For personal use only Queensland Exploration Council Brisbane, 25th February 2014 Colm Cloonan, Chief Financial Officer
Slide 2: Disclaimer
Disclaimer For personal use only This document has been prepared by Tlou Energy Limited (“Company”) to provide an update on the Company and its operations. Extent of Information This presentation, including the information contained in this disclaimer, does not constitute an offer, invitation or rec
Slide 3: Tlou Energy - Overview
Tlou Energy Limited For personal use only Tlou Energy - Overview Project Team & Locations Botswana Lesedi CBM Project Resource Statement Commercialisation Forward plan 3
Slide 4: Group Overview
Group Overview For personal use only CBM developer focussed on Botswana ASX Listed: TOU Market Cap ~$47m Shares on Issue ~148m Cash Balance ~$13.5m (Dec 2013) Current project fully funded Operations in Botswana Certified Contingent resources (NSAI) Experienced team, 30+ staff Bri
Slide 5: Team & Locations
Team & Locations Experienced Team with Established on the Ground Presence For personal use only Brisbane Office Johannesburg & Gaborone Offices Corporate Head Office Johannesburg - Administrative office Experienced management team Gaborone - In-country office Maintains key relationships wi
Slide 6: Botswana Field Camp
Botswana Field Camp For personal use only Main Operations Camp Purpose built 20-30 personnel onsite Permanent & temporary accommodation Full time security and medical support Fully equipped with critical machinery and spares Significant operational equipment & vehicles ~30 minutes to L
Slide 7: Botswana: Favourable Environment for Resource Investment
Botswana Favourable Environment for Resource Investment For personal use only Growing economy Corruption Perceptions Index Stable, democratic government Low cost environment Local stakeholders supportive of Score Tlou’s activities given desire to: Very 9.0–10.0 ― Reduce foreign electricity C
Slide 8: Operations
Operations For personal use only Botswana Activities ~7,000km2 of granted CBM Applications pending for a 70+ wells drilled which has permits in the Karoo further ~4,400km2 in the provided a large database of Kalahari Basin adjacent ‘Mamba’ area the area Successfully completed Production te
Slide 9: Lesedi CBM Project
Lesedi CBM Project Current focus area For personal use only Five prospecting licences Located in the Karoo Kalahari Basin Two Horizontal Pilot Pods: ― Lesedi ― Selemo Pilot well design similar to successful methods used in Qld basins Testing underway, gas flows imminent Three well infill
Slide 10: Horizontal Well Design
Horizontal Well Design Horizontal Pilot Pods For personal use only Horizontal wells (~750 m in-seam) with vertical intercept pumping well Lesedi completed with dual laterals Selemo completed as a single lateral Target Reservoir: Basal Morupule coal seam (~6 m) Results will underpin reserve
Slide 11: Geological Prospectivity
Geological Prospectivity Coal Seams Display Attractive Features For personal use only Reservoir Distribution Wells intersect coals at depths of ~300-700m Cumulative net coal thickness averaging ~25m Coal seams laterally continuous Reservoir Properties Gas contents ~4m3/t Drill stem tests (
Slide 12: Certified Contingent Resources (NSAI)
Certified Contingent Resources (NSAI) First CBM Operator in Botswana to achieve a Reserve Certification For personal use only NSAI Contingent Resource objective mid-2014 152 BCF (2C) & 2,322 BCF (3C) contingent Lesedi project horizontal pilot pods dewatering resources Gas flows imminent once c
Slide 13: Commercialisation
Commercialisation Numerous Local and Regional Opportunities For personal use only Local Botswana Opportunities Existing 10 PJ pa off-take opportunity in Botswana Gas replacement for diesel power Initial field production – CNG: To Kodibeleng (~80km), nearest sub-station Pipeline to Orapa (~
Slide 14: Botswana Electricity Supply / Demand
Botswana Electricity Supply / Demand Estimate (MW) 1,200 For personal use only Demand far outweighs supply Peak demand ~600MW (2013 est.) 900 Supply Current local supply < 400MW commissioning (2013 est.) issues Daily power outages 600 SA (Eskom) imports 100MW Non-firm, expire 2015 Morupu
Slide 15: 2014/15: Focus on Reserves and Field Development
2014/15: Focus on Reserves and Field Development Targeting Initial 2P Reserves by mid-2014 For personal use only Demonstrate Conduct commercial Secure MOU Conduct expanded gas flows at for gas infill coring pilot Lesedi & supply program program Selemo Pilot Pods Complete dewatering Work commence
Slide 16: Botswana CBM Landscape
Botswana CBM Landscape Competitive Landscape For personal use only Tlou (and predecessors) have had continuous Botswana operations since 2007 Being in-country with advanced data allows Tlou to rapidly move towards commercialisation Other oil & gas companies active in the region include: Orig
Slide 17: Summary
Summary Africa’s Most Advanced For personal use only Lesedi CBM Project CBM Company The most advanced unconventional gas project in Botswana – 100% owned Certified Contingent Resources 152 BCF (2C), 2,322 BCF (3C) over US$50 million expenditure to date Significant market opportunity Strong demand Ga