Prospex Oil and Gas PLC

Prospex Oil and Gas — Investor Presentation (May 2020)

25 slides from Prospex Oil and Gas's investor presentation, May 2020

  1. Slide 1: Prospex Oil & Gas plc Corporate Presentation

    Prospex Oil & Gas plc Corporate Presentation AIM : PXOG May 2020

  2. Slide 2: Disclaimer

    DISCLAIMER This Presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities nor shall it or any part of it form the basis of or be relied on in connection with, or act as any inducement to enter into, any contract or commitm

  3. Slide 3: At a Glance

    AT A GLANCE ► Company secured maiden reserves and revenue in 2018 Background ► Ongoing production and significant ramp up planned for 2021 ► Presently trading at substantial discount to market-based valuation ► Existing portfolio provides diversified risk profile Portfolio ► Multiple routes to signi

  4. Slide 4: About Prospex

    ABOUT PROSPEX AIM listed multi-asset natural resources company committed to building a material, cash generating European natural gas business. Experienced Board with strong acquisition and development capabilities. Latest acquisition: El Romeral, Spain ► Prospex and partner, Warrego Energy, have ag

  5. Slide 5: Latest Acquisition: El Romeral, Spain

    Latest Acquisition: El Romeral, Spain

  6. Slide 6: El Romeral: Production & Development Project

    EL ROMERAL: PRODUCTION & DEVELOPMENT PROJECT Extensive History and Development Potential History ►3 dry wells drilled in the 1950s ►Since 1983, 7 wells have been drilled, Uceda all gas discoveries El Romeral Power Station El Romeral-3 Aventurado North ►5 went on production ►2 proven undeveloped El R

  7. Slide 7: El Romeral Electricity Production

    EL ROMERAL ELECTRICITY PRODUCTION ►El Romeral 8.1 MW power station constructed in 2001 ►Facilities cost €10MM to construct ►3 Jenbacher generators with aggregate capacity of ~ 50,000 scmg/d ►Selling electricity directly to the grid Electricity production per year ►Connected to 25 km of project-owned

  8. Slide 8: El Romeral: Exploration Upside

    EL ROMERAL: EXPLORATION UPSIDE ► Estimated Gross Unrisked Prospective Resources of gas: Low Estimate 48 Bcf / Best Estimate 90 Bcf / High Estimate 154 Bcf Classified in Report by NSAI, 2019 as 1U 2U 3U very low risk targets (COS>50%) 45.0 39.2 1C 2C 3C 40.0 6.0 35.0 32.2 4.9 30.0 5.0 26.1 25.0 25.0

  9. Slide 9: Spain – Macroeconomic Environment

    SPAIN – MACROECONOMIC ENVIRONMENT Overview Spain – long-term pipeline and LNG contracts Long-term contracts cover ~50% of expected demand – highlighting ► Gas price at ~ €5-6 per MWh the scale of surplus LNG receiving capacity available ► Government subsidies for power generation based on gas 60 ► S

  10. Slide 10: Other Assets: Romania, Italy and Spain

    Other Assets: Romania, Italy and Spain

  11. Slide 11: Existing Assets - Overview

    EXISTING ASSETS - OVERVIEW EIV-1 SUVEAVA, ROMANIA (WI 50%, Raffles Energy 50%) 2 ► Exploration Concession of 984 km ► Bainet-1 discovery - producing from 2018, with average rates in 2019 at c. 0.5 mmscfg/d ► West Bainet exploration drilling in Q2 2019 – dry hole ► Continuing exploration programme on

  12. Slide 12: Romania – Suceava Concession

    ROMANIA – SUCEAVA CONCESSION PRODUCING ASSET WITH EXPLORATION UPSIDE WI 50%, Raffles Energy 50% (Operator) Location • EIV-1 Suceava 984 km2 • Proven gas area of NE Romania Production • Commenced production in September 2018 • c. 0.53 mmscf/d (c.15,000 scmgd) production from Bainet in 2018 Bainet-1 P

  13. Slide 13: Italy – Podere Gallina Permit

    ITALY – PODERE GALLINA PERMIT GAS RESERVES PXOG WI 17%, UOG 20%, PVE 63% (Operator) Location • Podere Gallina Exploration Permit covers 331 km² • Prolific Po Valley region Selva Gas Discovery • Podere Mair-1dir well drilled in December 2017 • Selva gas discovery in January 2018 • Gas flows from 2 re

  14. Slide 14: Italy – Selva Gas Production

    ITALY – SELVA GAS PRODUCTION Steps to getting on production 1. Preliminary production concession, approved Feb 2019 2. Technical environmental approval, approved Jan 2020 3. Environment Minister Decree 4. INTESA (Intergovernmental agreement) 5. Final Production concession by Economic Development Min

  15. Slide 15: Spain – Tesorillo Project

    SPAIN – TESORILLO PROJECT UNDEVELOPED DISCOVERY-“TIGER ON A LEASH” WI 100% Tarba (Operator)- which is owned 15% by PXOG with option to increase to 49.9%; balance owned by WGO Location • Tesorillo and Ruedalabola licences cover 380 km2 in Cadiz Province, south Spain • Contains the Almarchal-1 gas dis

  16. Slide 16: Reserves and Resources

    RESERVES AND RESOURCES Net 2P Reserves - Bcf Net Prospective resources - Bcf El Romeral Licences (El Ciervo / Santa Clara / Sevilla-1) Tesorillo / 0.15 0.3 Ruedalabola 125 414 Licence 0.24 15% with option to take 49.9% 3 Bcf El Romeral 45 Licences East Selva 2.3 5.9 Podere Gallina Licence (Selva Pod

  17. Slide 17: The Team; Outlook & Objectives

    The Team Outlook & Objectives

  18. Slide 18: The Team

    THE TEAM Edward Dawson CEO & Managing Director With a BEng and an MSc in investment analysis, Edward has over 15 years' experience in the oil and gas sector. He has financed, managed and been a key investor in several oil and gas companies. Positions held include: MD of Peppercoast Petroleum plc and

  19. Slide 19: Team with Requisite Skills

    TEAM WITH REQUISITE SKILLS Commercial: Technical: ►Deal Sourcing ►Fast New Opportunity Assessment ►Farm-in, JVA, JOA ►Basin & Petroleum System Analysis ►Work Programme Design and ►Farm-out and Divestment Execution E&P Core Capital Markets: Business Administration: ►Equity/Debt raising ►Legal Agreeme

  20. Slide 20: Technical Rationale

    TECHNICAL RATIONALE Foreland/Foredeep basins typically host turbidites charged with gas Foreland/Foredeep C Mountain Range B Thrust A Spanish Assets B Italian Asset C Romanian Asset A A A B C HINTERLAND FORELAND Advantages of foreland/foredeep basins: ► Low geological risk, because reservoirs and se

  21. Slide 21: Outlook for 2020-2021

    OUTLOOK FOR 2020-2021 2020 2021 Q1 Q2 Q3 Q4 Q1 EL ROMERAL - ACQUISITION PLANNING OF DRILLING CAMPAIGN GOVERNMENT APPROVAL OF TRANSFER PERMITTING 3 WELL CAMPAIGN SPAIN ELECTRICITY PRODUCTION REVENUES WELL LOCATION TESORILLO – GEOLOGY + GEOPHYSICS INTEGRATION; FIELD WORK COMPLETION WELL PERMITTING - D

  22. Slide 22: Pro Forma Production Profile

    PRO FORMA PRODUCTION PROFILE In 2022 PXOG expects to be producing gas from 5 wells, including: ► Ongoing production from Bainet-1 well, Romania, started in 2018 at 15,000 scmg/d ► Production from Podere Maiar-1, expected in H1 2021 at rates up to 150,000 scmg/d ► Ongoing production from three wells

  23. Slide 23: Objectives

    OBJECTIVES Prospex Growth Prospects ►Existing opportunities for significant revenue growth as existing discoveries are brought into production and through drilling of new low risk wells. ►Existing opportunities for significant reserves growth in diversified geographic areas. Short Term: ► Drill mult

  24. Slide 24: Summary

    SUMMARY Investment case: Unlocking shareholder value: • Secured reserves and commercial revenue • Diversified portfolio assembled generation in 2018 • Risk managed • Significant step up in production expected • Multiple routes to significant shareholder in 2021 value growth • Presently trading at su

  25. Slide 25: Thank you

    @. nospex OIL & GAS PLC Thank you

Prospex Oil & Gas — Investor Presentation (May 2020) on 6ix