Waratah Minerals Limited · ASX:WTM

Waratah Minerals — Battery Minerals — Benchmark World Tour, Sydney 2018

18 slides from Waratah Minerals's conference presentation, Sep 21, 2018

  1. Slide 1: Mozambique – Real Opportunity

    Mozambique – Real Opportunity Benchmark World Tour Sydney 21st September 1

  2. Slide 2: Project 1 Montepuez

    Project 1 Montepuez Montepuez Graphite Project 2 VES (First Module) Annual graphite production 45,000 – 50,000pa Capex (pre-production) US$51.2 M Opex (concentrate/t)7 US$378/t Grade processed 12% TGC Plant Type and Scale Modular, ~500ktpa Projected Payback ~2 years5 Net Operating Cash Flow ~US$20 M

  3. Slide 3: Permanent Camp Construction - on track

    Permanent Camp Construction - on track 3

  4. Slide 4: Plant Site Earthworks – on track

    Plant Site Earthworks – on track 4

  5. Slide 5: May 2018 Satellite Image

    May 2018 Satellite Image Elephant Deposit Buffalo Deposit Plant Site Camp Warthog Prospect Tailings dam Haul Road 5

  6. Slide 6: Project 2 Balama

    Project 2 Balama Balama Graphite Project 2 Scoping Study Annual graphite production 50,000 – 55,000pa Capex (pre-production) US$50 M Opex (concentrate/t)6 US$372/t Grade Processed 10.6% TGC Plant Type and Scale Modular, ~550ktpa Projected Payback <1.5 years5 Net Operating Cash Flow >US$30 Mpa5 Metal

  7. Slide 7: Production Profile – Significant opportunity

    Production Profile – Significant opportunity 7

  8. Slide 8: Graphite Demand – Large growing market

    Graphite Demand – Large growing market 8

  9. Slide 9: Current Projects

    Current Projects Project Description Status Montepuez Graphite Produce 50,000tpa @ >96% TGC • DFS, VES, Detailed eng. , Camp, Roads and plant site CPL Oct 2018 Project stage 1 OPEX cost FOB Moz USD $372/t • Tailings Dam wall and earthworks will be complete by December 2018, 50,000tpa, planning CAPEX

  10. Slide 10: Next Steps

    Next Steps 1. Complete Montepuez project finance 2. Award remaining construction contracts 3. Urbix, Anode and other downstream test work 4. Resource and reserves, exploration update 5. Balama Feasibility Study Results 6. Start mining processing and exporting 7. Vanadium and other minerals explorati

  11. Slide 11: APPENDICES

    APPENDICES • BMI-Graphite Price Trend Jan 2016 to July 2018 - Montepuez • BMI-Graphite Price Trend Jan 2016 to July 2018 - Balama Central • CRU-Historical Vanadium Pricing • Mineral Resources, Reserves, disclaimer, Competent person statements 11

  12. Slide 12: BMI – Montepuez Basket Price Jan16 - June18

    BMI – Montepuez Basket Price Jan16 - June18 Graphite commodity prices have steadily improved since March/April 2017 Montepuez: Battery Minerals - Flake Graphite Concentrate Sizing Flake size Flake size % of Flake size TGC grade (mesh) (micron) concentrate Fine -100 Mesh 0 - 150 71.9% 97.0% Medium +1

  13. Slide 13: BMI - Balama Basket Price Jan16 to June18

    BMI - Balama Basket Price Jan16 to June18 Balama Central Graphite Project ▪ Higher Jumbo and Large flake product ▪ Higher basket price of circa US$1,220/t Balama Central Battery Minerals - Flake Graphite Concentrate Sizing Flake size Flake size % of Flake size TGC grade (mesh) (micron) concentrate F

  14. Slide 14: Montepuez Ore Reserves and Mineral Resources

    Montepuez Ore Reserves and Mineral Resources • Ore Reserve Estimate January 2017 for Buffalo and Elephant deposits is 41.4Mt @ 8.80% TGC for 3.64Mt of graphite reported at a cut-off grade of 4% TGC • Total Mineral Resource July 2018 and January 2017 for Elephant and Buffalo deposits is 115.6Mt @ 7.5

  15. Slide 15: Montepuez Mineral Resource Statement

    Montepuez Mineral Resource Statement Total Mineral Resource July 2018 and January 2017 for Elephant and Buffalo Elephant deposits is 115.6Mt @ 7.51% TGC for 8.62Mt of graphite reported at a 2.5% TGC cut-off ELEPHANT RESOURCE @ 2.5% TGC cut-off – July 2018 Contained Tonnes TGC Classification Type Gra

  16. Slide 16: Balama Central Mineral Resource

    Balama Central Mineral Resource (1) Total Mineral Resource for Balama Central is 32.9 million tonnes at 10.2 per cent TGC for 3.36Mt of graphite reported at a 6.0% TGC cut-off and includes Indicated Resources of 26Mt @ 10.3% TGC for 2,733Kt of graphite reported at a 6.0% TGC cut-off BALAMA CENTRAL G

  17. Slide 17: Vanadium pricing last 20 years - CRU

    Vanadium pricing last 20 years - CRU 17

  18. Slide 18: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Forward Looking Statements published data for which Competent Persons consents were periodic and continuous disclosure announcements lodged with obtained. Their consents remain in place for subsequent releases the ASX, which are available on the Battery Miner

Battery Minerals — Benchmark World Tour, Sydney 2018 on 6ix