Origin Energy Limited · ASX:ORG
Origin Energy — Technical Presentation (September 2011)
17 slides from Origin Energy's technical presentation, Sep 20, 2011
Slide 1: Energy Markets
Energy Markets Presented by Frank Calabria Chief Executive Officer, Energy Markets Origin Operational Review and Asset Visit 19-20 September, 2011
Slide 2: East coast energy markets have undergone deregulation, privatisation and consolidation
Energy markets on the east coast of Australia have undergone a process of deregulation, privatisation and consolidation Electricity Generation Energy Retail MW Origin’s Generation Portfolio Origin’s Retail Portfolio 6,000 5,000 5,000 Under Construction Electricity Customer Numbers ('000) 4,000 Contr
Slide 3: Australian wholesale energy markets exhibit high volatility
Australian wholesale energy markets exhibit high volatility … Volatility in the National Electricity Market 2,000 2,000 Tightness in the 1,500 supply/demand 1,500 Pool Price ($/MWh) balance drives Large quantities of wind • Prices in the wholesale 1,000 extreme high 1,000 in SA drive negative prices
Slide 4: Origin's generation portfolio offers considerable flexibility
Origin’s generation portfolio offers considerable flexibility … Origin’s Peak Electricity Demand and Supply 12,000 • Origin can meet a large portion of its 10,000 retail demand through its installed Contract generation capacity or Spot Installed Market Generation • Significant optionality derives fr
Slide 5: Diversity of operating modes enables rapid ramp to full load
Diversity of operating modes, from base load through to intermediate and peaking, provides the ability to ramp to full load rapidly … Origin’s Generation Operating Modes Origin’s Generation Ramp-Up 6,000 6,000 5,000 5,000 4,000 4,000 Capacity (MW) 3,000 3,000 2,000 2,000 1,000 1,000 0 0 Baseload Int
Slide 6: Access to diverse fuel sources enables optimised supply portfolio
Access to diverse fuel sources enables Origin to optimise its energy supply portfolio Interchangeability of Fuels 3,000 Catalysts that drive fuel-switching: • Electricity market prices • Spark spread between fuels Capacity (MW) 2,000 • High supply from intermittent generation (e.g. wind) 1,000 • A c
Slide 7: Australian energy prices set to increase as networks upgrade and carbon is priced
Australian energy prices are set to increase as networks are upgraded, carbon is priced, and domestic fuel prices approach export parity PJ PJ/a Origin 2011 and Sources FuelUses Supply/Demand of Fuel Generation Carbon Intensity1 300 Third Party Brown Coal Contracts 250 Origin JV Retail & Partners -
Slide 8: Darling Downs Power Stations
Darling Downs Power Stations Presented by Bill Renshaw Asset Operations Manager Origin Operational Review and Asset Visit 19-20 September, 2011
Slide 9: Background
Background • Darling Downs Power Station site purchased with Sun Retail acquisition in February 2007 • Site purchased with approval for a 510 MW open cycle peaking power plant • Origin modified approval to a 640 MW base load combined cycle plant • Amended Development Approval granted June 2007 9|
Slide 10: Site Location
Site Location • Located at Braemar, approx. 40km West of Dalby • Opposite Powerlink 330kV/275kV substation • Strategic site location due to proximity to gas and electricity infrastructure 10 |
Slide 11: Site Details
Site Details • Site area 40.5 Ha • Site originally re-growth scrub • Site operating area cleared • Balance of site left uncleared as buffer zone 11 |
Slide 12: Plant Construction
Plant Construction • Plant constructed by a consortium of General Electric and CH2MHill • Construction commenced in 2007 • Commissioning commenced in 2009 • Commercial operation on July 1, 2010 12 |
Slide 13: Key Design Features
Key Design Features • 3 x 9E gas turbines (GT) (~120 MW each) + 280 MW steam turbine – Proven, unitised => high reliability – 280 MW steam turbine capacity includes use of duct firing • Duct fired heat recovery steam generators (HRSGs) (~100 MWe) – Effective redundancy for 1 GT/HRSG train – Flexible
Slide 14: Operations and Staffing
Operations and Staffing • Cycling Base Load Operation – Continuous operation – Load to suit gas and electricity market requirements • 35 Staff – 24/7 shift coverage, 4 operators per shift – Small maintenance team on day work – Small engineering team on day work – Management and administration on day
Slide 15: Noise and Emissions Mitigation
Noise and Emissions Mitigation • Extensive noise attenuation – GT generators fully enclosed – GT and ST hall sound insulated – ST bypass valves enclosed – BFW pumps enclosed – Low noise ACC fans • Dry low NOx (DLN) combustors on gas turbines 15 |
Slide 16: Water and Wastewater
Water and Wastewater • Water Supply from onsite bore – Onsite bore from Hutton Aquifer • Air cooled condenser – Water consumption 2% of typical coal fired plant • Water recycling – Boiler blowdown re-treated – Demin plant reject re-treated • Wastewater – Wastewater removed from site by road tanker t
Slide 17: Thank you
Thank you 17 |