Exxaro Resources Limited · JSE:EXX

Exxaro Resources — H1 2015 Earnings Presentation

51 slides from Exxaro Resources's earnings presentation, August 2015

  1. Slide 1: Interim Results Presentation for the six-month period ended 30 June 2015

    Slide 1: Interim Results Presentation for the six-month period ended 30 June 2015

    INTERIM RESULTS PRESENTATION for the six-month period ended 30 June 2015

  2. Slide 2: Presentation format

    Slide 2: Presentation format

    Presentation format Strategy and portfolio Sipho Nkosi Carbon operational performance Mxolisi Mgojo Financial performance Wim de Klerk Outlook Sipho Nkosi 2

  3. Slide 3: Strategy and Portfolio

    Slide 3: Strategy and Portfolio

    STRATEGY AND PORTFOLIO SIPHO NKOSI

  4. Slide 4: Challenging market conditions

    Slide 4: Challenging market conditions

    Challenging market conditions 1H15 commodity prices (%)* Thermal coal Natural gas Aluminium Palladium Met coke Uranium Platinum Brent oil Iron ore Copper Mn ore Zircon Nickel FeMn Rutile Silver Steel TiO 2 FeCr Gold Zinc 10 0 (10) (20) (30) General Exxaro Share price performance 1H15 (%)* • Continue

  5. Slide 5: Exxaro's business

    Slide 5: Exxaro's business

    Exxaro’s business OWNER-CONTROLLED NON-CONTROLLED OPERATIONS INVESTMENTS CARBON OPERATIONS: FERROUS: INVESTMENT PORTFOLIO: • Grootegeluk Complex • FerroAlloys • 20% in SIOC** (Thabametsi) • 44% in Tronox • Matla (Tied mine) • 50:50 Joint Ventures: • Arnot (Tied mine) ̶ Mafube with Anglo • Inyanda ̶

  6. Slide 6: Exxaro's strategy

    Slide 6: Exxaro's strategy

    Exxaro’s strategy SHORT TERM OPERATING CAPITAL PROJECT BEE OWNERSHIP GOVERNANCE FOCUS EFFICIENCIES (decision-making criteria) • Preserve cash and • Target to be in the • Unwinding of the BEE • Investment rate of reduce overhead costs lowest half of the cost Holdco structure and return and net presen

  7. Slide 7: Exxaro's response to market conditions 1H15 vs 2H14

    Slide 7: Exxaro's response to market conditions 1H15 vs 2H14

    Exxaro’s response to market conditions 1H15 vs 2H14 AT 20 AUGUST 2015 AS REPORTED AT 05 MARCH 2015  BEE Holdco STRATEGIC  Mayoko Iron Ore Project CONSIDERATIONS  Tronox  Thabametsi phase 2 PFS* and BFS** DELAY  Moranbah South  Mafube Nooitgedacht  Reductants: retorts 5 and 6  Belfast project

  8. Slide 8: TCSA acquisition

    Slide 8: TCSA acquisition

    TCSA acquisition Rationale • Increase long-term export allocation by 4,1Mtpa* • Improve our carbon portfolio RBCT# shareholding percentage • Unlock synergies 25.3 23.3 Broad-based BEE 21.1 • Sustainable and commercial basis • In addition to the current arrangement 11.7 14.4 with Mmakau Mining** 4.2

  9. Slide 9: Carbon Operational Performance

    Slide 9: Carbon Operational Performance

    CARBON OPERATIONAL PERFORMANCE MXOLISI MGOJO

  10. Slide 10: Safety, health and environment

    Slide 10: Safety, health and environment

    Safety, health and environment Safety Reportable fatalities • No fatalities • LTIFR* improved to 0,17 1 • Number of LTIs** down 41% against 1H14 1H13 2H13 1H14 2H14 1H15 Health • Measuring occupational and chronic diseases routinely LTIFR • Encouraging healthy lifestyle for productive 0.22 0.21 empl

  11. Slide 11: Carbon production volumes

    Slide 11: Carbon production volumes

    Carbon production volumes Main features Thermal coal production (Mt) • Coal production tonnes in line with 1H14 0,9 1,2 • Tied mines down 32% on 1H14 and 29% 0,5 1,0 1,0 on 2H14 5,8 6,1 4,2 5,6 • Commercial mines up 17% on 1H14 6,0 and 2% on 2H14 • Matla mine 1 closure and challenging 12,1 12,7 11,6

  12. Slide 12: Carbon sales volumes

    Slide 12: Carbon sales volumes

    Carbon sales volumes Main features Thermal coal sales (Mt) • Thermal coal sales up 4% on 1H14 • Domestic metallurgical coal sales up 2,3 2,3 2,2 1% on 1H14 1,6 2,2 6,1 5,8 4,2 • Export coal sales volumes down 12% 5,6 5,8 on 2H14 • 73% decrease in trains utilised at 10,7 11,6 12,5 12,8 10,2 Grootegel

  13. Slide 13: Carbon exports

    Slide 13: Carbon exports

    Carbon exports Main features TFR* railings received by RBCT (Mt)** • Grootegeluk ramp-up • Inyanda closure • Re-prioritisation of production to power 72 77 74 69 67 station coal in the short term • Cancellation of Leeuwpan lean coal exports • No Maputo exports 1H13 2H13 1H14 2H14 1H15 Exports per mi

  14. Slide 14: Carbon market outlook

    Slide 14: Carbon market outlook

    Carbon market outlook Power generation and steam coal Coal and market coke prices (US$/t)* • Healthy domestic demand R/t US$/t 350 100 100 • Majuba power station coal handling risk 75 75 250 Metals 50 50 • Increased margin pressure 150 • Customers reduced capacity 25 25 0 Reductants 50 0 2013 2014 2

  15. Slide 15: Focus on carbon growth and portfolio optimisation

    Slide 15: Focus on carbon growth and portfolio optimisation

    Focus on carbon growth and portfolio optimisation 2H15 • Belfast detailed engineering Belfast • TCSA conditions precedent finalised and Capex: R3,7bn optimisation Product: 2,7Mtpa • Inyanda closure 1st production: 3Q18 • Thabametsi phase 1 BFS completion 1H16 • Belfast IWUL and re-zoning appeals Gro

  16. Slide 16: Financial Performance

    Slide 16: Financial Performance

    FINANCIAL PERFORMANCE WIM DE KLERK Disclaimer: The financial information on which any outlook statements are based has not been reviewed or reported on by the external auditors. These forward-looking statements are based on management’s current beliefs and expectations and are subject to uncertainty

  17. Slide 17: Financial excellence: highlights

    Slide 17: Financial excellence: highlights

    Financial excellence: highlights Owner-controlled operations Revenue (Rb) 0.1 0.1 • Group revenue of R8,3 billion, down 7% 0.1 0.1 0.1 • Core carbon NOP* at R1,7 billion, up 14% 8,9 8,2 6,1 7,2 7,3 Non-controlled operations SIOC 1H13 2H13 1H14 2H14 1H15 • R0,6 billion core post-tax equity-accounted

  18. Slide 18: Financial overview: IFRS

    Slide 18: Financial overview: IFRS

    Financial overview: IFRS* % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Revenue 8 324 8 989 (7) 7 412 12 Operating expenses (6 513) (8 577) 24 (6 620) 2 Other income 578 888 Impairment charges (202) (5 760) Net operating profit/(loss) 1 811 788 130 (4 080) (144) Net operating

  19. Slide 19: Financial overview: non-core adjustments

    Slide 19: Financial overview: non-core adjustments

    Financial overview: non-core adjustments R million 1H15 2H14 1H14 Carbon (11) (9) (13) – Loss on sale of other non-core assets, voluntary severance (11) (9) (13) packages and insurance claim income Ferrous 73 (10) (5 807) – Mayoko project partial reversal of write-off/(impairment) 4 (5 807) – Profit

  20. Slide 20: Financial overview: core

    Slide 20: Financial overview: core

    Financial overview: core* % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Revenue 8 324 8 989 (7) 7 412 12 Operating expenses (6 882) (8 467) 19 (6 526) (5) Other income 578 888 Net operating profit 1 442 1 100 31 1 774 (19) Net operating profit margin (%) 17 12 5 24 (7) Post-ta

  21. Slide 21: Financial overview: HEPS contribution

    Slide 21: Financial overview: HEPS contribution

    Financial overview: HEPS contribution* Increase/ Increase/ (decrease) in (decrease) in Cents % % % contribution % % contribution 1H15 contribution 2H14 contribution 1H15 vs 2H14 1H14 contribution 1H15 vs 1H14 JSE** HEPS 303 100 579 100 793 100  Carbon 329 109 299 52 57 415 52 57  Ferrous 146 48 29

  22. Slide 22: Financial overview: carbon core

    Slide 22: Financial overview: carbon core

    Financial overview: carbon core % Change % Change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Revenue 8 217 8 864 (7) 7 312 12 – Tied operations 1 847 2 483 (26) 2 094 (12) – Commercial operations 6 370 6 381 5 218 22 Net operating profit 1 675 1 470 14 1 849 (9) – Tied operations 102 111 (8)

  23. Slide 23: Carbon contribution: core (owner-controlled)

    Slide 23: Carbon contribution: core (owner-controlled)

    Carbon contribution: core (owner-controlled) Main features Net operating profit variance analysis (Rm) • 14% increase in NOP • Positive ZAR/US$ exchange rate impact 84 46 (578) 454 6 1 675 1 470 19 • Stable inflationary impact 26 148 • Quantum of water liability revised Core Inflation Exchange Price

  24. Slide 24: Carbon capital expenditure

    Slide 24: Carbon capital expenditure

    Carbon capital expenditure Actual Estimate* R million 1H14 2H14 1H15 2H15 FY16 FY17 Sustaining 434 806 658 1 359 3 575 3 624 – GG** load out station 3 11 10 211 1 246 – GG trucks, shovels and stacker reclaimers 81 329 392 489 892 952 – GG discard conveyor project 9 929 – GG backfill phase 2 39 23 56

  25. Slide 25: TCSA transaction

    Slide 25: TCSA transaction

    TCSA transaction Main features Key historical indicators • Acquisition price of US$270 million Indicator for year ended - Upfront US$262 million 31 December 2013 2014 Production and sales - Deferred payment (derivative) linked to Total ROM# production Mt 6,6 5,9 future Richards Bay API4 performance

  26. Slide 26: Ferrous contribution: core (owner-controlled)

    Slide 26: Ferrous contribution: core (owner-controlled)

    Ferrous contribution: core (owner-controlled) Main features Net operating loss variance analysis (Rm) 1H15 actual Core Inflation Price Volume Cost Rehab Core • Mayoko net cash outflow R48 million 2H14 1H15 • Core net operating loss down 61% to R121 million • AlloyStream™ terminated (3) (121) Mayoko

  27. Slide 27: Ferrous contribution: core (non-controlled investments)

    Slide 27: Ferrous contribution: core (non-controlled investments)

    Ferrous contribution: core (non-controlled investments) HEPS contribution to group (cents) Post-tax equity contribution (Rb) 577 577 2,0 2,1 483 1,7 346 1,2 179 0,6 1H13 2H13 1H14 2H14 1H15 1H13 2H13 1H14 2H14 1H15 62% Fe Platts US$/dmt* CFR China Dividend declared (Rb) 150 2013 average: 136 1,8 120

  28. Slide 28: TiO2 and Alkali Chemicals contribution: core (non-controlled investments)

    Slide 28: TiO2 and Alkali Chemicals contribution: core (non-controlled investments)

    TiO2 and Alkali Chemicals* contribution: core (non-controlled investments) Main features HEPS contribution to group (cents) • Acquisition of Alkali Chemicals in 2Q15 • Total debt of US$3,1 billion 1H13 2H13 1H14 2H14 1H15 • Higher finance charges impact HEPS contribution negatively (47) (62) • Trans

  29. Slide 29: Group net operating profit: core (2H14 vs 1H15)

    Slide 29: Group net operating profit: core (2H14 vs 1H15)

    Group net operating profit: core (2H14 vs 1H15) R million 369 1 811 6 452 1 442 312 1 100 5 49 (578) 385 788 23 IFRS Non-core Core Core Non-core IFRS Inflation Exchange Price GMEP Volume Cost Rehab NCC 2H14 items 2H14 1H15 items 1H15 Carbon 1 461 9 1 470 19 84 46 (578) 26 148 454 6 1 675 (11) 1 664

  30. Slide 30: Attributable earnings: core

    Slide 30: Attributable earnings: core

    Attributable earnings: core % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Net operating profit 1 442 1 100 31 1 774 (19) Net financing cost (326) (60) (43) Income from investments 1 2 (50) 7 (85) Post-tax equity-accounted income 96 1 150 (92) 1 519 (93) – SIOC 636 1 228 (48) 1

  31. Slide 31: Capital funding structure

    Slide 31: Capital funding structure

    Capital funding structure Ratios* Target 1H15 2H14 1H14 - Net financing cost cover (times): EBITDA >4 7 26 49 - Return on equity: headline earnings (%) 3 6 8 - Return on capital employed (%)** >20 6 5 9 - Net (cash)/debt: market capitalisation exposure (%) (0,2) 3 5 - Net (cash)/debt: equity (%) <40

  32. Slide 32: Net debt/(cash) variance

    Slide 32: Net debt/(cash) variance

    Net debt/(cash) variance R million 1 071 (2 330) 162 (985) 1 001 (7) (55) 752 74 207 Net debt Cash Net financing Tax Dividends Capital Investing Dividends Other Net cash Dec 2014 generated costs paid expenditure activities received Jun 2015* * Latest FY15 internal forecast R4,3 billion at 12% debt:

  33. Slide 33: Dividend

    Slide 33: Dividend

    Dividend Interim Interim Final Total dividend dividend dividend dividend 30 Jun 2015 30 Jun 2014 31 Dec 2014 31 Dec 2014 Attributable earnings per share* (cents) 228 806 568 1 374 Dividend declared per share (cents) 65 260 210 470 Dividend cover* (times) 3,5 3,1 2,7 2,9 Dividend declared (Rm) 233 93

  34. Slide 34: Outlook

    Slide 34: Outlook

    OUTLOOK SIPHO NKOSI Disclaimer: The financial information on which any outlook statements are based has not been reviewed or reported on by the external auditors. These forward-looking statements are based on management’s current beliefs and expectations and are subject to uncertainty and changes in

  35. Slide 35: Exxaro's response to market conditions 2H15 vs 1H15

    Slide 35: Exxaro's response to market conditions 2H15 vs 1H15

    Exxaro’s response to market conditions 2H15 vs 1H15 OUTLOOK FOR REMAINDER OF 2H15 AT 20 AUGUST 2015  Protect the Mayoko mining right  BEE Holdco STRATEGIC  Maintain Tronox investment  Mayoko Iron Ore Project CONSIDERATIONS  Consult and develop BEE options  Tronox  Continue zero fatality/0,15

  36. Slide 36: Thank you

    Slide 36: Thank you

    THANK YOU

  37. Slide 37: Additional information

    Slide 37: Additional information

    ADDITIONAL INFORMATION

  38. Slide 38: Key events

    Slide 38: Key events

    Key events 2015 2014 • NCC assets disposal agreement signed January • Mayoko mining convention signed April • Tronox acquisition of Alkali Chemicals • Tronox standstill period expired 15 June 2015 • Exxaro’s offer to acquire TCSA announced June • Dilution of Tronox shareholding to 43,84% • Mayoko im

  39. Slide 39: Group cash flow

    Slide 39: Group cash flow

    Group cash flow % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Cash generated from operations 2 330 2 528 (8) 1 555 50 Net financing cost (207) (112) (85) (136) (53) – Interest paid (230) (137) (68) (170) (35) – Interest received 23 25 (8) 34 (32) Tax paid (74) (89) 17 (31) (13

  40. Slide 40: Capital expenditure: other

    Slide 40: Capital expenditure: other

    Capital expenditure: other Actual Estimate* R million 1H14 2H14 1H15 2H15 FY16 FY17 Sustaining 69 59 36 110 53 105 – Ferrous 3 34 – Information management 35 29 36 76 49 105 – Research and development 8 3 4 – Buildings, vehicles and equipment 26 24 Expansion 464 32 9 – Mayoko 456 – Ferrous 8 31 9 –

  41. Slide 41: Group depreciation and amortisation: core

    Slide 41: Group depreciation and amortisation: core

    Group depreciation and amortisation: core % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Carbon 379 430 (12) 347 9 – Tied operations 12 22 (45) 21 (43) – Commercial operations 367 408 (10) 326 13 Ferrous 2 3 (33) 13 (85) – Mayoko 8 – FerroAlloys 2 2 2 – Other 1 3 Other 30 48 (3

  42. Slide 42: Group EBITDA: core

    Slide 42: Group EBITDA: core

    Group EBITDA: core % change % change 1H15 vs 1H15 vs R million 1H15 2H14 2H14 1H14 1H14 Carbon 2 054 1 898 8 2 198 (7) – Tied operations 114 133 (14) 229 (50) – Commercial operations 1 940 1 765 10 1 969 (1) Ferrous (119) (307) 61 (98) (21) – Mayoko (40) (286) 86 (14) – FerroAlloys 5 5 (96) – Other

  43. Slide 43: Group net operating profit: core (1H14 vs 1H15)

    Slide 43: Group net operating profit: core (1H14 vs 1H15)

    Group net operating profit: core (1H14 vs 1H15) R million 344 (888) (650) (112) 163 765 1 811 5 854 1 774 369 46 1 442 (4 080) IFRS Non-core Core Core Non-core IFRS Inflation Exchange Price GMEP Volume Cost Rehab 1H14 items 1H14 1H15 items 1H15 Carbon 1 836 13 1 849 (88) 209 341 (888) 763 (562) 51 1

  44. Slide 44: Carbon sensitivities

    Slide 44: Carbon sensitivities

    Carbon sensitivities Measure Sensitivity Impact on NOP (Rm) Environmental rehabilitation 1% (154) 154 discount rate Sales volumes 1% (47) 47 Price per tonne US$1 (24) 24 Labour cost 1% (11) 11 Railage 1% (6) 6 Exchange rate 10c (5) 5 Fuel costs 1% (4) 4 Electricity costs 1% (2) 2 0 44

  45. Slide 45: TCSA acquisition price

    Slide 45: TCSA acquisition price

    TCSA acquisition price API4 coal price range Net present (US$/tonne) value of the Deferred Expected coal Fair value fair value payments price Discount adjustment adjustment Reference year Minimum Maximum (US$m) (US$/tonne)* factor of 8% (US$m) (US$m) 2015 60 80 10 59,69 1,00 2016 60 80 25 56,60 0,93

  46. Slide 46: TiO2 and Alkali Chemicals investment: US GAAP reconciliation to IFRS

    Slide 46: TiO2 and Alkali Chemicals investment: US GAAP reconciliation to IFRS

    TiO2 and Alkali Chemicals investment: US GAAP* reconciliation to IFRS 1H15 1H14 2H14 US$m Rm US$m Rm US$m Rm US GAAP loss after tax as reported by Tronox (164) (52) (365) IFRS adjustments 32 (16) 315 – Reversal of amortisation on intangible asset 11 11 12 – PPA step-up adjustments (57) (9) (40) – Tr

  47. Slide 47: Thermal coal: production and sales volumes

    Slide 47: Thermal coal: production and sales volumes

    Thermal coal: production and sales volumes '000 tonnes 1H15 1H14 1H13 FY14 FY13 Production 18 097 17 561 17 704 36 875 36 553 – Grootegeluk 10 144 7 270 7 544 16 719 15 904 – Matla 3 435 5 189 4 805 10 374 10 133 – Leeuwpan 1 844 2 191 1 744 4 107 3 804 – NBC 1 393 1 227 1 505 2 602 2 668 – Arnot 74

  48. Slide 48: Metallurgical coal: production volumes and sales

    Slide 48: Metallurgical coal: production volumes and sales

    Metallurgical coal: production volumes and sales '000 tonnes 1H15 1H14 1H13 FY14 FY13 Production 923 1 238 1 095 2 274 2 251 – Grootegeluk 923 1 130 916 2 120 1 908 – Tshikondeni 108 179 154 343 Sales 843 1 348 1 142 2 470 2 215 – Domestic 697 850 866 1 689 1 643 – Export 146 498 276 781 572 48

  49. Slide 49: Salient dates

    Slide 49: Salient dates

    Salient dates Last day to trade cum dividend Friday, 4 September 2015 Shares trade ex-dividend Monday, 7 September2015 Record date Friday, 11 September 2015 Payment date Monday, 14 September 2015 49

  50. Slide 50: Definitions

    Slide 50: Definitions

    Definitions Average spot rate (slide 18) Non-core (slides 19, 29, 33, 38, 43 and 46) The average spot rate is determined by using the Items not part of normal operating activities of either group or equity- closing spot rate at the end of each day during the period of accounted investments of group

  51. Slide 51: Index

    Slide 51: Index

    Index Topic Slide number Topic Slide number Carbon Group Capital expenditure 24 Attributable earnings 30 Contribution 23 Cash flow 39 Core 22 Capital expenditure other 40 Exports 13 Capital funding structure 31 Outlook 14 Depreciation and amortisation 41 Sales volumes 12, 47, 48 Dividend 33 Portfoli