  1. Slide 1: Australia's Next Rare Earth Producer

    Begin the Future - Enabling Green Technologies AUSTRALIA’S NEXT RARE EARTH PRODUCER Hastings Technology Metals Limited (HAS.ASX) Investor Presentation, 25 November 2021

  2. Slide 2: Important Notices and Disclaimer

    Important Notices and Disclaimer All currency amounts are in A$ unless stated otherwise. Disclaimer This presentation has been prepared by Hastings Technology Metals Limited (“Company” or "Hastings"). It does not purport to contain all the information that a prospective investor may require in conne

  3. Slide 3: Important Notices and Disclaimer

    Important Notices and Disclaimer ASX Listing Rule 5 requirements This presentation includes estimates of mineral resources and ore reserves in relation to Hastings’ mining projects. Hastings has previously reported these estimates in the ASX announcements “Yangibana Project updated Measured and Indi

  4. Slide 4: Australia's Next Rare Earth Producer

    Australia’s Next Rare Earth Producer 52% NdPr to TREO ratio – critical to permanent magnets used in EV’s Beneficiation: upgrade of up to 25x mine grade Offtake: 10 year contract signed with thyssenkrupp (2) Supply: 10 year Master Supply Agreement signed with Schaeffler (2) Early works: commenced Q3

  5. Slide 5: Project Milestones

    Yangibana Milestones since 2014 First exploration to construction start Jun 20 April 21 Schaeffler TK Offtake Master Supply PROJECT MILESTONES Contract Agreement signed Oct 19 signed Feb 19 70,000t Nov 17 Successful 2nd pilot EPCM contract Native Title plant test - Higher signed with DRA Jul 20 agre

  6. Slide 6: Delivering Shareholder Value

    Delivering Shareholder Value Upstream - Yangibana mine site location Downstream – Onslow hydrometallurgical location Wheatstone Construction Camp Wheatstone LNG Project 436 km Gascoyne Open Pit Mining/Beneficiation Final product (1) Onslow Region, Long life, Tier 1 project 15,000tpa MREC Town, Explo

  7. Slide 7: Onslow (Hydromet Plant) & Yangibana (Bene Plant) Location

    Onslow (Hydromet Plant) & Yangibana (Bene Plant) 11 Location close to Power, Water and Gas services 2 Hydro upgrades concentrate to 59% TREO 331 Tier 1 Metso-Outotec equipment selected 42 Beneficiation upgrade of concentrate to 27% TREO 1 Refer ASX announcement “Successful Completion of Yangibana De

  8. Slide 8: Yangibana Project Summary

    Yangibana Project Summary KEY PARAMETERS Phase One: Enabling Infrastructure Mining Production (Ore) 1.2 Mtpa  Early works program; Mine Life (2) 15 years  300 room village installation Annual (MREC) production (1) ~15,000 tpa Annual (TREO) production (1) ~8,500 tpa  Airstrip construction Average

  9. Slide 9: Yangibana Project – Exceeding On All Key Metrics

    Yangibana Project – Exceeding On All Key Metrics 37% NdPr content – double world average Highest Margin Operation Source: Ord Minnett Dec 2020 Source: CRU Jan 2021 Yangibana MREC – unrivalled basket price Low capital Intensity – A$M Source: Ord Minnett Dec 2020 Source: Ord Minnett Dec 2020. Yangiban

  10. Slide 10: Yangibana Project – The Year in Review

    Yangibana Project – The Year in Review Significant Mineral Resource Upgrade Category M Tonnes %TREO %Nd2O3+Pr6O11 TREO t Measured 4.90 1.01 0.38 49,442 Indicated 16.24 0.95 0.33 154,750 sub-total 21.14 0.97 0.34 204,192 Inferred 6.27 0.99 0.31 62,225 TOTAL 27.42 0.97 0.33 266,417 37% Increase in Ore

  11. Slide 11: Yangibana Project – The Year in Review

    Yangibana Project – The Year in Review Grade Control Results Ore Sorting testwork Results Category Tonnes %TREO %Nd2O3+Pr6O11 TREO t  26% upgrade to the life of mine total rare earths oxide (TREO) grade;  96% overall TREO recoveries after ore sorting; Grade Control 140,688 1.04 0.43 1,457  7.1% i

  12. Slide 12: Exploration: 8kms long mineralised trend

    Exploration: 8kms long mineralised trend 1. Major 8km long zone of economic mineralisation at Fraser’s (8m @ 7.28% TREO & 8m @ 3.51% TREO) - Simon’s Find - Bald Hill, open in all directions. 2. Simon’s Find contains 52% of rare earths as NdPr, provides strong early cashflows to project. 3. Next dril

  13. Slide 13: Increased support for Critical Minerals supply chain

    Increased support for Critical Minerals supply chain Increased importance being put on sustainably sourced critical minerals by governments Hastings Technology Metals Limited (HAS.ASX) Investor Presentation, 25 November 2021 13

  14. Slide 14: NdPr Prices Showing Increased Resilience

    NdPr Prices Showing Increased Resilience NdPr Oxide Price (12 months to Sept 2021) Indicative NdPr Pricing Trend Pr6O11 25%, Nd2O3 75% ExW China 900,000 800,000 700,000 600,000 RMB/Mt 500,000 400,000 300,000 200,000 100,000 0 NdPr Oxide prices have seen continued strength in NdPr oxide prices are ex

  15. Slide 15: Global Market is Moving towards Supply Deficit

    Global Market is Moving towards Supply Deficit Market for NdPr expected to be in deficit over coming decade due to strong demand growth Global NdFeB demand expected to increase 3.9x Sizeable supply gap emerges in later part of this over the period 2020-2038 (CAGR 8.3%) decade without prompt new inve

  16. Slide 16: Project Capex

    Project Capex Cost validation exercise currently underway Project Budget, Schedule and Economics Capital Requirements  Revised project budget and schedule to be released following completion of cost validation exercise currently A$M underway Project Capex  Revised project economics to be released

  17. Slide 17: Project Finance update

    Project Finance update Credit approvals currently being for A$300 to $400 million in project finance package  Loans to be underpinned by long term offtake contracts with German Tier 1 companies, Schaeffler and Thyssenkrupp.  KPMG Corporate Finance Australia advising on multi lenders debt financing

  18. Slide 18: Offtake Contracts

    Offtake Contracts ~70% of production contracted for 10 yrs with strong offtake counterparties Offtake Counterparty Master Supply Agreement Binding Offtake contract Binding Offtake Agreement Contract Status Signed Jun 2020 (2) Signed Apr 2021 (3) Signed Nov 2018 (1) 9,000t MREC p.a. yrs 1 – 5 Quantit

  19. Slide 19: ESG & Sustainability – The Only Way Forward

    ESG & Sustainability – The Only Way Forward Maiden sustainability Becoming an reportfair environmental, cautious, delivered in Q4 and transparent rare 2021 earth producer  Transparent reporting – Inaugural sustainability report released o Guided by Global Reporting Initiative (GRI) Standards, inclu

  20. Slide 20: Yangibana Project Upcoming Milestones

    Yangibana Project Upcoming Milestones Project progress accelerating with early siteworks currently underway Capital expenditure and final project schedule due Q4 2021 Debt financing credit approvals expected in Q4 2021 Complete infrastructure construction at Yangibana site in 2022 Commence beneficia

  21. Slide 21: Capital Structure

    Capital Structure Capital Structure $/Shares Share Price Performance Cash Balance (at 30 Sept 2021) A$102.5M Price ($) Volume (m) 25.0 Shares on Issue 1,738M $0.70 Highest Share PriceMargin (18th NovOperation $0.60 20.0 2021) A$0.255 $0.50 15.0 $0.40 Market Capitalisation A$443M $0.30 10.0 Performan

  22. Slide 22: Board of Directors

    Board of Directors Jean Claude Bruce McFadzean Charles Lew Guy Robertson Mal Randall Neil Hackett Steinmetz NED NED Executive Finance NED NED Chairman Director • Joined the Board in • Joined the Board in • Appointed Chairman in • Served on the Board of • Joined the Board in • Joined the Board in Jul

  23. Slide 23: Experienced Senior Management Team

    Experienced Senior Management Team Nick Holthouse Matthew Allen Andrew Reid Nick Bennett Narelle Marriott Lisa McGrath Rachael Ward-Pryce Dr Lara Jefferson GM Engineering & Chief Financial Officer Chief Operating Project Manager Acting GM Environment HR Manager GM Sustainability Op’s Readiness Offic

  24. Slide 24: Mineral Resources and Reserves

    Mineral Resources and Reserves Yangibana Project – Total JORC Mineral Resources as at 30 June 2021 (1) Category Million Tonnes %TREO %Nd2O3+Pr6O11 TREO Tonnes Measured 4.9 1.01 0.38 49,442 Indicated 16.24 0.95 0.33 154,750 Sub-total 21.14 0.97 0.34 204,192 Inferred 6.27 0.99 0.31 62,225 TOTAL 27.42

  25. Slide 25: Australia's Next Rare Earth Producer

    Australia’s Next Rare Earth Producer Begin the Future - Enabling Green Technologies Perth Office Singapore Office T: +61 8 6117 6118 E: info@hastingstechmetals.com Level 8, 167 St Georges Terrace 10 Anson Road W: hastingstechmetals.com Perth WA 6000 #19-02 International Plaza Australia Singapore 079

Hastings Technology Metals — Investor Presentation (November 2021) on 6ix