Diamond Power Infrastructure Limited · NSE:DIACABS

Diamond Power Infrastructure — Investor Presentation (March 2026)

43 slides from Diamond Power Infrastructure's investor presentation, Mar 7, 2026

  1. Slide 1: Investor's Presentation cover letter

    DICABS DIAMOND POWER INFRASTRUCTURE LIMITED March 7, 2026 Corporate Relations Department Listing Department BSE Limited National Stock Exchange of India Limited 2nd Floor, P.J. Towers Exchange Plaza, Plot No. C/1, G- Block, Dalal Street, Bandra Kurla Complex, Bandra (E), Mumbai – 400 001 Mumbai – 40

  2. Slide 2: Powering Progress

    Ret aes POWERING PROGRESS

  3. Slide 3: Building a Legacy of Quality, Innovation and Leadership

    CBS CBS POWERING PROGRESS BUILDING A LEGACY OF QUALITY INNOVATION AND LEADERSHIP IN POWER TRANSMISSION

  4. Slide 4: Financial Statement Q3

    Financial Statement Q3 Diamond Power Infrastructure Limited | Q3 FY 2025-26 | Investor Presentation 3

  5. Slide 5: Key Highlights

    KEY HIGHLIGHTS DICABS pOWEING PROGRESS Revenue Gross Margin Q3 FY26 9M FY26 Q3 FY26 9M FY26 ₹ 47,408 Lakhs ₹ 1,21,424 Lakhs ₹ 11,025 Lakhs ₹ 25,066 Lakhs 54% YoY 55% YoY 150% YoY 96% YoY 8% QoQ 35% QoQ EBDITA PAT Q3 FY26 9M FY26 Q3 FY26 9M FY26 ₹ 6,976 Lakhs ₹ 14,690 Lakhs ₹ 4,972 Lakhs ₹ 9,755 Lakh

  6. Slide 6: Sales Performance FY 2025-26

    SALES PERFORMANCE FY 2025-26 INR in Lacs DICABS pOWEING PROGRESS Revenue Gross Margin EBITDA 14.7% 23.3% 47,408 6,976 43,833 18.7% 11,025 10.5% 30,742 8,194 4,602 14.3% 4,407 5.2% 1,603 Q3FY25 Q2FY26 Q3FY26 Q3FY25 Q2FY26 Q3FY26 Q3FY25 Q2FY26 Q3FY26 PAT 10.5% 4,972 ✓ EBITDA rose 52% QoQ & 335% YoY. 6

  7. Slide 7: Product Wise Sales FY 2025-26

    PRODUCT WISE SALES FY 2025-26 INR in Lacs DICABS pOWEING PROGRESS Q3FY25 Sales 1,051 , Q3FY26 Sales 4% 8,886 , 29% 20,399 , 67% 10,717 23% ■ LT Cable ■ HT Cable ■ Conductors 16,514 36% Q2FY26 Sales 18,798 41% 9,513 , 22% 18,026 , 41% 16,190 , 37% ■ LT Cable ■ HT Cable ■ Conductors ■ LT Cable ■ HT Ca

  8. Slide 8: Profit and Loss Statement

    Profit and Loss Statement INR in Lacs DICABS pOWEING PROGRESS Quarter Ended Nine Months Ended Year Ended Particular Q3FY26 % Q2FY26 % Q3FY25 % 9MFY26 % 9MFY25 % FY25 % Revenue from Operations 47,408 100.0% 43,833 100.0% 30,742 100.0% 1,21,424 100.0% 78,158 100.0% 1,11,539 100.0% Cost of Goods Sold (

  9. Slide 9: Key Profit Drivers This Quarter

    KEY PROFIT DRIVERS THIS QUARTER DICABS pOWEING PROGRESS COMMERCIAL MOMENTUM MARGIN MANAGEMENT OPERATIONAL EXCELLENCE 100% Growth in Retail Sales (Qo0) Risk Mitigation & Strategic Internal Optimization Sourcing • Enforced Price Variation Clauses Executed a rigorous Cost driven purely by the metal ind

  10. Slide 10: Pillars of Financial Assurance: Auditors

    Pillars of Financial Assurance: Auditors Statutory Naresh and Co. Auditor Internal Ernst and Young LLP Auditor Cost Auditor Dalwadi & Associates Secretarial Ashish Shah & Associates Auditor Diamond Power Infrastructure Limited | Q3 FY 2025-26 | Investor Presentation 9

  11. Slide 11: Empowering the Future

    EMPOWERING THE FUTURE DICABS pOWEING PROGRESS Age Dynamic Management Team Experience Dynamics 18% 21% 41% 39% 16% 27% 25% 13% ■ Less than 30 years ■ 30-40 years ■ 40-50 years ■ More than 50 years ■ Less than 5 years ■ 05-10 years ■ 10-20 years ■ More than 20 years Diamond Power Infrastructure Limite

  12. Slide 12: Manufacturing Capabilities

    MANUFACTURING I CAPABILITIES ', t ' 4 + rf 11

  13. Slide 13: Creating Global Capacities

    DIC/BS Creating global Capacities Annual Capacity Per kms Max Capacity CABLE TYPE in CKM Additional Total in Mn Value in Mn 1.1KV Cables 34,300 0 34,300 0.3 10290 1.9/3.3KV Cables 6000 0 6,000 0.75 4500 11KV /22KV Cables 7500 7500 15,000 1 15000 33KV Cables 4500 3000 7,500 1.6 12000 220 KV above 200

  14. Slide 14: Cables

    DIC ABS CABLES DICABS’s cables deliver power that the country counts on. We leverage our CCV method of manufacturing, coupled with German technology, to deliver world-class power transmission products. LOW VOLTAGE CABLES DICABS LV cables are manufactured in the most sophisticated and modern plant fo

  15. Slide 15: Product Range: Conductors

    DIC/ABS PRODUCT PRODUCTRANGE PRODUCT RANGE RANGE l Conductor manufacturing has been DICABS’ core competency since the inception of the ▪ ▪ EC Grade Aluminium Wire Rods Aluminium Alloy Wire Rods cowcocrons cowcoc ons CONDUCTORS conductor’s business in 1970. Today, we have an installed capacity of ove

  16. Slide 16: Testing Lab Facilities

    DIC ABS TESTING LAB FACILITIES India’s First 700 KV/28000 KVA UHV Type Test Lab for testing up to 500 KV EHV Cable. [ NEW TEST LABS BEING PLANNED 250 KV/2500 KVA High Voltage & PD Test Lab. Conductor In-process Lab -1 100 KV/1200 KVA High Voltage Test Lab Physical Test Lab 70 KV High Voltage Test La

  17. Slide 17: Certifications

    DIC ABS CERTIFICATIONS TUV CERTIFICATE ■ ■ -- -- ■ Quality Management System Certificate Certificate Certificate Quality Management System is certified by TuV ------- ------- 1$0 9001201$ 1$0 9001201$ ...... ..,._.,.,.. ..,._.,.,.. 1$0 4$001201% 4$001201% We are certified by the internationally Nord

  18. Slide 18: NABL and Type Test Certificates

    dicats_official oicab6official www.dicobs.com www.dicobs.com DICABS POWERING PROGRESS DIC/ABS NABL CERTIFICATE DA8¢TK DA8¢TKAl AD Al PY€AL sf AD PY€AL sf t t 40410s04 €ALES 494pt«TO 494pt«TO w4«1e1«.261 w4«1e1«.261 ten le0re fr t46.pee t46.pee let let (lie looter ........ ..4 ..4 DICABS dicats_offic

  19. Slide 19: Vision 2030

    DICABS VISION 2030 REVENUE REVENUE To grow in Higher double digits for next few years to meet the global & Domestic demand. APPROVAL AND CERTIFICATIONS To be approved and recognized by the leading users and industries and Certified by the top Certification agencies for product approval. MARKET SHARE

  20. Slide 20: Capex Upgradation Plan

    2028 Capex 2025 Upgradation Plan Diamond Power Infrastructure Limited | Q3 FY 2025-26 | Investor Presentation 19

  21. Slide 21: Next Two Year Capex

    DIC ABS Next two year Capex Investment in Retail oriented Product mix of LV Cables as per New Building Code @ 3000 kms per month Investment & development of High power centric • High Ampacity Products products like GAP,ECO & Cabon Core Conductors to transmit higher ampacity products • Capacity De-bo

  22. Slide 22: Digital Transformation & Governance

    DIGITAL TRANSFORMATION & GOVERNACE DICABS pOWEING PROGRESS Digital Transformation by Grant & Thornton(GT Bharat) 01 We are executing a Transformative Digital programme in company to become paper less & retailer centric with Support of GT. Implementation of HRMS/CRM/Online pricing 02 Implement HRMS/C

  23. Slide 23: Digital Transformation & Governance

    DIGITAL TRANSFORMATION & GOVERNACE DICABS pOWEING PROGRESS 04 Digital Transformation of inventory management and logistics Tracking of each drum / In-process inventory on or before June 30, 2026. Internal Audit- EY India & Internal Audit teams 05 Our Internal Audit and governance is verified by a Te

  24. Slide 24: Data Centre Products

    Data Centre Products

  25. Slide 25: Cables

    DIC ABS Cables POWERING PROGRESS DICABS HIGH VOLTAGE (Hv) POwENG POwENG OGnEss cables by DICABS POWERING pOGESs a Get the EXTRA EDGE Extra High voltage(EHv) Cables % % % ,, .·" % % % .·" .·" 66 KV AND 132KV CABLES DICABS DICABS owe« owe« owENG noes 0Gt$% 0Gt$% SOLAR CABLES For Uninterrupted Low Volt

  26. Slide 26: Conductors

    Conductors �t ii ·i» {"!# 'if, «7= ACSR Conductor " ii I ,, ... ,�� - ;:;..<: 'i#- HTLS Conductor ---=---· GAP Type Conductor MVCC

  27. Slide 27: ECHO Conductors – Technology & Economic Edge

    ECHO Conductors – Breakthrough Grid Technology with Proven Market Validation TYPE TESTED | 550 KM ORDER SECURED | MARQUEE INDIAN BUYER | IMMEDIATE REVENUE VISIBILITY Technology & Economic Edge Higher Ampacity vs Conventional Conductors Reduced Transmission Losses Superior Thermal Stability Lower Sag

  28. Slide 28: More Capacity. Less Cost.

    More Capacity. Less Cost. Modernizing the world’s power grids to meet the challenges of the 21st century and deliver affordable, reliable, and clean electricity. CONFIDENTIAL & PROPRIETARY. COPYRIGHT© BY TS CONDUCTOR. ALL RIGHTS RESERVED

  29. Slide 29: Award-winning innovation

    Award-winning innovation. Trapezoidal-Shaped Fully-Annealed Pre-Tensioned Aluminum Strands Carbon Fiber Core Patented Aluminum Encapsulation Protective Layer Platts PUBLIC UTILITIES AMERICAN ll// MADE FORTNIGHTLY Global Energy // Awards U.S. DEPARTMENT OF ENERGY CONFIDENTIAL & PROPRIETARY. COPYRIGHT

  30. Slide 30: Proven technology backed by industry leaders

    Proven technology backed by industry leaders. ✓ EPRI Endurance Testing With thousands of miles installed since 2016 and extensive ✓ AEP Sequential Mechanical Testing third-party testing, TS Conductor has earned the support of industry-leading investors and utility customers. ✓ Kinectrics Type Testin

  31. Slide 31: Next generation advanced conductor

    Next generation advanced conductor. AECC’s patented design eliminates problems of first-generation advanced conductors at their source. It is the only advanced conductor that is fully compatible with standard installation and maintenance practices. Traditional Conductors Advanced Conductors 1908 - A

  32. Slide 32: Reconductoring: Up to 30-40% lower costs

    Reconductoring: Up to 30-40% lower costs. Traditional Conductors TS Conductor AECC Structure retrofit required including raising Reuse existing structures and height and/or strengthening crossarms crossarms without retrofit -------------------------1------------------------------- ------------------

  33. Slide 33: Market Capturing Road Map

    MARKET CAPTURING ROAD MAP DICABS pOWEING PROGRESS Increase Voltage rating up to 400kv Focus on Higher Focus on Retail, New Energy, Niche products Voltages,Retail, Exports ,Customer base & Niche Pan india Presence 280 People Strong team Products Focus on Data Centre Power needs Increase customer base

  34. Slide 34: ESG

    ESG Diamond Power Infrastructure Limited | Q3 FY 2025-26 | Investor Presentation 33

  35. Slide 35: Environmental Product Declaration (EPD) Certification

    Environmental Environmental Product Product Declaration Declaration (EPD) (EPD} Certification Certification Certified Products Certification Scope MV Cables – 33kV Aluminium Cable (19/33 kV) Raw Material Extraction ISO 14025 & EN 15804:2012+A2:2019 Manufacturing & Energy Use Cradle-to-Grave LCA (A1–

  36. Slide 36: Meeting Global EU and US Standards

    Meeting Global- EU and US Standards Key Environmental Metrics (33kV Cable - per km) CO, eq (Production Stage A1-A3) 35,400 kg CO, 90% Aluminium Recycling at End-of-Life 35-Year Lifecycle Assessed 18+ Environmental Indicators Disclosed Transparent Grid Electricity Modelling

  37. Slide 37: Sustainability and Governance

    SUSTAINIBILITY AND GOVERNANCE DICABS pOWEING PROGRESS Environmental (E) Social (S) Governance (G) • Energy efficiency projects • 100% Statutory • Board with independent • ISO 9001, 14001 & 18001 Compliance & Labour Law directors and regular certified Adherence audit oversight • Zero industrial waste

  38. Slide 38: Consistent Visibility, Lasting Impact

    Consistent Visibility, Lasting Impact Diamond Power Infrastructure Limited | Q3 FY 2025-26 | Investor Presentation 37

  39. Slide 39: Powering India's Infrastructure Together (CREDAI partnership)

    cEn~ X DIC{BS}- DIC{BS}- DICABS POWERING PROGRESS Powering India’s Infrastructure Together A strategic collaboration aimed at delivering high-quality, IS-compliant cabling solutions to CREDAI member projects across India-NATIONAL CABLE PARTNER CREDAI INDIA 2025-26 SUPPORTED BY HELD IN 88 88 @nee2es.

  40. Slide 40: Powering the Nation

    POWERING THE NATION DICABS POWERING PROGRESS Central Government Firms Corporate Clients if]JJffii if] crarefls crarefls POWERGRID POWERGRID $$» sAIL $» $» sAiL AM/NS INDIA ArcelorMittal Nippon Steel rsw Renewables JSW Renewables CleanMax CleanMax Enviro Energy b SERUM INSTITUTE OF INDIA Serum Instit

  41. Slide 41: New Energy Customers

    NEW NEW ENERGY ENERGY CUSTOMERS CUSTOMERS '> DICABS POWERING PROGRESS adani Solar � JJSW Energy as POWERGRID s uael i= i= uael fa fa ls ls gar8fsf gar8fsf NTC WAAREE WAAREE One One with the Sun with the Sun adani Renewables Since 1994 @ 'U TM TM CleanMax POWERING SUSTAINABILITY m9e@ m9e@ EEi EEi Pro

  42. Slide 42: Safe Harbour Statement

    SAFE HARBOUR STATEMENT DICABS pOWEING PROGRESS This presentation may have certain statements that may be "forward looking" such future projects, expectations, estimates or prospects have been prepared are including those relating to general business plans and strategy of Diamond Power complete or co

  43. Slide 43: Thank You

    www.dicabs. com www.dicabs.com E-Mail : enquiry @dicabs.com Website : www.dicabs.com Thank you THANK YOU FACTORY CORPORATE OF FICE OFFICE Block D, 17th Floor Office No 1703 to 1707, Vadadala, PHASE - ||, Savli, Vadodara, Gujarat, India. Near YMCA Cub, SG Highway, Makarba, T : 02667 251516 F : 02667