  1. Slide 1: Exploring Gold in Africa

    Slide 1: Exploring Gold in Africa

    EXPLORING GOLD IN AFRICA TSX-V : SPX | OTC : STLXF CORPORATE PRESENTATION JANUARY 2022

  2. Slide 2: Legal Disclaimer

    Slide 2: Legal Disclaimer

    LEGAL DISCLAIMER All information included in this presentation, including any information as to the Stellar AfricaGold Inc.’s (the ‘Corporation’) future performance, and other statements that express management’s expectations or estimates of future exploration success, other than statements of histo

  3. Slide 3: Stellar AfricaGold at a Glance

    Slide 3: Stellar AfricaGold at a Glance

    STELLAR AFRICAGOLD AT A GLANCE With a history of delivering gold discoveries, the board members and management team are focusing on the exploration of the Tichka Est Gold Project in Morocco and expanding activities in Mali and Côte d’Ivoire. In Q1 2022, Stellar is expecting new exploration results a

  4. Slide 4: Board of Directors and Management

    Slide 4: Board of Directors and Management

    BOARD OF DIRECTORS AND MANAGEMENT John Cumming J Francois Lalonde Maurice Giroux B.A., L.L.B., L.L.M. ENG. B.SC CIVIL ENGINEERING B.SC. GEOLOGY EXECUTIVE CHAIRMAN PRESIDENT & CEO VICE PRESIDENT & COO Mr. Cumming, a corporate finance lawyer and businessman, An engineer by profession, Mr. Lalonde has

  5. Slide 5: Activities: Company Acquisitions

    Slide 5: Activities: Company Acquisitions

    ACTIVITIES COMPANY ACQUISITIONS Following completion of the sale of Balandougou assets in Guinea in October 2019, Stellar AfricaGold assembled an impressive exploration land position in Morocco and Mali: • Earn-in with Office Nationale des Hydrocarbures et des Mines (ONHYM) to acquire 90% Interest i

  6. Slide 6: Morocco: Tichka Est Gold Project

    Slide 6: Morocco: Tichka Est Gold Project

    MOROCCO TICHKA EST GOLD PROJECT Stellar signed an Exploration Earn-in Agreement to explore and develop the gold and multi- elements potential of the Tichka Est Project in the Occidental High Atlas area in Morocco and acquire 90% interest in the project. 6

  7. Slide 7: Tichka Est Due Diligence Results

    Slide 7: Tichka Est Due Diligence Results

    TICHKA EST DUE DILLIGENCE RESULTS • Six (6) anomalous gold zones were outlined by ONHYM stream sediments programs and confirmed by Stellar due diligence sampling, Zones A and B warrant priority attention. • Zone A gold prospect was outlined by a cluster of 85 anomalous gold-in-stream sediment sample

  8. Slide 8: Tichka Est Work Program

    Slide 8: Tichka Est Work Program

    TICHKA EST WORK PROGRAM • The Independent Technical Report* completed in Q4 2020 recommends a 3-phase exploration program totaling US$ 2,080,725. Q3 2021 Q1 2022 Q1 2021 Trenching campaign II, Stream program Trenching Regional exploration and and Trenching on campaign I Road authorization new struct

  9. Slide 9: Tichka Est Main Structures

    Slide 9: Tichka Est Main Structures

    TICHKA EST Illustration of gold mineralization in Quartz and Ankerite structures MAIN STRUCTURES • ZONE A • Zone A is a N350° trending structure where the gold- mineralized structure extends to over 450 meters along strike. • The mineralisation is in a shear zone at the contact of a dolerite dyke an

  10. Slide 10: Trenching Campaign I

    Slide 10: Trenching Campaign I

    TICHKA EST TRENCHING CAMPAIGN I • In Q1 2021, Stellar launched a 10-trench surface sampling program on both Structures A and B, mainly to confirm the continuity of the outcropping mineralization at shallow depth. • The trenching program, which totaled 175 linear meters, outlined much wider gold mine

  11. Slide 11: Trenching Campaign II

    Slide 11: Trenching Campaign II

    TICHKA EST TRENCHING CAMPAIGN II • In Q3 2021, Stellar launched a follow-up 10-trench surface sampling program on both Structures A and B, mainly to : • confirm the continuity of mineralization, • improve the geological understanding. • The trenching program, which totalled 200 linear metres, yielde

  12. Slide 12: Zone A Selected Trenches

    Slide 12: Zone A Selected Trenches

    TICHKA EST ZONE A SELECTED TRENCHES • Trench 2A: 3.36 g/t Au over 10 meters • including 8.73 g/t over 3.0 meters • Trench 3A: 1.18 g/t Au over 6 meters • including 5.92 g/t Au over 1.0 meter • Trench 4A: 1.80 g/t Au over 4 meters • including 4.20 g/t Au over 1.0 meter • Trench 5A: 1.85 g/t Au over 8

  13. Slide 13: Zone B Selected Trenches

    Slide 13: Zone B Selected Trenches

    TICHKA EST ZONE B SELECTED TRENCHES • Trench 1B: 2.08 g/t Au over 10 meters • including 3.20 g/t Au over 3.0 meters • including 5.54 g/t Au over 1.0 meter • Trench 2B: 4.55 g/t Au over 15 meters • including 7.47 g/t Au over 6.0 meters • Trench 6B: 3.4 g/t Au over 17 meters • including 9.55 g/t Au ov

  14. Slide 14: Regional Exploration

    Slide 14: Regional Exploration

    TICHKA EST REGIONAL EXPLORATION • Acquisition of four (4) new permits and initiation of a regional scale exploration and sampling program. • Expected exploration results in Q1 2022 : • Stream sediments sampling program focussing initially on the creek and river networks of permits #3738988 and #3738

  15. Slide 15: Road Construction

    Slide 15: Road Construction

    TICHKA EST ROAD CONSTRUCTION • Although the Tichka Est permits are accessible via existing roads, the drilling campaign will require the cutting up to 9 km of mountainside switch-back road to provide access to the Zone A and B prospects priority sites and the leveling of drill pads at both locations

  16. Slide 16: Tichka Est Site Photos

    Slide 16: Tichka Est Site Photos

    TICHKA EST SITE PHOTOS TSX.V : SPX | OTC : STLXF 16

  17. Slide 17: Mali: Namarana Gold Project

    Slide 17: Mali: Namarana Gold Project

    MALI NAMARANA GOLD PROJECT Stellar, through its 100% subsidiary Stellar Pacific Mali SARL, has secured a 52 km2 gold exploration permit in southwest Mali. The Namarana Permit is located near the village of Namarana, Circle of Kangaba, region of Koulikoro, near the border with Guinea approximately 10

  18. Slide 18: Namarana Prior Exploration

    Slide 18: Namarana Prior Exploration

    NAMARANA GOLD PROJECT PRIOR EXPLORATION • In 2012 Newmont Mining, in association with Stellar, conducted a field reconnaissance and an airborne magnetic survey on Namarana permit. • During the 2012 geophysical survey Newmont Extract from geological map reported 4 significant grab sample assay result

  19. Slide 19: Namarana 2021 Reconnaissance Program

    Slide 19: Namarana 2021 Reconnaissance Program

    NAMARANA GOLD PROJECT 2021 RECONNAISSANCE PROGRAM • Twenty-five (25) samples returned gold grades greater than 0.30 g/t and 13 returned grades ranging between 1.0 g/t and 5.7 g/t Au primarily in some quartz veins running roughly north south. The samples were taken from either surface exposures or fr

  20. Slide 20: Namarana Work Program

    Slide 20: Namarana Work Program

    NAMARANA GOLD PROJECT WORK PROGRAM • The Independent Technical Report* completed in Q4 2020 recommends a 3-phase exploration program totaling US$ 2,080,725. Q3 2021 Q1 2022 Exploration Completion of environmental authorization and impact assessment and reconnaissance preparation of a trenching and/o

  21. Slide 21: Namarana Site Photos

    Slide 21: Namarana Site Photos

    NAMARANA SITE PHOTOS TSX.V : SPX | OTC : STLXF 21

  22. Slide 22: Thank You

    Slide 22: Thank You

    THANK YOU CUMMING@STELLARAFRICAGOLD.COM LALONDEJF@STELLARAFRICAGOLD.COM HTTP://WWW.STELLARAFRICAGOLD.COM/ The technical content of this presentation has been reviewed and approved by Yassine Belkabir, MScDIC, CEng, MIMMM, a Stellar director and a Qualified Person as defined in NI 43-101. Auditor: Sm