Slide 1: Coyote Copper Mines Inc.
Coyote Copper Mines Inc. The Heart of Arizona, USA’s Copper Triangle Trading on the TSX-V – Symbol “CCMM” Q2 - 2026
Slide 2: Historical Resource & Disclaimer
Historical Resource & Disclaimer This document may contain “forward-looking information” within the meaning of Canadian securities legislation and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking sta
Slide 3: Introducing Arizona's "Copper Triangle"
Introducing Arizona’s “Copper Triangle” • Arizona’s Copper Triangle is only 60 miles from the Phoenix Airport • The region has produced 37 billion lbs of copper to date and holds 95 billion lbs of known copper reserves and resources • Direct neighbor of some of the world’s largest copper producers (
Slide 4: Other Arizona Copper Deposits
Other Arizona Copper Deposits Coyote Copper Historical Resources Arizona Sonoran 10 Billion Lbs Copper Grade 0.5% Mkt Cap $1.2 billion Taseko Mines (Florence) 2.8 Billion Lbs Copper Faraday Copper Grade 0.35% 4 Billion lbs Copper Mkt Cap $3.89 Billion Grade 0.4% Mkt Cap $778 million Ivanhoe Electric
Slide 5: Arizona's Copper Triangle
Arizona’s Copper Triangle Pinto Valley Mine Miami/Inspiration Mine Mining Grade 0.29% 498M tonnes @ 0.4% Smelter Mkt. Cap. $11.7 billion Miami East Grade 0.39% Carlota Van Dyke Mine 5M tonnes @ 183M tonnes @ 0.3% 0.5% Cu Cu Ocelot 2023 Discovery Resolution Mine Est. 1.9Bn tonnes @ 1.5% COPPER SPRING
Slide 6: The Copper Triangle – Globe/Miami Area
The Copper Triangle – Globe/Miami Area Van Dyke Mine Pinto Valley Mine 183M tonnes @ Miami/Inspiration Mine Mining Grade 0.29% 0.3% Cu 498M tonnes @ 0.4% Old Dominion Miami East Solitude Tailings Carlota Ocelot 2023 5M tonnes @ 0.4% Cu Discovery Superior East SOUTH 32 Extension of the Copper Springs
Slide 7: Resolution Mine – 55% Rio Tinto 45% BHP
Resolution Mine – 55% Rio Tinto 45% BHP On March 16, 2026, Resolution Copper, a joint venture owned by Rio Tinto and BHP that represents one of the world’s most significant copper deposits, completed a Federal land exchange required to unlock the full potential of the project. Capstone and Globe/Mia
Slide 8: Copper Springs – Geological Copper Trends
Copper Springs – Geological Copper Trends • District is comprised of three rotated and dismembered porphyry centers, two of which have operating mines on them • The third, the Copper Springs System, runs right through the Copper Springs property • On April 21, 2023 BHP announced their new discovery
Slide 9: Copper Springs – Land Package & Geology
Copper Springs – Land Package & Geology Geological Highlights • Extremely compelling geologic and geographic setting • Located in the center of the prolific Superior- Globe-Miami district • Project covers several kilometers of the margin of the Schultz Granite body, in an analogous setting to nearby
Slide 10: Copper Springs – Claims Package
Copper Springs – Claims Package • Coyote Copper Mines Inc. through its 100% owned subsidiary CBMI USA Inc. has staked additional claims in and around the original 126 claim block (~1,000 hectares or ~2,500 acres) BHP – Pinto Valley Mine Freeport McMoran Copper and Gold- Miami Complex • Currently, an
Slide 11: Option Terms
Option Terms Copper Springs Option Payments • All 2026 Option payments were Paid Cash Year - US$ Payments Expenditures Totals • Next Option payment due June 2027. 2027 $195,000 $250,000 $445,000 2028 $200,000 $300,000 $500,000 • Coyote Copper has 693 BLM (Bureau of Land Management) Claims 2029 $1,00
Slide 12: Company Structure
Company Structure Share Structure Shares C$ Price CCMM Total Common Shares 96,368,674 $0.14 The last financing was Warrants – 36 month – Acceleration 7,519,038 $0.15 at C$0.14 or U$0.10. Clause* Approximately 21 Warrants – 36 month – Acceleration Clause* 10,859,990 $0.20 million shares. CPC/ Shell /
Slide 13: Coyote Copper – "CCMM" - Valuation
Coyote Copper – “CCMM” - Valuation CCMM Current Valuation Potential Valuation U$ U$ U$ C$ U$ C$0.14 (U$0.10) Resource Valuation** U$ U$0.03 /lb U$0.05 /lb U$0.11 /lb Total $13,700,000 $10,000,000 Current Resource 400 million lbs** $12 million $20 million $44 million Resource “Goal 1” 1 billion lbs**
Slide 14: Comparable Companies – As of Feb. 9, 2026
Comparable Companies – As of Feb. 9, 2026 14 CoyoteCopper.com
Slide 15: Management Team
Management Team Daniel has worked for over 20 years at some of the top financial firms in Canada. He worked as an Institutional Daniel Weir Equity Trader, Sales and Investment banking as well as a broker. He was the Head of Institutional Equity Sales at a boutique firm focused on financing Mining co
Slide 16: Independent Directors
Independent Directors Mr. Irwin has spent over 20 years working at multiple Big4 accounting firms. He is currently a trusted business Darryl Irwin advisor to many Canadian-based companies. Darryl has provided business and tax advice on strategies to Director minimize income tax, structuring of acqui
Slide 17: Advisors
Advisors Herb has over 30 years of experience in mineral exploration geology within the United States, Latin America and Europe. He has been involved in the exploration and drilling of mines, acquisition of metal resources, and Herb Duerr worked with major mining companies on the examination of over
Slide 18: Appendix – Exploration Plan
Appendix – Exploration Plan 1. Permitting 37 drill locations 2. Hyperspectral – Satellite Survey 3. Drone – Mag Survey 4. MT and 3D IP – Geophysics Survey 5. Soil Sample Survey 6. Mapping and Channel Sampling 18
Slide 19: Permitting – Drill Locations
Permitting – 37 Drill Locations 19 CoyoteCopper.com
Slide 20: Geophysics – MT and 3D IP – Data Pending
Geophysics – MT and 3D IP – Data Pending 20 CoyoteCopper.com
Slide 21: Geophysics – MT and 3D IP – Data Pending
Geophysics – MT and 3D IP – Data Pending 21 CoyoteCopper.com
Slide 22: Geophysics Program – Old 2D Reprocessed
Geophysics Program – Old 2D Reprocessed 22 CoyoteCopper.com
Slide 23: Geophysics Program – Old 2D Reprocessed
Geophysics Program – Old 2D Reprocessed 23 CoyoteCopper.com
Slide 24: Geophysics Program – Old 2D Reprocessed
Geophysics Program – Old 2D Reprocessed 24 CoyoteCopper.com
Slide 25: Soil Sampling Program – Assays Pending
Soil Sampling Program – Assays Pending 25 CoyoteCopper.com
Slide 26: Samples from Drill Core - Relogged
Samples from Drill Core - Relogged 26 CoyoteCopper.com
Slide 27: Samples from Copper Springs and Gibson
Samples from Copper Springs and Gibson From the Copper Springs Project around From Gibson around planned drill hole CS3 planned drill hole CS15 27 CoyoteCopper.com
Slide 28: Adjacent to Planned Drill Hole CS15
Adjacent to Planned Drill Hole CS15 Entrance to 300 foot adit 28 CoyoteCopper.com
Slide 29: Birthday Zone (east side of Project)
Birthday Zone (east side of Project) Copper leaching out of the side of the hill. This picture is about 100m 29 east of planned drill hole CS18 CoyoteCopper.com
Slide 30: Breccia Pipe – Middle of land package
Breccia Pipe – Middle of land package (west side of Copper Springs) Brecia Pipes on the Project potential drill hole CS36 30 CoyoteCopper.com
Slide 31: Channel Sampling – Assays Pending
Channel Sampling – Assays Pending 31 CoyoteCopper.com
Slide 32: Copper Molybdenum
Happy Geos – Channel Sampling – Assays Pending Copper Molybdenum 32 CoyoteCopper.com
Slide 33: For more information, please contact
For more information, please contact: Daniel Weir, CEO, Founder, Director Cell: +1 (416) 720-0754 Email: DanWeir@CoyoteCopper.com 33 CoyoteCopper.com