    For personal use only AGM Presentation Unlocking the value and potential in Australia’s emerging major gold province 27 November 2018

  2. Slide 2: Disclaimer – Forward Looking Statements

    Disclaimer – Forward Looking Statements Important Disclaimer For personal use only This presentation (Presentation) has been prepared by Renegade Exploration Limited (Renegade) based on information available to it from them and third party sources. By retaining this Presentation, you (the Recipient)

  3. Slide 3: Overview

    Overview For personal use only 2018 – A Year of Action • Currently completing a ~7,000m follow up drill program • Initial Drill Program completed 23,689m testing 5 of 9 high-priority targets • Well funded to continue exploration Strategy • World Class Jurisdiction • Well Understood Geology • Camp Sc

  4. Slide 4: Yandal Greenstone Belt

    Yandal Greenstone Belt • The Yandal Greenstone Belt has produced in For personal use only excess of 10Moz of gold • The major production centre is at Jundee, located ~25km west of Yandal East • Northern Star has an exploration budget of $45M at Jundee following “multiple new gold discoveries” • Rene

  5. Slide 5: Target Generation

    Target Generation Structural Setting For personal use only • Within the Greenstone Belt • Proximal to a regional strike parallel structure (typically >100km) • Nimary Fault at Jundee • Celia Shear at Yandal East • A concentration of high angle, late, brittle cross cutting structures • Mineralisation

  6. Slide 6: Inaugural Aircore Drilling Program

    Inaugural Aircore Drilling Program For personal use only • 285 holes completed for 23,789m • Promising drill results received from Coralie Jean, Mizina, Ward and Millrose Extension • Drill hole YEAC0131 had mineralisation over 1 g/t Au over 75m down hole and included: • 11.5m @ 0.80 g/t Au from 117m

  7. Slide 7: Current Drilling Program at Mizina and Ward

    Current Drilling Program at Mizina and Ward For personal use only Mizina • ~ 2,000m planned for Mizina South Ward • Following up 200m along strike in each direction of YEAC0131 that intersected; • 11.5m @ 0.80g/t from 117m • 1m @ 2.56 g/t Au from 89m • 1m @ 1.34 g/t Au from 51m • ~ 2,000m planned fo

  8. Slide 8: Current Drilling Program – Other Areas

    Current Drilling Program – Other Areas • ~ 1,500m planned for Millrose Extension For personal use only • Drilling to test the contact with an internal granite along strike from YEAC0246 that intercepted 2m @ 0.99 g/t from 87m • Current drill spacing is 800m x 80m, so ample room for discovery • ~ 500

  9. Slide 9: Yandal East Project – Option to Earn a 75% Interest

    Yandal East Project – Option to Earn a 75% Interest Earn In Phase (18 months, to February 2019) For personal use only Issued 16.6M Shares (~$100,000) Issued 16.6M Options (exercise price $0.00754) Have spent $350,000 on exploration • Execution Phase • Issue $400,000 in Shares • Vendor retains 25

  10. Slide 10: Yukon Base Metal Project

    Yukon Base Metal Project For personal use only • Outcropping mineralisation discovered in 1996 • First drilled by Noranda in 2001 • Overland secured a 90% interest in the Project in 2007 • Overland’s Project covers 350km2: • Granted a new 5 Year Mining Land Use Permit in 2014 • Central claims in goo

  11. Slide 11: Yukon Base Metal Project - Resource

    Yukon Base Metal Project - Resource  JORC Compliant Mineral Resource For personal use only  Measured, Indicated and Inferred Mineral Resource:  12.6Mt at 6.0% Zn equivalent1  All deposits open at depth  Potential for Resource expansion and new discoveries Deposit Measured Indicated Inferred Tot

  12. Slide 12: Yukon Base Metal Project – 2012 Mining Study

    Yukon Base Metal Project – 2012 Mining Study • Two open pit mines (Andrew and For personal use only Darcy) • Extracting 8.0Mt @ 5.0% Zn & 1.5% Pb • 7 year mine life • Single processing plant: • ~90,000t Zn con p.a. @ 58% Zn for ~52,000t Zn (115m lbs) • ~20,000t Pb con p.a. @ 62% Pb for ~12,400t Pb (

  13. Slide 13: Enquiries and Further Information

    Enquiries and Further Information Robert Kirtlan For personal use only Director P: + 61 8 9388 6020 E: info@renegadeexploration.com The information in this presentation that relates to exploration results for the Yukon Base Metal Project or the Yandal East Gold Project is based on information compil