinein ~ 200 ft. of water = Drilling permit alreadyin hand er... OCEAN ‘Structure Map at Top of Mancora Formation

  13. Slide 13: Block XXIII

    Slide 13: Block XXIII

    Block Xxill Cardo 2X spud in late March 2014 * Second of three-well exploration campaign * Estimated total depth is 4,600 feet Caracol 1X testing * Two intervals at ~1,500 feet in depth tested gas with formation water * Upper interval with oil shows was stimulated; testing to continue with workover

  14. Slide 14: Another Oil Play in Southern Block XXIII Area

    Slide 14: Another Oil Play in Southern Block XXIII Area

    Another Oil Play in Southern Block XXIII Area BPZEnerg ‘Dante ty Pial Spe = In Talara basin next to Carpitas oilfield = Shallow depth oil potential = Multiple fault blocks mapped = Drilling permit in process NW New 2D Seismic Line BPZ10XxXIII-16 SE —Faults == Eocene (Verdun) — Eocene (Salina)

  15. Slide 15: Block XXII: Multiple Plays in ~1 Million Acres

    Slide 15: Block XXII: Multiple Plays in ~1 Million Acres

    Block XXII: Multiple Plays in ~1 Million Acres & BS) mmc tse ons = Muerto Formation is a brittle shale, rich = Pursuing Cretaceous age conventional in total organic content and unconventional plays = Thick section of Muerto Formation source =® Adjacent operator producing oil from rock in basin depoc

  16. Slide 16: Revised 2014 Capital & Exploratory Budget

    Slide 16: Revised 2014 Capital & Exploratory Budget

    Revised 2014 Capital & Exploratory Budget $ Millions Offshore Block Z-1 (51% BPZ) Corvina CX-15 development drilling (6 wells) $40 Albacora drilling (4 wells) $32 Projects & engineering $15 Total BPZ Net Offshore $87 Onshore Blocks XXIII, XXII and XIX (100% BPZ) Block XXIII (3 wells) $8 Permitting,

  17. Slide 17: ... To Grow Production and Reserves

    Slide 17: ... To Grow Production and Reserves

    = Continue development drilling at Corvina and Albacora oil fields = Continue applying new 3D o Btock xix seismic data = Prepare for Block Z-1 exploration campaign, starting with Delfin = Continue three-well exploration drilling program in Block XxXIll Hee (Refinery) = Obtain permit to drill selecte

  18. Slide 18: BPZ Energy contact information

    Slide 18: BPZ Energy contact information

    ~~) BPZ Energy ‘Dante ty Pial Spe Manolo Zufiiga President & CEO For additional information: A. Pierre Dubois Investor Relations & Corporate Communications 580 Westlake Park Blvd., Suite 525 Houston, Texas 77079 (281) 556-6200; pierre_dubois@bpzenergy.com www.bpzenergy.com @ 18

  19. Slide 19: Appendix - Summary Financial & Reserves Data

    Slide 19: Appendix - Summary Financial & Reserves Data

    —S Appendix - Summary Financial & Reserves Data Production (averages) First Quarter 2014 Approximately 2,571 bopd [5,045 bopd gross] Year 2013 1,408 bopd [2,761 bopd gross] Year End 2013 Proved developed producing 3.2 Mmbo Proved undeveloped 12.9 Mmbo Proved reserves 16.1 Mmbo Probable reserves 27.2

  20. Slide 20: EBITDAX Reconciliation

    Slide 20: EBITDAX Reconciliation

    .) BPZ Energy B) 7) consent tence The table below represents a reconciliation of EBITDAX to the Company's net loss, which is the most directly comparable financial measure calculated in accordance with generally accepted accounting principles in the United States of America. Earnings before interest

Source: SEC EDGAR · 8-K filed Apr 4, 2014

More decks from BPZ Resources Inc