Approach Resources Inc

Approach Resources — Q2 2015 Earnings Presentation

21 slides from Approach Resources's earnings presentation, Aug 6, 2015

  1. Slide 1: Second Quarter 2015 Results

    Exhibit 99.2 Second Quarter 2015 Results AUGUST 5, 2015

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements, other than statements of historical facts, included in this presentation that addre

  3. Slide 3: Company overview

    Company overview AREX OVERVIEW ASSET OVERVIEW Enterprise value $671MM High-quality reserve base 146 MMBoe proved reserves 66% Liquids, 38% oil $1.4 BN proved PV-10 Permian core operating area 143,000 gross (130,000 net) acres ~1+ BnBoe gross, unrisked resource potential ~2,000 Identified HZ drilling

  4. Slide 4: 2Q15 Key highlights

    2Q15 Key highlights 2Q15 HIGHLIGHTS 2Q15 SUMMARY RESULTS • Drilled 9 and completed 10 HZ wells Production (MBoe/d) 15.3 % Oil 36% • Continued improvement on already best- % Total liquids 65% in-class HZ well costs Average realized price ($/Boe) Average realized price, excluding commodity derivatives

  5. Slide 5: 2Q15 Operating highlights

    2Q15 Operating highlights OPERATING HIGHLIGHTS Delivering • Total record quarterly production 15.3 MBoe/d (up 8% QoQ) Production • Oil production 499 MBbl (up 1% QoQ) Growth • Successfully implemented cost reduction initiatives, current HZ well costs now averaging Maximizing $4.5 MM per well, down 1

  6. Slide 6: 2Q15 Financial highlights

    2Q15 Financial highlights FINANCIAL HIGHLIGHTS • Revenues (pre-hedge) of $38.6 MM, $47.9 MM with hedges Heightened • Adjusted net loss (non-GAAP) of $2.8 MM, or $0.07 per diluted share Focus on Cutting • Every per-unit cash cost metric has improved since 2Q14 Costs • 2Q15 Cash operating costs totale

  7. Slide 7: Lowest cost structure in the Permian Basin

    Lowest cost structure in the Permian Basin AREX LOE Historical Track Record ($/Boe) Permian Peer LOE ($/Boe) $8.00 $14.0 $13.26 $7.36 $7.00 $6.65 $12.0 $11.23 $6.18 $5.87 $6.00 $5.55 $10.0 $9.63 $9.03 $4.97 $8.78 $5.00 $8.14 $7.83 $7.58 $8.0 $4.00 $6.0 $3.00 $4.97 $4.0 $2.00 $1.00 $2.0 $0.00 $0.0 1Q

  8. Slide 8: AREX Flowback and Produced Water Recycle Facility

    AREX Flowback and Produced Water Recycle Facility • 2 MM Bbls flowback and produced water recycled since inception Second Quarter 2015 Results – August 2015 8

  9. Slide 9: Strong, simple balance sheet

    Strong, simple balance sheet • At June 30, 2015, we had a $1 billion senior secured revolving AREX Liquidity and Capitalization credit facility in place, with aggregate lender commitments of AREX Capitalization as of 6/30/2015 ($ MM) $450 MM and borrowing base of $525 MM Cash $0.8 • Following the Sp

  10. Slide 10: Valuation and leverage well supported by proved reserve base

    Valuation and leverage well supported by proved reserve base • 12/31/2014 reserve summary prepared by DeGolyer and MacNaughton • Replaced 819% of produced reserves at a drill-bit F&D cost of $8.94 per Boe 1 • Total proved reserves up 27% YoY, proved oil reserves up 20% YoY • PV-10 up 25% YoY to a re

  11. Slide 11: D&C Cost reductions will significantly improve profitability

    D&C Cost reductions will significantly improve profitability 70% $4.0MM D&C 60% $4.5MM D&C $5.0MM D&C 50% 40% 30% 20% 10% 0% $40 $50 $60 $70 $80 $90 Realized Oil Price ($/Bbl) Note: HZ Wolfcamp economics assume $4.00/Mcf realized natural gas price and NGL price based on 40% of realized oil price. Se

  12. Slide 12: Established infrastructure in place is critical to low cost structure

    Established infrastructure in place is critical to low cost structure Reagan Irion Pangea Crockett Schleicher West Recently completed water recycling facility 329,000 Bbl Capacity North & Central Pangea South Benefits of water recycling Pangea • Reduce D&C cost • Reduce LOE • Increase project profit

  13. Slide 13: Current hedge position

    Current hedge position • Based on the midpoint of updated 2015 guidance, approximately 85% of forecasted 3Q15-4Q15 oil production and 32% of forecasted natural gas production are hedged at weighted average floor prices of $75.93/Bbl and $4.06/MMBtu, respectively. Commodity & Period Contract Type Vol

  14. Slide 14: Production and expense guidance

    Production and expense guidance Updated 2015 Guidance Production Oil (MBbls) 1,900 – 1,975 NGLs (MBbls) 1,575 – 1,625 Natural Gas (MMcf) 11,550 – 11,700 Total (MBoe) 5,400 – 5,550 Operating costs and expenses (per Boe) Lease operating $5.50 - $6.50 Production and ad valorem taxes 7.50% of oil & gas

  15. Slide 15: Appendix

    uf, APPROACH RESOURCES, Appendix

  16. Slide 16: Adjusted net (loss) income (unaudited)

    Adjusted net (loss) income (unaudited) ADJUSTED NET (LOSS) INCOME (UNAUDITED) The amounts included in the calculation of adjusted net (loss) income and adjusted net (loss) income per diluted share below were computed in accordance with GAAP. We believe adjusted net income and adjusted net income per

  17. Slide 17: EBITDAX (unaudited)

    EBITDAX (unaudited) EBITDAX (UNAUDITED) The amounts included in the calculation of EBITDAX were computed in accordance with GAAP. EBITDAX is not a measure of net income or cash flow as determined by GAAP. EBITDAX is presented herein and reconciled to the GAAP measure of net income because of its wid

  18. Slide 18: Cash operating expenses

    Cash operating expenses Cash operating expenses We define cash operating expenses as operating expenses, excluding (1) exploration expense, (2) depletion, depreciation and amortization expense and (3) share-based compensation expense. Cash operating expenses is not a measure of operating expenses as

  19. Slide 19: F&D costs (unaudited)

    F&D costs (unaudited) All-in finding and development (“F&D”) costs are calculated by dividing the sum of F&D Cost reconciliation property acquisition costs, exploration costs and developmentcosts for the year by the sum of reserve extensions and discoveries, purchases of minerals in place and Cost s

  20. Slide 20: PV-10 (unaudited)

    PV-10 (unaudited) The present value of our proved reserves, discounted at 10% (“PV-10”),was estimatedat $1.4 billion at December 31, 2014, and was calculated based on the first-of-the-month, twelve-month average prices for oil,NGLs and gas, of $94.56 per Bbl of oil, $31.50 per Bbl of NGLs and $4.55

  21. Slide 21: Contact information

    Contact information SERGEI KRYLOV Executive Vice President & Chief Financial Officer 817.989.9000 ir@approachresources.com www.approachresources.com

Approach Resources — Q2 2015 Earnings Presentation on 6ix