Slide 1: Working Together for Our Future Public Site Tour & Dinner
Agrium Redwater Fertilizer Operations Working Together for Our Future Public Site Tour & Dinner Presentation Date: November 22nd, 2005 Location: Redwater Fertilizer Operations Facility where the future is growing
Slide 2: Presentation Agenda
PRESENTATION AGENDA • Presentation is Divided into the Following Topics: 1. Where are We At & What is the Outlook on the Future 2. Community Economic Benefits 3. Environmental Application Process 4. Gypsum Storage Area Extension 5. Fluoride & Particulate Matter Related Studies Information 6. Questio
Slide 3: Where are We At & What is the Outlook on the Future
Agrium Redwater Fertilizer Operations Where are We At & What is the Outlook on the Future where the future is growing
Slide 4: Where are We At & the Future - Discussion Topics
WHERE ARE WE AT & THE FUTURE - DISCUSSION TOPICS • This Part of the Presentation will Discuss the Following: - Agrium Redwater Facility Aerial View - On Site Product Storage & Production - Current Status of Our Nitrogen & Phosphate Operations - On Site Product Handling Statistics - Changes, Performa
Slide 5: Redwater Operations Aerial View
WHERE ARE WE AT & THE FUTURE - REDWATER OPERATIONS AERIAL VIEW N GYPSUM STORAGE GYPSUM STORAGE CURRENT GYPSUM EXTENSION PHASES III & IV EXTENSION PHASES I & II STORAGE AREA (FUTURE) (CONSTRUCTION COMPLETED BY 2006) EXTENSION EXTENSION PHASE III PHASE I POND A POND D COOLING POND EXTENSION EXTENSION
Slide 6: Redwater Production & Storage Capabilities
1,000,000 1,200,000 200,000 400,000 600,000 800,000 0 Ammonia 960,000 (Gross) 77,000 720,000 Urea 70,000 170,000 Nitric Acid 1,000 Ammonium 215,000 Nitrate 45,000 Redwater Production & Storage Capabilities Sulphuric 1,030,000 Acid 9,000 Phosphoric 340,000 Acid 2,500 WHERE ARE WE AT & THE FUTURE - WH
Slide 7: Current Status of Operations - Nitrogen Operations
CURRENT STATUS OF OPERATIONS - NITROGEN OPERATIONS • Ammonia I (Plant 01): - Is Currently Shutdown (Operates as a Swing Plant) Due to Market & Economic Conditions - Typical Operating Rate for this Process Unit is 750 Metric Tonnes per Day • Ammonia II (Plant 09): - Is Currently Operating at Full Cap
Slide 8: Current Status of Operations - Nitrogen Operations (Continued)
CURRENT STATUS OF OPERATIONS - NITROGEN OPERATIONS (CONTINUED) • Nitric Acid (Plant 02): - Is Currently Shutdown Due to Maintenance & Capital Project Work. - Typical Unit Operating Rate for this Process Unit is 480 Metric Tonnes per Day • Urea (Plant 04): - Is Currently Operating at Full Capacity at
Slide 9: Current Status of Operations - Phosphate Operations
CURRENT STATUS OF OPERATIONS - PHOSPHATE OPERATIONS • Granulation East Train (Plant 07): - Is Currently Operating at a Rate of 1,700 Metric Tonnes Per Day of Monoammonium Phosphate. - Typical Operating Rate is 2,000 Metric Tonnes Per Day • Granulation West Train (Plant 07): - Is Currently Operating
Slide 10: Current Status of Operations - Phosphate Operations (Continued)
CURRENT STATUS OF OPERATIONS - PHOSPHATE OPERATIONS (CONTINUED) • Sulphuric Acid I (Plant 05): - Is Currently Operating at a Rate of 1,870 Metric Tonnes Per Day - Typical Operating Rate is 1,950 Metric Tonnes Per Day • Sulphuric Acid II (Plant 08): - Is Currently Operating at a Rate of 1,300 Metric
Slide 11: Product Handling Statistics
WHERE ARE WE AT & THE FUTURE - PRODUCT HANDLING STATISTICS • Over 2 Million Tonnes Annual Shipping Capability • 20 Kilometers of Track, Store 600 Cars, & 4 Locomotives • Ammonia Rail Car Purging and Repair Facility • Receive and Offload 10,000 Rail Cars per Year of Phosphate Rock ELECTRIC HYBRID LOC
Slide 12: Changes & Performance
WHERE ARE WE AT & THE FUTURE - CHANGES & PERFORMANCE • Proud to be Chosen as Both one of the Top 100 Employers in Canada and Top 20 Employers in Alberta for 2006 • Agrium Discontinued Production of Agricultural Grade Ammonium Nitrate: - Limited Impact on Redwater Facility - Continue Production of In
Slide 13: Our Future Outlook
WE ARE WE AT & THE FUTURE - OUR FUTURE OUTLOOK • Reviewing Potential Synergies with North West Upgrader • Reviewing Potential Carbon Dioxide Plant • Reviewing Potential Options for Alternate Feedstocks • Recently Acquired Imperial Oil Distribution Facilities • Recent Offer to Purchase Royster-Clark
Slide 14: Community Economic Benefits
Agrium Redwater Fertilizer Operations Community Economic Benefits where the future is growing
Slide 15: Community Benefits - Discussion Topics
COMMUNITY BENEFITS - DISCUSSION TOPICS • This Part of the Presentation will Discuss the Following: - About Agrium - Commitment to Our Community - Redwater Direct Economic Impacts
Slide 16: Community Benefits - About Us
COMMUNITY BENEFITS - ABOUT US • The Largest Integrated Fertilizer Producer in Canada • The Largest Corporate Employer in Sturgeon County • Almost 40% of all of Agrium’s Alberta Employees Work at the Redwater facility • Phosphate Sales from this Site Account for 67% of the Canadian Market and 7% of t
Slide 17: Commitment to the Communities
COMMUNITY BENEFITS - COMMITMENT TO THE COMMUNITIES • Responsive - Agrium Believes in Open and Honest Communications and are Active Members of the Community • Supportive - Agrium Supports a Wide Variety of Charities - Agrium and its employees are active Supporters of Local United MORINVILLE BULLARAMA
Slide 18: Commitment to the Communities (Continued)
COMMUNITY BENEFITS - COMMITMENT TO THE COMMUNITIES (CONTINUED) • Educating - Over 100 Tours are Held Annually at our Nine Production Facilities - Seed Survivor Education Program: Aids Educators to Demonstrate the Role of Agriculture in the Environment, Society and our Economy Through Curriculum-Base
Slide 19: Direct Redwater Economic Impacts
COMMUNITY BENEFITS - DIRECT REDWATER ECONOMIC IMPACTS • Employment - 450 Regular Employees - $35 Million per Year in Direct Payroll - Over 60% of Employees Live Locally - Approximately 100 Contractors Valued at $15 Million per Year • Charitable Donations - $165,000 Given Annually in Charitable Donat
Slide 20: Environmental Application Process & Status
Agrium Redwater Fertilizer Operations Environmental Application Process & Status where the future is growing
Slide 21: Application Process - Discussion Topics
APPLICATION PROCESS - DISCUSSION TOPICS • This Part of the Presentation will Discuss the Following: - General Application Information - Alberta Environment Reference Document - Stages of the Approval Process - Our Application Content - Public Consultation & Involvement
Slide 22: General Application Information
APPLICATION PROCESS - GENERAL APPLICATION INFORMATION • All Industrial Facilities must have an “Approval to Operate”, which is Issued by Alberta Environment • Our Approval was Issued in May 1997 and Expires in May 2007 • Our Expectation is that the New Approval will also be for 10 Years • Our Renewa
Slide 23: Alberta Environment Reference Document
APPLICATION PROCESS - ALBERTA ENVIRONMENT REFERENCE DOCUMENT • The Document that we must follow to Ensure that all Parts of Application Renewal have been Included is: Alberta Environmental Protection and Enhancement Act (AEPEA) Approval and Registrations Procedure Regulation Applications for Approva
Slide 24: Stages of the Approval Process
APPLICATION PROCESS - STAGES OF THE APPROVAL PROCESS • The Alberta Environment Operating Approval Application Process Consists of 5 Distinct Stages: 1. Filing of the Application to Alberta Environment 2. Notice Requirements for a Complete Application 3. Review of the Application by Alberta Environme
Slide 25: Agrium Redwater Application Content
APPLICATION PROCESS - AGRIUM REDWATER APPLICATION CONTENT • The Approval Renewal Application Format that we will be Submitting to Alberta Environment Consists of the Following Sections: - Preface - Groundwater Management - Introduction - Soil Management - Public Consultation - Waste Management - Pla
Slide 26: Public Consultation & Open Houses
APPLICATION PROCESS - PUBLIC CONSULTATION & OPEN HOUSES • We are Committed to Keeping the Public informed of Our Operations & Activities • We Plan on Holding 3 Open Houses During the Application Development Process to Keep You Information of What is Going on and Remain In-Touch with Our Community •
Slide 27: Public Consultation & Internet Site
APPLICATION PROCESS - PUBLIC CONSULTATION & INTERNET SITE • An Internet Site has been Setup to keep the Public Informed of Our Application Development • Our Internet Web Site contains the Following Information: 1. Open House Presentations & Documentation 2. Our Existing Environmental Approval and Am
Slide 28: Gypsum Storage Area Extension
Agrium Redwater Fertilizer Operations Gypsum Storage Area Extension where the future is growing
Slide 29: Gypsum Storage Extension - Discussion Topics
GYPSUM STORAGE EXTENSION - DISCUSSION TOPICS • This Part of the Presentation will Discuss the Following: - Project Costs & Timeline - High Level Technical Information
Slide 30: Project Costs & Timelines
GYPSUM STORAGE EXTENSION - PROJECT COSTS & TIMELINES • Total Project Cost for Gypsum Storage Extension Phases I & II: Will be 45 Million Dollars (CAN) • Project Timeline: - Development & Approval Stage: 2002-2004 AERIAL VIEW OF PHASE I PRIMARY LINER - Phase I Construction Phase: April to December 20
Slide 31: Gypsum Storage Extension - Technical Information
GYPSUM STORAGE EXTENSION - TECHNICAL INFORMATION • Total Amount of Earth Moved to Date: 1,200,000 Cubic Yards • Amount of HDPE* 60 Mil Liner Installed: 3,500,000 Square Feet • Soil Bentonite Cut Off Wall Area: 6,118 Feet Long & Averaging 33-1/2 Feet in Depth, & 30 Inches in Width BENTONITE CUT OFF W
Slide 32: Fluoride & Particulate Matter Related Studies Information
Agrium Redwater Fertilizer Operations Fluoride & Particulate Matter Related Studies Information where the future is growing
Slide 33: Related Studies - Discussion Topics
RELATED STUDIES - DISCUSSION TOPICS • This Part of the Presentation will Discuss the Following: - Improved Monitoring Initiatives Overview - Fluoride Results - Vegetation Monitoring, Garden Plot Information, Forage Grass Sampling, Fluoride Monitoring & Silicon Tetrafluoride (SiF4) Results - Particul
Slide 34: Related Studies - Improved Monitoring
RELATED STUDIES - IMPROVED MONITORING We have undertaken a number of initiatives to improve our monitoring program. These enhancements include, but are not limited to: • Additional Vegetation Monitoring Locations Added for 2005 • Garden Plot Testing • Fall 2005 Surrounding Area Vegetation Review by
Slide 35: Vegetation Monitoring Program
RELATED STUDIES - VEGETATION MONITORING PROGRAM NE-N2 • 14 Additional Vegetation F NE3 NE2 Sampling Sites Added in 2005 NW3 NE-1N E Garden-1 Garden-2 NW-1NW • 7 Sites Specifically Added to NW2 NE-E1 NE-E2 NE1 D Improve the Forage Grass NW1 C and/or Grass Monitoring W1 B IMP1 E-1E • 2 Garden Plots to
Slide 36: Garden Plots Information
RELATED STUDIES - GARDEN PLOTS INFORMATION • Second Year of Testing Completed in 2005 • 3 Garden Plot Locations: 1. North East of Existing Gypsum Storage Area (Plot 1) 2. North West of Existing Gypsum Storage Area (Plot 2) 3. Near the Town of Andrew (Control Plot) • 17 Vegetables Grown & Sampled per
Slide 37: Summary of Garden Plot Test Results
RELATED STUDIES - SUMMARY OF GARDEN PLOT TEST RESULTS 2005 Garden Plot Test Results (mg/kg Fluoride - “As Is” Basis) NE Garden Plot NW Garden Plot Andrew Garden Plot IGA Produce Typical Food Fluoride Garden Produce (Plot 1) (Plot 2) (Control Plot) (Comparison) Content Range 1 Cabbage 0.1 0.1 <0.1 0.
Slide 38: Summary of Forage Grass Results
RELATED STUDIES - SUMMARY OF FORAGE GRASS RESULTS Growing Season Average 2 Month Average Sampling Results 50.0 80.0 GROWING SEASON AVERAGE GUIDELINE* 70.0 40.0 2 MONTH AVERAGE GUIDELINE* MG/KG FLUORIDE 36.2 60.0 MG/KG FLUORIDE 34.3 30.6 50.0 30.0 40.0 30.0 20.0 18.9 20.0 10.0 10.0 7.6 7.0 9.7 0.0 A
Slide 39: Summary of Fluoride (HF) Monitoring
RELATED STUDIES - SUMMARY OF FLUORIDE (HF) MONITORING Gaseous & Particulate Fluoride Monitoring Results - Site 1 Gaseous & Particulate Fluoride Monitoring Results - Site 2 CALIFORNIA EPA HF REFERENCE EXPOSURE LIMIT* CALIFORNIA EPA HF REFERENCE EXPOSURE LIMIT* 14.0 14.0 FLUORIDE CONCENTRATON (μG/M3)
Slide 40: Summary of Silicon Tetrafluoride (SiF4) Study
RELATED STUDIES - SUMMARY OF SILICON TETRAFLUORIDE (SiF4) STUDY • URS Corporation (Engineering Consulting Company): - Was Engaged in August of 2004 to Perform Silicon Tetrafluoride Testing on the Gypsum Storage Using a FTIR (Fourier Transform Infra Red) Laser System • Senes (Environmental Scientist
Slide 41: Summary of Particulate Matter Results
RELATED STUDIES - SUMMARY OF PARTICULATE MATTER RESULTS 24 Hour Average TEOM1 Particulate Data June 20th to August 31st, 2005 Sampling Period Site 2 - Summer Sampling 100.0 PARTICULATE MATTER CONCENTRATON (μG/M3) TSP GUIDELINE* Total Suspend Particulate (TSP) 80.0 Particulate Matter Micron Size 10 (
Slide 42: Related Studies - Final Thoughts
RELATED STUDIES - FINAL THOUGHTS • Monitoring Program has been Significantly Expanded • To Date, the Gathered Data is Consistent with Past Results and with the EIA Completed for the Extension • Additional Third Party Expert Review of the New Data is Pending: - Toxicologist - Physicist - Plant Phytot
Slide 43: Question Period
Agrium Redwater Fertilizer Operations Question Period www.agrium.com where the future is growing
Slide 44: Background & Detailed Presentation Information
Agrium Redwater Fertilizer Operations Background & Detailed Presentation Information where the future is growing
Slide 45: Background & Detailed Information - Discussion Topics
BACKGROUND & DETAILED INFORMATION - DISCUSSION TOPICS • The Following Slides were Not Part of the Presentation (Due to Time Constraints) & But have been Included for the Agrium Application Process Internet Site: - Application Process: Development Schedule Information - Gypsum Storage Information: Pr
Slide 46: Application Process - Development Schedule
APPLICATION PROCESS - AGRIUM REDWATER DEVELOPMENT SCHEDULE • Development Work for the Application Renewal Started in March of 2005 • We are Scheduled to Submit the Completed Application to Alberta Environment by May 2006 • Application will Take One Year for Alberta Environment to Review & Approve (M
Slide 47: Gypsum Storage Extension - Project Cost Breakdown
GYPSUM STORAGE EXTENSION - PROJECT COST BREAKDOWN • High Level Project Cost Breakdown is as Follows: 1. Engineering 2. Construction - Materials & Labour Including Earthworks, Under Drain & Vent Systems, Slurry Wall, Interceptor Trench, Liner Installation Pumphouse, & Groundwater Wells 3. Project Qua
Slide 48: Liner Installation & Quality Control
GYPSUM STORAGE EXTENSION - LINER INSTALLATION & QUALITY CONTROL • Welding Liner Seam Connections: - All Liner Seams were and are Connected Using a Double Wedge Fusion Welding Technique • Non-Destructive Testing of Welding Liner Seam: - All Liner Seams are Either Air Pressure or Vacuum Box Tested - T
Slide 49: Gypsum Storage Extension - Capacity Information
GYPSUM STORAGE EXTENSION - CAPACITY INFORMATION • Phase I & II Construction will Add an Additional 15 Years of Storage Capacity • Phases I to IV will Provide a Total of 28 Years of Storage Capacity for the Phosphogypsum HAULING EXISTING GYPSUM TO DUMPING EXISTING GYPSUM ON PUSHING GYPSUM UP THE LINE
Slide 50: Gypsum Storage Extension - Groundwater Monitoring Wells
GYPSUM STORAGE EXTENSION - GROUNDWATER MONITORING WELLS TYPICAL GROUNDWATER • Number Of Groundwater Wells WELL DETAIL Installed In Phase I Construction: - 24 Wells (8 Cluster of 3 Wells Each) BENTONITE • Groundwater Well Construction Details: 2” PVC CASING - 2” PVC Casing that is Perforated at the B