Slide 1: Building a Resource Company Factory
For personal use only Building a Resource Company Factory Brisbane Mining 2013 Resources Convention
Slide 2: Disclaimer
Disclaimer For personal use only Forward Looking Statement Whil based Whilst b d on iinformation f i ffrom sources considered id d reliable, li bl DGR Gl Global b l Li Limited, i d iits di directors, employees and consultants do not represent, warrant or guarantee, expressly or impliedly, that the i
Slide 3: A diversified and undervalued asset pool
A diversified and undervalued asset pool For personal use only • VALUE OF SHAREHOLDING IN LISTED ASSETS post rights issue: $50.5m • Market Cap @ 4.3 cents $17.6 m • DIVERSIFIED PORTFOLIO OF RESOURCES ‐ gold, silver, copper, nickel, tin, iron ore, titanium, oil & gas • GLOBAL PRESENCE spreading expos
Slide 4: The Recipe for Success
The Recipe for Success For personal use only 1. TALENTED PEOPLE – Dedicated, invested staff, think laterally – Help them get rich via project & corporate success – Economic E i b buy iin b by llocall communities ii 2. BIG PROJECTS – Provinciall tenement coverage off nationall relevance l – Strong co
Slide 5: Orbis' Gold projects are very high grade
Orbis’ Gold projects are very high grade. DGR h holds ld 17 17.8% 8% off O Orbis bi For personal use only 9 8 Nabanga (0.5g/t Au cut‐off grade) 7 6 Au 5 g/t A 4 3 2 Median 1 0 Gold Deposits 5 Three times the global gold resource replacement grade
Slide 6: Armour Energy - A New Regional Gas Giant
Armour Energy - A New Regional Gas Giant (DGR 25%) For personal use only • Provincial tenement p position Armour Energy permit size relative to shale gas basins in Texas • 100% owned • National and global relevance • Gas is the most acceptable globally demanded energy source • Access to infrastructu
Slide 7: Armour – a new shale oil province in the Macarthur Basin?
Armour – a new shale oil province in the Macarthur B i ? Basin For personal use only
Slide 8: Armour Energy – two new gas provinces
Armour Energy – two new gas provinces For personal use only • 4 wells, 3 months, 3 discoveries in 2012 • 2013 – Egilabria 2 awaiting “proof of concept” concept production test
Slide 9: Arrow Energy started up like Armour
Arrow Energy started up like Armour For personal use only Arrows Kogan gas Project in 2003 !!!!!!
Slide 10: SolGold – DGR 9%
SolGold – DGR 9% Cascabel: An Outstanding Gold Copper Project in Ecuador For personal use only • New mining friendly Ecuador • Relatively unexplored • Worlds richest copper trend • Earning 85% Cascabel with $3$3.7m 7m • Close to power port rail roads and water • 550k oz eq in Queensland • Outstandin
Slide 11: Cascabel: In The Company Of Giants
Cascabel: In The Companyy Of Giants For personal use only Sphere size denotes Page 11 contained Cu (mt)
Slide 12: Porphyry Cu-Au Target at Alpala Lies above a Magnetic Apophysis
Porphyry Cu-Au Target at Alpala Lies above a M Magnetic ti Apophysis A h i For personal use only
Slide 13: Cascabel Lithocap More Extensive than Tujuh Bukit
Cascabel Lithocap p More Extensive than Tujuh j Bukit For personal use only Comparable Potential Scale to the 1.9 billion tonne Tujuh Bukit Gold‐Copper Project in Indonesia held by Intrepid Mines (19 billion pounds of Copper, 28 million ounces of Gold1) 1. Intrepid Mines ASX Announcement ‐ 9/10/12 P
Slide 14: Surface Channel Samples & Stage Drillholes
Surface Channel Samples & Stage 1 Drillholes For personal use only Page 14
Slide 15: Outstanding Results in Drill Hole
Outstanding Results in Drill Hole 1 (306m @ 00.39% 39% Cu & 0 0.48 48 g/t Au) For personal use only Significant I Intersections i ffrom CSD‐13‐001 Include: • 306m @ 0.39% Cu, 0.48 g/t Au (from 16m)) • 104m @ 0.37% Cu, 0.38 g/t Au (from 16m) • 100m @ 0.65% Cu, 1.00 g/t Au (from 222m) Page 15
Slide 16: Cascabel could be a giant world class Cu Au Porphyry
Cascabel could be a g giant world class Cu Au Porphyry p yy For personal use only High Grade copper mineralisation at Cascabel
Slide 17: IronRidge - Population growth and urbanisation to drive steel demand
IronRidge ( DGR 45%) - Population growth and urbanisation to drive steel demand for coming decades For personal use only 7.5 World urban population growth (Billion people) Chinese peak steel production and iron ore requirements 7.0 1200 1600 6.5 The world is set to urbanise 1400 1000 close to anothe
Slide 18: IronRidge Resources
IronRidge Resources Developing Large Scale Scale, Bulk Commodity Projects For personal use only Belinga Project (CMEC/Gabonese Govt) —860Mt @ 63%Fe 2 Belinga Project (CMEC/Gabonese Govt) —860Mt @ 63%Fe 2 2Mining Journal, ’BHP looks set to bag Belinga Iron Project’ (Feb 10,2012) Page 10.
Slide 19: IronRidge Resources – Tchibanga High Grade Iron Potential
IronRidge Resources Tchibanga – High Grade Iron Potential Potential, <70km to Port For personal use only Known Resources @180Mt Preliminary Interpretation (National Park) • Recently acquired Falcon Gravity Data, cost saving of $900k • Based on “new” data, additional 1400km2application. 100% Gravity
Slide 20: IronRidge Tchibanga – New Application and Falcon Gravity Data
IronRidge Tchibanga – New Application and Falcon Gravity Data C Coverage (100%) For personal use only Known Mineralisation A (National Park) IRONRIDGE GBON – NEW APPLICATION: 1,400km2 B C Huge downstrike potential in identical geological setting IRONRIDGE GABON TCHIBANGA PERMIT Mont Pele 1,990km2
Slide 21: Tchibanga – Identical Gravity & Magnetic Signatures
Tchibanga – Identical Gravity & Magnetic Signatures Minlingui <70km NW along strike from Tchibanga For personal use only MILINGUI TCHIBANGA 5km 12km Downstrike at Tchibanga, Mag+Grav Strong coincident response of Mag Mag+Grav Grav maps theh FFe-bearing b i L Loukoula k l G Grp with ih over known min
Slide 22: IronRidge - Key Results from Tchibanga Reconnaissance
IronRidge g - Keyy Results from Tchibanga g Reconnaissance For personal use only 60.62% Fe 55.44% Fe 48 86% Fe 48.86% F 49 49% Fe 49.49%
Slide 23: AusNiCo's Flagship Taronga Tin Project
AusNiCo’s ((DGR 14%)) Flagship g p Taronga g Tin Project j For personal use only • World class asset • 57,200 tonnes of contained tin • 26,400 tonnes of contained copper • 4.4Moz contained silver • Regional exploration extremely prospective • Simple metallurgy compared to other projects • Located cl
Slide 24: The deposit occupies a large hill and the low strip ratio will reduce mining costs
The deposit occupies a large hill and the low strip ratio will reduce mining costs For personal use only • Overall Life of Mine Strip ratio of 2.0:1 • Proposed P d open cutt to t a depth d th off 150m 150 tto 200 200m (b (butt with ith mineralisation i li ti tto 450 450m))
Slide 25: Taronga is well placed with a PFS previously completed
Taronga g is well p placed with a PFS p previously y completed p For personal use only • Newmont led JV completed a pre-feasibility study in 1982 • Over O five fi years the th JV spentt over $7.4M $7 4M ($21M 2012 tterms)) • Completed over 33,000m drilling (including over 73% diamond) and 3 adits fo
Slide 26: Taronga – a recent review of plant CAPEX & OPEX confirms economics
Taronga – a recent review of plant CAPEX & OPEX confirms economics For personal use only • Independent re-costing of plant CAPEX & OPEX • Predicted P di t d operating ti cash h flflow off $13.08/tonne $13 08/t over 12 tto 13 year LOM • No inclusion of potential metal by-product credits, increased LO
Slide 27: Taronga - Simple mineralogy allows for conventional processing
Taronga g - Simple p mineralogy gy allows for conventional p processing g For personal use only • Coarse cassiterite (up to 3mm) which is substantially liberated at 1.5mm • Cassiterite associated with sulphides and quartz within vein stock work Example E l off coarse cassiterite it it and d higher g
Slide 28: In addition there is increased Grade potential at Depth
In addition there is increased Grade potential at Depth For personal use only • Limited drilling at depth, what was done indicates grade at depth (up to 1.67%Sn over 1 m)
Slide 29: Contacts
Contacts For personal use only Nick Mather | CEO nmather@dgrglobal.com.au Greg Runge | General Manager grunge@dgrglobal.com.au Karl Schlobohm| Company Secretary kschlobohm@dgrglobal com au kschlobohm@dgrglobal.com.au ASX:DGR | www.dgrglobal.com.au