Birchcliff Energy Ltd. · TSX:BIR
Birchcliff Energy — Investor Presentation (August 2021)
56 slides from Birchcliff Energy's investor presentation, Aug 11, 2021

Slide 1: Corporate Presentation
CORPORATE PRESENTATION August 11, 2021

Slide 2: Advisories
ADVISORIES FORWARD-LOOKING INFORMATION: Certain statements contained in this presentation constitute forward‐looking statements and forward‐looking information (collectively referred to as “forward‐looking statements”) within the meaning of applicable Canadian securities laws. The forward‐looking st

Slide 3: People, Focus & Execution
CORPORATE OVERVIEW PEOPLE, FOCUS & EXECUTION August 11, 2021 3

Slide 4: Corporate Snapshot & Select Guidance
CORPORATE OVERVIEW Corporate Snapshot & Select Guidance Q2 2021 average production 75,265 boe/d Light oil (% of production) 2,766 bbls/d (4%) Condensate (% of production) 6,070 bbls/d (8%) NGLs (% of production) 7,647 bbls/d (10%) Natural gas (% of production) 353 MMcf/d (78%) Q2 2021 adjusted funds

Slide 5: Corporate Snapshot & Select Guidance Continued
CORPORATE OVERVIEW Corporate Snapshot & Select Guidance Continued Long-term (drawn) debt as at June 30, 2021 $721 million Total debt as at June 30, 2021 (1) $771 million Credit facilities limit as at June 30, 2021 $850 million Common shares (basic) as at June 30, 2021 267 million Market capitalizati

Slide 6: 2021E Natural Gas Marketing
CORPORATE OVERVIEW 2021E NATURAL GAS MARKETING AECO $3.46 $0.05 $0.48 $2.93 13% 43% Dawn 6% $4.00 $0.15 Alliance $1.30 $3.60 $2.55 38% $0.03 $0.43 $3.14 Note: All Birchcliff gas realizes a Henry Hub 9% heat premium(1) Dif. US$3.45/MMBTU $4.06 Pricing Hub US$1.17/MMBTU $1.46 Forecasted Sales Price at

Slide 7: Keys to Success
CORPORATE OVERVIEW KEYS TO SUCCESS Executives with proven track record, continuity since inception and significant ownership Management Highly experienced Management Team with excellent technical knowledge and a long history with the company 453 (449.9 net) Montney/Doig horizontal wells drille

Slide 8: 2021 Capital Program
LOOKING FORWARD 2021 CAPITAL PROGRAM 2021 Capital Program - Capital Expenditures by Classification Classification Capital (MM) DCCET Pouce Coupe(1) $93 - $102 (1) $38 - $41 Gordondale (2) $22 - $24 Additional Well Completions Capital Total DCCET $153 - $167 Facilities and Infrastructure $25 - $28 Ma

Slide 9: 2021 Capital Program - Wells Drilled
LOOKING FORWARD 2021 CAPITAL PROGRAM 2021 Capital Program - Wells Drilled and Brought on Production Total w ells drilled in 2021 Total w ells brought on production in 2021(1) Pouce Coupe Montney D1 horizontal natural gas wells 7 7 Montney D2 horizontal natural gas wells 3 3 Montney C horizontal natu

Slide 10: Five Year Plan Themes
LOOKING FORWARD FIVE YEAR PLAN THEMES Maximizing free funds flow and strengthening Birchcliff’s balance sheet over the five year period Fully utilizing the available processing capacity of Birchcliff’s existing infrastructure during the last three years of the five year period Reducing per-unit cash

Slide 11: Five Year Plan – Production
LOOKING FORWARD FIVE YEAR PLAN– PRODUCTION AS PER JANUARY 20, 2021 PRESS RELEASE Filling existing infrastructure drives down per-unit costs and maximizes efficiencies 100,000 Average Production (boe/d) 95,000 90,000 85,000 80,000 75,000 70,000 2021 2022 2023 2024 2025 Total Production 2021 2022 2023

Slide 12: Five Year Plan – Financial
LOOKING FORWARD FIVE YEAR PLAN– FINANCIAL AS PER JANUARY 20, 2021 PRESS RELEASE $600 $500 $400 Full utilization of $millions existing infrastructure $300 drives significant free $200 cash flow growth $100 $0 2021 2022 2023 2024 2025 Total Capex Free Funds Flow 2021 2022 2023 2024 2025 Annual Adjuste

Slide 13: Production History
TRACK RECORD OF EXECUTION PRODUCTION HISTORY 90,000 79,000 - 81,000 77,977 76,401 80,000 77,096 Compound per-share production growth of 10% per year since 2005. 70,000 (11% since PC Gas Plant Phase I 67,963 Average Production (boe/d) Completion in 2010) 60,000 49,236 50,000 38,950 40,000 33,734 30,0

Slide 14: Corporate Reserves
TRACK RECORD OF EXECUTION CORPORATE RESERVES (1) 1,200,000 $7,000 PDP - Reserves 1,100,000 TP - Reserves 2P - Reserves $6,000 1,000,000 PDP - NPV10 On a per share basis PDP, 1P and 900,000 TP - NPV10 2P reserves have increased at a compound annual growth rate of $5,000 2P - NPV10 800,000 12%, 18% an

Slide 15: Proven Track Record as a Low Cost Producer
TRACK RECORD OF EXECUTION PROVEN TRACK RECORD AS A LOW COST PRODUCER 5 Year Profitability Breakdown: 2016 2017 2018 2019 2020 Average Average AECO (CAD$/GJ) $2.05 $2.04 $1.42 $1.67 $2.11 $1.86 Average WTI (USD$/bbl) $43.32 $50.95 $64.77 $57.03 $38.91 $51.00 P&NG Revenue ($/Mcfe) (1) $3.12 $3.74 $3.6

Slide 16: Proven Track Record as a Low Cost Finder
TRACK RECORD OF EXECUTION PROVEN TRACK RECORD AS A LOW COST FINDER $12 PDP F&D 1P F&D 2P F&D Adjusted funds flow $10 netback(1) recycle ratios 0.6x F&D Cost ($/boe) $8 1.3x 1.4x 1.6x 1.5x 1.3x 1.8x 0.9x $6 1.0x 1.3x 2.0x 1.9x 1.8x 1.7x 2.0x $4 1.8x $2 17.4x 8.8x $0 2016 2017 2018 2019 2020 5 Yr Avg

Slide 17: Peer Emissions Metrics
ENVIRONMENTAL, SOCIAL AND GOVERNANCE PEER EMISSIONS METRICS(1)(2)(3)(4) August 11, 2021 17

Slide 18: Commitment to Environmental Stewardship
ENVIRONMENTAL, SOCIAL AND GOVERNANCE COMMITMENT TO ENVIRONMENTAL STEWARDSHIP Waste heat recovery units at the Pouce Coupe Gas Plant take the equivalent of >5,000 cars off the road annually Peer-leading water storage and infrastructure has taken the equivalent of over 50,000 large water handling truc

Slide 19: Investing in Our People and the Community
ENVIRONMENTAL, SOCIAL AND GOVERNANCE INVESTING IN OUR PEOPLE AND THE COMMUNITY $4.25 million donated to more than 100 local community groups and organizations in the last 5 years Continued partnerships with local communities through educational, cultural, and economic development initiatives Major s

Slide 20: Montney/Doig - A World Class Resource Play
MONTNEY/DOIG RESOURCE PLAY MONTNEY/DOIG - A WORLD CLASS RESOURCE PLAY 440 gross (437.7 net) Montney/Doig horizontal wells producing as of Dec 31, 2020 Resource density. Stacked resource up to 300 metres thick. Large areal extent. Extends over 50,000 square miles. Exceptional “fracability”. Low clay

Slide 21: Montney/Doig Mineralogy Leads to Excellent Fracability
MONTNEY/DOIG RESOURCE PLAY MONTNEY/DOIG MINERALOGY LEADS TO EXCELLENT “FRACABILITY” The Montney/Doig Resource Play rock type is composed of a Some other Resource Plays have a high percentage of clays high percentage of hard minerals, and a low percentage of and soft minerals. When fractured this res

Slide 22: Birchcliff Montney/Doig Resource Play
MONTNEY/DOIG RESOURCE PLAY BIRCHCLIFF MONTNEY/DOIG RESOURCE PLAY • Large contiguous land base with 415.7 (394.6 net) sections prospective for the Montney/Doig as at December 31, 2020 • Birchcliff has contiguous land block at Pouce Coupe and Gordondale of approximately 228 net sections • Stacked reso

Slide 23: Montney/Doig Multi Layer Opportunity
MONTNEY/DOIG RESOURCE PLAY MONTNEY/DOIG MULTI LAYER OPPORTUNITY August 11, 2021 23

Slide 24: Science & Technology Pad
MONTNEY/DOIG RESOURCE PLAY SCIENCE & TECHNOLOGY PAD August 11, 2021 24

Slide 25: Birchcliff Montney/Doig Inventory 2020YE
MONTNEY/DOIG RESOURCE PLAY BIRCHCLIFF MONTNEY/DOIG INVENTORY 2020YE Note: Location inventory includes three (3) 100% W.I. existing wells that have proved non-producing reserves. (2 in Pouce Coupe and 1 in Elmworth) August 11, 2021 25

Slide 26: 2020 Liquids Summary
MONTNEY/DOIG RESOURCE PLAY 2020 LIQUIDS SUMMARY 2020 Well Rates (IP60) MULTI-INTERVAL CUBE-STYLE DEVELOPMENT Discovery of Extension to the Gordondale Light Oil Pool • In Q3 2020, Birchcliff brought the production on from its 14-well pad (14-19-079-12W6) located in the northeastern area of Pouce Coup

Slide 27: 2021 Capital Program
MONTNEY/DOIG RESOURCE PLAY 2021 CAPITAL PROGRAM 2021 Budget Locations & Well Rates (IP60) MULTI-INTERVAL CUBE-STYLE DEVELOPMENT 2021 Capital Program Major Themes • Capital Program focused on low-risk drilling opportunities to generate free funds flow • 73% of capital to be spent on DCCET activities

Slide 28: Pouce Coupe Overview
POUCE COUPE POUCE COUPE OVERVIEW • Proven asset in development phase • Wells show high initial deliverability, low terminal decline and stable long term production • Predictable results with improving gas rates & liquids yields • 100% owned and operated • No land expiry issues • The 2021 drilling pr

Slide 29: 10-Well 14-06 Pad Raw Production
POUCE COUPE 10-WELL 14-06 PAD RAW PRODUCTION (BOE/D) 10-well pad continuing to build on multi- interval cube-style development success 14-06 Pad Initial Results IP 30(1) IP 60(1) Aggregate production rate (boe/d) 9,612 8,794 Aggregate natural gas production rate (Mcf/d) 42,871 41,326 Aggregate conde

Slide 30: Pouce Coupe 2021 Type Curve
POUCE COUPE POUCE COUPE 2021 TYPE CURVE *Assumptions: Fx 1.25 CAD/USD *All economics are before tax; reference date is January 1, 2021 August 11, 2021 30

Slide 31: Multi-Interval Cube-Style Development
POUCE COUPE MULTI-INTERVAL CUBE-STYLE DEVELOPMENT August 11, 2021 31

Slide 32: Gordondale Overview
GORDONDALE GORDONDALE OVERVIEW • High oil & NGLs weighting • Strategic infrastructure • Low base production decline • The 2021 drilling program included 8 (8.0 net) horizontal oil and natural gas wells including 2 Montney D1 natural gas wells, 1 Montney D2 natural gas well, 1 Montney C natural gas w

Slide 33: 4-Well 05-07 Pad Raw Production
GORDONDALE 4-WELL 05-07 PAD RAW PRODUCTION (BOE/D) Successful extension of the Montney C interval into Gordondale as well as continued success on Montney D1 & D2 intervals 05-07 Pad Initial Results IP 30(1) IP 60(1) Aggregate production rate (boe/d) 5,272 4,614 Aggregate natural gas production rate

Slide 34: Gordondale Base Production History
GORDONDALE GORDONDALE BASE PRODUCTION HISTORY(1) Birchcliff Last well drilled in 2014 (on-stream 2015) Added Field Acquisition with peak production of ~35,000 boe/d Compression (~22,000 BOE/d) Scheduled AltaGas Plant Turnaround AltaGas Deep Cut Plant on stream October 2012 and Montney oil pool devel

Slide 35: Gordondale 2021 Halo Oil Type Curve
GORDONDALE GORDONDALE 2021 HALO OIL TYPE CURVE *Assumptions: Fx 1.25 CAD/USD *All economics are before tax; reference date is January 1, 2021 August 11, 2021 35

Slide 36: Pouce Coupe Drilling Performance
D&C CONTINUOUS PERFORMANCE IMPROVEMENT POUCE COUPE DRILLING PERFORMANCE August 11, 2021 36

Slide 37: Pouce Coupe Completion Evolution
D&C CONTINUOUS PERFORMANCE IMPROVEMENT POUCE COUPE COMPLETION EVOLUTION Completion Parameter 2016 2017 2018 2019 2020 2021 Design # of Wells 14 37 15 17 24 25 Completion Fluid Slickwater Slickwater Slickwater Slickwater Slickwater Slickwater Lateral Length (m) 2,074 2,202 2,478 2,298 2,201 2,692 Num

Slide 38: Gordondale Drilling Performance
D&C CONTINUOUS PERFORMANCE IMPROVEMENT GORDONDALE DRILLING PERFORMANCE August 11, 2021 38

Slide 39: Gordondale Completion Evolution
D&C CONTINUOUS PERFORMANCE IMPROVEMENT GORDONDALE COMPLETION EVOLUTION Asset Acquired Asset Acquired Completion Parameter 2016 2017 2018 2019 2020 2021 Design # of Wells 22 13 16 8 8 Completion Fluid Slickwater Slickwater Slickwater Slickwater Slickwater Lateral Length (m) 2,352 1,959 2,058 2,273 2,

Slide 40: Engineered Completions for Montney/Doig Development
D&C CONTINUOUS PERFORMANCE IMPROVEMENT ENGINEERED COMPLETIONS FOR MONTNEY/DOIG DEVELOPMENT Industry Range Birchcliff Best Practices Oil Birchcliff Best Practices Gas Liner type Openhole or Cemented Cemented Cemented Fluid CO2, N2, Hybrid, Slickwater Slickwater Slickwater 100 – 400 m 200 – 250 m 300

Slide 41: Pouce Coupe Natural Gas Plant
POUCE COUPE NATURAL GAS PLANT Production Processed through the PC Gas 2018 2019 2020 H1/21 Plant 31% Average daily production, net to Birchcliff: Natural gas (Mcf) 250,011 263,108 239,419 239,768 69% Oil, condensate & NGLs (bbls) 2,609 4,735 5,440 5,793 Total boe (6:1) 44,278 48,587 45,343 45,754 1H

Slide 42: Key Strategic Advantages
POUCE COUPE NATURAL GAS PLANT KEY STRATEGIC Corporate Operating Costs vs. % of Natural Gas Sales Volumes Processed at the PC Gas Plant $8.00 100% Corporate Operating Cost ($/boe) ADVANTAGES Volume Through PC Gas Plant 80% $6.00 60% $4.00 • 100% owned and operated 40% • Generates operating cost savin

Slide 43: Building on Our Past
BUILDING ON OUR PAST Forecasted annual average production of Birchcliff’s average daily production was 76,401 boe/d in 79,000-81,000 boe/d in 2020 compared to 2,793 boe/d in 2005, a compounded 2021 annual growth rate of 25% per year over that span. 1 2 3 4 5 6 7 8 9 10 11 12 2004 2021 July 2016: Com

Slide 44: Building on Our Past - Operating & Cash Costs
BUILDING ON OUR PAST Birchcliff has increased production at a compound annual growth rate of 25% since 2005. Operating & Cash Costs* $20 $18 Operating and cash costs have $16 decreased by 72% and 41% since $14 $12 2008 largely due to horizontal drilling success and benefits $/boe $10 $8 $6 achieved

Slide 45: Building on Our Past - Reserves Growth
BUILDING ON OUR PAST Reserves Growth 1,200 4,800 Birchcliff has added significant 1,000 4,000 low cost reserves since 800 3,200 commencing operations in boe/1,000shares MMboe 600 2,400 2005. On a per common share 400 1,600 basis, PDP, 1P and 2P reserves 200 800 grew 12% per year, 18% per 0 0 year an

Slide 46: Canada's LNG Advantage
APPENDIX CANADA’S LNG ADVANTAGE Cleaning Our World’s Environment, a 2.0 Bcf/d LNG Facility Could; • Displace 50 million tonnes of carbon emissions from coal-fired power generation • Replace approximately 10 large-scale coal fired power plants in China Benefits • Reduce Alberta’s 2016 annual GHGs on

Slide 47: Proximal to Infrastructure with Long Term Exposure to LNG Export
APPENDIX PROXIMAL TO INFRASTRUCTURE WITH LONG TERM EXPOSURE TO LNG EXPORT Montney/Doig Birchcliff Montney/Doig Production Resource Play Owned Infrastructure Pouce Coupe Gas Plant Nova Pipeline System North American Market LNG Export Source: RBC Energy Insights: The Montney – Tracking an Elephant Aug

Slide 48: Montney/Doig Well Locations
APPENDIX MONTNEY/DOIG WELL LOCATIONS Existing and Potential Future Drilling Locations by Interval at December 31, 2020 Average Proved Plus Probable Reserves plus Cumulative Gross Number of 2P Net Number of 2P Production Horizontal Well Locations Horizontal Well Locations (Bcfe) Potential Potential P

Slide 49: Series A Perpetual Preferred Shares
APPENDIX SERIES A PERPETUAL PREFERRED SHARES Preferred Share Details Series A Number of Shares 2,000,000 Issue Date August 8, 2012 TSX Trading Symbol BIR.PR.A Issue / Par Price $25.00 per share Quarterly Dividend $0.523375 per share Yield on Par Price 8.374% Redeemable by Holder No • September 30, 2

Slide 50: Series C Preferred Shares
APPENDIX SERIES C PREFERRED SHARES Preferred Share Details Series C Number of Shares 1,533,108 Issue Date June 14, 2013 TSX Trading Symbol BIR.PR.C Issue / Par Price $25.00 per share Quarterly Dividend $0.4375 per share Yield at Issue 7.0% June 30, 2020 and each Redeemable by Holder quarter thereaft

Slide 51: Corporate Information
CORPORATE INFORMATION OFFICERS AUDITORS A. Jeffery Tonken KPMG LLP, President, CEO and Chairman of the Board Chartered Professional Accountants Calgary, Alberta Myles R. Bosman Vice-President, Exploration and Chief Operating Officer RESERVES EVALUATORS Bruno P. Geremia Deloitte LLP Vice-President an

Slide 52: Advisories
ADVISORIES PRESENTATION OF OIL AND GAS RESERVES AND RESOURCES: Deloitte prepared the 2019 Deloitte Reserves Report, the 2019 Consolidated Reserves Report and the 2020 Deloitte Reserves Report. McDaniel prepared the 2019 McDaniel Reserves Report. In addition, Deloitte and McDaniel prepared reserves e

Slide 53: Advisories
ADVISORIES Project Maturity Subclasses for Resources The project maturity sub‐classes for contingent resources are “development pending”, “development on hold”, “development unclarified” or “development not viable”, all as defined in the COGE Handbook. “Development pending” is when resolution of the

Slide 54: Advisories
ADVISORIES With respect to disclosure of F&D costs disclosed in this presentation: F&D costs including FDC have been presented herein. F&D costs for each reserves category in a particular period are calculated by taking the sum of: (i) exploration and development costs incurred in the period; and (i

Slide 55: Advisories
ADVISORIES “Transportation and other expense” denotes transportation expense plus marketing purchases minus marketing revenue on a per boe basis. Birchcliff may enter into certain marketing purchase and sales arrangements with the objective of reducing any available transportation and/or fractionati

Slide 56: Thank You Team Birchcliff
THANK YOU TEAM BIRCHCLIFF Jeffrey Akeroyd, Bradley Alexander, Karen Allen, Diana Almeida, Tracy Anderson, Camille Ashton, Gaetano Aurigemma, Angela Belbeck, Tyrus Bender, Riley Berge, Lindsey Berlinger, Daniel Blattler, Calvin Bohdan, Angela Boire, Darryl Bolch, Deborah Borthwick, Myles Bosman, Jeff
Source: Internet Archive copy of birchcliffenergy.com
More decks from Birchcliff Energy Ltd.
Investor Presentation (November 2026)51 slides · Nov 12, 2026
Investor Presentation (August 2026)51 slides · August 2026
Investor Presentation (May 2026)53 slides · May 2026
Investor Presentation (March 2026)48 slides · March 2026
Investor Presentation (January 2026)46 slides · January 2026
Investor Presentation (November 2025)45 slides · November 2025